Urban traffic challenges
Upcoming SlideShare
Loading in...5
×
 

Urban traffic challenges

on

  • 442 views

A final year civil engineering college project .

A final year civil engineering college project .

Statistics

Views

Total Views
442
Views on SlideShare
442
Embed Views
0

Actions

Likes
0
Downloads
2
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Urban traffic challenges Urban traffic challenges Presentation Transcript

  • URBAN TRAFFIC CHALLENGES A study for Urban Traffic Problems in Surat City , its Identification & Solution .
  • Bhagwan Mahavir College Of Engineering & Technology The project is done under the guidance of Mr. RamGopal Sahu • Group Members :  Sahil Baviskar “090060106063”  Prashant Patel “090060106066”  Jimmi Patel “090060106047”  Meet Patel “090060106020”  Vishal Patel “090060106055” 2/22/2014 URBAN TRAFFIC CHALLENGES 2
  • Content • • • • • Introduction Basic Transportation In City Area to be Surveyed Problems Solution/Conclusion 2/22/2014 URBAN TRAFFIC CHALLENGES 3
  • Introduction • Surat is among the fastest developing city in the world . • It has ranked 4th developing city of the world . • Surat city is well-known for its Diamond Polishing Business , Textile Market and recently Real-Estate Business . 2/22/2014 URBAN TRAFFIC CHALLENGES 4
  • • As a city develops it attracts many people around the city as well as far away from the city . • Due to this population Increases ; And one can say that increase in population is directly proportional to the increase in traffic density . • Here, the study of various Traffic congested areas is done and on completion of the whole analysis suitable conclusions will be given . 2/22/2014 URBAN TRAFFIC CHALLENGES 5
  • Growth of Surat City (1494-2004) 2/22/2014 URBAN TRAFFIC CHALLENGES 6
  • Basic Transportation Facilities Available • Air • Rail • Road May come into existence • Water 2/22/2014 URBAN TRAFFIC CHALLENGES 7
  • Area to be Surveyed • • • • • • • Udhana Darwaja * Bhagal Char Rasta * Gujarat Gas Circle (Sardar Bridge) * Station Road Sahara Darwaja U.M. Road Sardar Bridge 2/22/2014 URBAN TRAFFIC CHALLENGES 8
  • GUJARAT GAS CIRCLE (Sardar Bridge) Junction: Gujarat Gas Circle Route: Gujarat Gas Circle to Athwa Gate Date: 30-08-2013 Time: 9:00 A.M. TO 11:00 A.M. TIME 2W 3W 4W LCW HCV 9:00 TO 9:10 A.M. 145 56 73 2 5 9:10 TO 9:20 A.M. 175 67 71 1 0 9:20 TO 9:30 A.M. 235 78 55 9 6 9:30 TO 9:40 A.M. 280 24 89 2 9 9:40 TO 9:50 A.M. 305 70 84 0 8 9:50 TO 10:00 A.M. 234 75 123 3 2 10:00 TO 10:10 A.M. 256 47 88 6 3 10:10 TO 10:20 A.M. 228 89 91 0 0 10:20 TO 10:30 A.M. 340 105 99 1 2 10:30 TO 10:40 A.M. 278 108 244 2 2 10:40 TO 10:50 A.M. 358 135 210 2 1 10:50 TO 11:00 A.M. 355 159 225 2 1 TOTAL 3189 1313 1452 30 39 9
  • GUJARAT GAS CIRCLE (Sardar Bridge) Junction: Gujarat Gas Circle Route: Gujarat Gas Circle to Athwa Gate Date: 30-08-2013 Time: 5:00 P.M. TO 07:00 P.M. TIME 2W 3W 4W LCW HCV 5:00 TO 5:10 P.M. 125 80 116 6 3 5:10 TO 5:20 P.M. 145 96 66 2 4 5:20 TO 5:30 P.M. 178 104 100 9 12 5:30 TO 5:40 P.M. 106 87 36 9 11 5:40 TO 5:50 P.M. 286 100 64 2 0 5:50 TO 6:00 P.M. 235 86 130 5 3 6:00 TO 6:10 P.M. 274 98 135 15 8 6:10 TO 6:20 P.M. 210 86 136 8 3 6:20 TO 6:30 P.M. 301 109 162 7 5 6:30 TO 6:40 P.M. 250 106 138 5 1 6:40 TO 6:50 P.M. 241 121 109 8 1 6:50 TO 7:00 P.M. 289 123 125 19 13 TOTAL 2640 1196 1317 94 64 10
  • GUJARAT GAS CIRCLE (Sardar Bridge) Junction: Gujarat Gas Circle Route: Gujarat Gas Circle to Athwa Gate Date: 31-08-2013 Time: 9:00 A.M. TO 11:00 A.M. TIME 2W 3W 4W LCW HCV 9:00 TO 9:10 A.M. 156 59 61 6 4 9:10 TO 9:20 A.M. 179 51 72 1 1 9:20 TO 9:30 A.M. 210 49 71 3 3 9:30 TO 9:40 A.M. 220 41 66 5 7 9:40 TO 9:50 A.M. 241 62 99 0 5 9:50 TO 10:00 A.M. 274 63 111 3 0 10:00 TO 10:10 A.M. 276 67 64 5 3 10:10 TO 10:20 A.M. 209 81 83 1 0 10:20 TO 10:30 A.M. 291 110 101 1 1 10:30 TO 10:40 A.M. 299 109 230 2 0 10:40 TO 10:50 A.M. 320 124 201 1 1 10:50 TO 11:00 A.M. 342 121 237 2 1 TOTAL 3011 957 1396 30 25 11
  • GUJARAT GAS CIRCLE (Sardar Bridge) Junction: Gujarat Gas Circle Route: Gujarat Gas Circle to Athwa Gate Date: 31-08-2013 Time: 5:00 P.M. TO 07:00 P.M. TIME 2W 3W 4W LCW HCV 5:00 TO 5:10 P.M. 115 90 117 4 2 5:10 TO 5:20 P.M. 135 89 65 0 2 5:20 TO 5:30 P.M. 167 105 120 7 10 5:30 TO 5:40 P.M. 155 54 86 9 8 5:40 TO 5:50 P.M. 244 64 92 3 13 5:50 TO 6:00 P.M. 247 85 129 1 4 6:00 TO 6:10 P.M. 278 93 122 12 9 6:10 TO 6:20 P.M. 190 96 126 3 2 6:20 TO 6:30 P.M. 280 140 178 4 5 6:30 TO 6:40 P.M. 244 106 122 3 10 6:40 TO 6:50 P.M. 262 116 117 6 11 6:50 TO 7:00 P.M. 270 113 127 12 16 TOTAL 2587 1151 1293 64 92 12
  • B.R. CIRCLE (Surat Station) Junction: B.R. Circle Route: Station To B.R. Circle Date: 04-09-2013 Time: 7:00 A.M. TO 9:00 A.M. TIME 2W 3W 4W LCW HCV 7:00 TO 7:10 A.M. 180 111 89 10 12 7:10 TO 7:20 A.M. 245 132 112 8 15 7:20 TO 7:30 A.M. 279 158 123 21 10 7:30 TO 7:40 A.M. 282 164 82 25 16 7:40 TO 7:50 A.M. 315 182 97 29 8 7:50 TO 8:00 A.M. 310 195 79 18 13 8:00 TO 8:10 A.M. 327 187 72 19 13 8:10 TO 8:20 A.M. 380 192 65 22 4 8:20 TO 8:30 A.M. 291 110 101 1 1 8:30 TO 8:40 A.M. 299 109 230 2 0 8:40 TO 8:50 A.M. 320 124 201 1 1 8:50 TO 9:00 A.M. 342 121 237 2 1 TOTAL 3570 1785 1488 158 94 13
  • B.R. CIRCLE (Surat Station) Junction: B.R. Circle Route: Station To B.R. Circle Date: 04-09-2013 Time: 5:00 P.M. TO 07:00 P.M. TIME 2W 3W 4W LCW HCV 5:00 TO 5:10 P.M. 218 87 55 9 3 5:10 TO 5:20 P.M. 324 121 111 8 11 5:20 TO 5:30 P.M. 250 169 98 12 9 5:30 TO 5:40 P.M. 356 154 75 16 8 5:40 TO 5:50 P.M. 325 174 82 13 3 5:50 TO 6:00 P.M. 314 168 65 12 10 6:00 TO 6:10 P.M. 321 118 69 6 6 6:10 TO 6:20 P.M. 384 153 33 14 5 6:20 TO 6:30 P.M. 381 86 113 6 7 6:30 TO 6:40 P.M. 266 105 221 0 1 6:40 TO 6:50 P.M. 298 131 200 3 1 6:50 TO 7:00 P.M. 351 132 285 0 1 TOTAL 3788 1598 1407 99 65 14
  • B.R. CIRCLE (Surat Station) Junction: B.R. Circle Route: B.R. Circle to Suryapur Road Date: 04-09-2013 Time: 7:00 A.M. TO 9:00 A.M. TIME 2W 3W 4W LCW HCV 7:00 TO 7:10 A.M. 373 74 39 8 6 7:10 TO 7:20 A.M. 321 78 41 5 3 7:20 TO 7:30 A.M. 285 110 35 3 1 7:30 TO 7:40 A.M. 295 64 56 2 0 7:40 TO 7:50 A.M. 341 121 65 9 8 7:50 TO 8:00 A.M. 321 156 79 1 3 8:00 TO 8:10 A.M. 273 178 82 9 1 8:10 TO 8:20 A.M. 360 150 31 2 4 8:20 TO 8:30 A.M. 355 141 99 4 3 8:30 TO 8:40 A.M. 298 145 42 9 3 8:40 TO 8:50 A.M. 382 164 102 0 1 8:50 TO 9:00 A.M. 269 131 107 2 1 TOTAL 3873 1512 778 44 34 15
  • B.R. CIRCLE (Surat Station) Junction: B.R. Circle Route: B.R. Circle to Suryapur Road Date: 04-09-2013 Time: 5:00 P.M. TO 07:00 P.M. TIME 2W 3W 4W LCW HCV 5:00 TO 5:10 P.M. 373 74 39 9 6 5:10 TO 5:20 P.M. 324 121 111 8 11 5:20 TO 5:30 P.M. 250 169 98 12 9 5:30 TO 5:40 P.M. 356 154 75 16 8 5:40 TO 5:50 P.M. 325 174 82 13 3 5:50 TO 6:00 P.M. 314 168 65 12 10 6:00 TO 6:10 P.M. 321 118 69 6 6 6:10 TO 6:20 P.M. 384 153 33 14 5 6:20 TO 6:30 P.M. 381 86 113 6 7 6:30 TO 6:40 P.M. 266 105 221 0 1 6:40 TO 6:50 P.M. 298 131 200 3 1 6:50 TO 7:00 P.M. 351 132 285 0 1 TOTAL 3788 1598 1407 99 68 16
  • Problems • • • • • • • Traffic Congestion Parking Difficulties Longer Commuting Difficulties in Non-Motorized Transports Loss of public space Environmental impacts Accidents & Safety 2/22/2014 URBAN TRAFFIC CHALLENGES 17
  • Conclusion • To provide a suitable conclusion to above problems after the completion of the Traffic data analysis of proposed location . • Conclusion would contain an alternate route to the location , change in traffic island or propose a new one , suitable construction of F.O.B or propose a fly-over where-ever the area is in need of . 2/22/2014 URBAN TRAFFIC CHALLENGES 18
  • Thank You ! • Refrances • http://en.wikipedia.org/wiki/Surat#Transportation • http://www.suratmuncipalcorporation.com 2/22/2014 URBAN TRAFFIC CHALLENGES 19