CCTNS Karnataka Overview
Upcoming SlideShare
Loading in...5
×
 

CCTNS Karnataka Overview

on

  • 311 views

CCTNS Karnataka Overview by Sanjay Sahay

CCTNS Karnataka Overview by Sanjay Sahay

Statistics

Views

Total Views
311
Views on SlideShare
241
Embed Views
70

Actions

Likes
0
Downloads
7
Comments
0

2 Embeds 70

http://sanjay-sahay.com 67
http://www.slideee.com 3

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    CCTNS Karnataka Overview CCTNS Karnataka Overview Presentation Transcript

    • Sanjay Sahay, ADGP, Police Computer Wing, Bangalore Police Department CCTNS Karnataka Overview GOVERNMENT OF KARNATAKA
    • Agenda • Computerization at KSP • Where we are • Where we want to be • What support do we need
    • Presentation Structure • Chronology • Enterprise Model • CCTNS Update – Software, Core Infrastructure, Capacity Building • Implementation Issues • Fund Utilization • Integration • Future Plans • Support Required from MHA
    • Chronology of Computerization 1994: CCIS 2005: G-Care 2008: e-Beat 2009: KSP WAN 2010: 'Police IT' 2011: KSP DC 2012: CCTNS P r e - C C T N S C C T N S M/s HP Signs MSA on Dec 7, 2011 as SI M/s GT Signs MSA on Jun 21, 2012 as SPMU
    • Where we are Police Computer Wing – Karnataka State Police
    • KSP Computerization Model Enterprise Model People Process Technology Infrastructure Governance • Internal Champions • Capacity Building • Nodal Officers • Sys Admins • Handholding • BPR • Integration • Automation • ERP • Web Service • Active Directory • SMS Gateway • e-Pen • KSP DC • KSP WAN • DR Centre • EMS • Centralized AV • Automated Backup • Core Team • SCRB Nodal Officer • District Nodal Officer • Central NOC • Helpdesk
    • Police IT - CCTNS • GoI accepted Karnataka as Lead State • Both the Projects get integrated • Mission Mode Project • Wipro, the Developer Police IT CCTNS Lead State CCTNS Police IT
    • CCTNS Software Status Transition • Application Handover to SI • Knowledge Transfer • Exit Management Stabilization • Pending changes • Error Fixing • O&M Support Enhancement • System Study • Functional Specifications • Gap Analysis • 'Police-IT' Enhancements CAS/Go-Live • Citizen Centric Portal • Integration with CAS Center • External Integration • Go-Live ( May 2014) Legends: Completed Yet to be completed
    • Core Functionalities • Crime • Law & Order • Traffic Administration • Administration • Finance • Stores Ancillary support • Armed Reserve • Motor Transport • Training Technical Modules • Wireless • Forensic Science • Laboratory 11 Modules 64 Roles 522 Screen 417 Reports MIS Police IT - ERP
    • CONFEDENTAIL : INTERNAL USE ONLY Core Infrastructure
    • Disaster Recovery Center • Disaster Recovery Center for KSP is located at NIC Data Center, Shastri Park, New Delhi. • NIC has provided 4 racks and Infrastructure facility to host the DR site. • The Network connectivity between DC and DR has been established through 4 Mbps MPLS Link. • The DR Implementation is in progress and DR will be made operational in next 3 months. • Timely Replication requires one-time bandwidth augmentation Sl. No. Name of Device Capacity Quantity 1. Server 10 2 Storage 32 TB 1 3 Network Switches 2 4 SLB / GSLB 1 5 Firewall 1 6 NIPS 1 14 FCIP Router 2 15 FC Switch 1
    • Karnataka State Police Wide Area Network Type of Network Number of Links at Initiation Number of Links at Present MPLS 39 45 VPNoBB 1350 1458 ILL 2 2 Type of Network Initial Bandwidth Present Bandwidth MPLS (Aggregation) 10 Mbps 45 Mbps • Karnataka State Police Wide Area Network, (KSPWAN) was created in the year 2009 with BSNL • This was successfully implemented jointly by BSNL and the Karnataka State Police. • This Network is a combination of 45 MPLS and 1458 VPNoBB connections • Connects all police station and higher offices across the state. • Fixed IP has been implemented on VPNoBB connection • In addition 16 Mbps Internet leased line has also been provided.
    • Network Availability
    • Capacity Building at KSP Training Infrastructure Mapping of End-Users Deployment of Trainers Training for 75 System Administrators Basic Training for End-Users Training Curriculum Basic IT & Police IT Training for Nodal Officers of all Units Training for Technical Teams of all Units Police IT Training for End-Users & Handholding
    • Capacity Building under CCTNS Basic IT • 36 Trainers • Training at 30 locations • 48th Batch till Mar2014 • Trained 27,947 till end of Mar, 2014 Police-IT • 13 Trainers • Training at 16 locations • 25th Batch till Mar 2014 • Trained 4169 till end of Mar, 2014 Basic System Admin • A+/N+ Curriculum • 6th Batch till Mar 2014 • Trained 169 till end of Mar, 2014 Pre-CCTNS Training Basic IT • 6000 Police IT • 12000 System Admin • 75
    • Project Implementation Delays Project Tracks Deliverable Timelines as per MSA (in weeks) Actual Time Status/Expected Closure Software Go-Live for complete CCTNS Solution 52 130 20-05-2014 DC-DR Deployment and Installation of Hardware 34 47 Completed DR Completion 52 134 15-06-2014 Capacity Building Police IT Training 38 156 07-12-2014 Capacity Building and Change Management 38 156 07-12-2014 Data Digitization Get final sign off from State Nodal Officer for migrated / digitized data 52 156 07-12-2014 Site Preparation Site Survey 8 35 Completed Site Preparation 35 55 Completed Client Site Hardware Supply and Commissioning of Hardware for 1370 Locations 36 55 Completed Handholding Deployment of 205 Resources 11 120 07-04-2014
    • Project Delays • Team Mobilization by SI • Transition between the previous and current SI • Decision making at senior management levels of SI People Issues • Quality of handholding resources for local troubleshooting • Quality of Trainers • Absenteeism from training programs • Use of system administrators for non-technical purposes Project Challenges
    • Sl. No. Cost Components Funds Released Till date (in Lakhs) Utilization during the reporting Month (in Lakhs) Total Utilization Till Date (in Lakhs) Balance funds available (in Lakhs) 1 2 3 (4=1-3) 1 Capacity Building Training 78.5 0 135.4432 -56.9432 Infrastructure 298 0 278.9223 19.0777 2 Project Management Consultancy SPMC 93.75 0 90.446 3.304 SPMU 91.42 0 207.53276 -116.11276 3 System Integrator - 1676.47 0 1708.40081 -31.93081 4 Networking - 919.18 0 708.22156 210.95844 5 Additional Funds released for Advanced States Hand Holding 79.73 0 93.29744 -13.56744 6 *Others *Head wise Breakup Not provided by MHA 1432.97905 0 0 1432.97905 Total 4670.02905 0 3222.26407 1447.76498 FUND UTILIZATION STATUS AS ON 28 FEB 2014
    • Hardware Inventory Sl. No. Computers & Peripherals Total 1 Desktops 8233 2 Thin Clients 1585 3 Laptop 614 4 Laser Jet Printers 1478 5 MFPs 1419 6 Dot Matrix Printer 1447 7 Servers 198 8 UPS 4464 9 Scanner 1235 10 Web Camera 882 11 LCD TV 37 12 Switches 2180 13 Projector 74 12 Digital Cameras 906 13 Electronic Pens 906 14 External Hard disk 1317 Total Hardware 26975 Total Hardware Hardware at each Unit Sl. No Unit Server Desktops Laptop Scanner DMP Laser MFP UPS 1 Police Station - 5 - 1 1 1 - 2 2 Circle Office - 3 - 1 1 - 1 2 3 Sub Division Office - 3 - 1 1 - 1 2 4 District Police Office 1 50 4 10 15 20 15 10
    • Integration: SMS and e-Pen SMS Integration  Citizen can track status of his/her application on website of 'Sakala'/KSP using GSC number  Citizen to get SMS update at every stage of FIR lifecycle • Registration • A-Report, B-Report, C-Report • Disposal e-Pen Integration  FIR copy to be signed electronically at time of filing • By Complainant • By Processing Officer  Greater assurance to citizens for service delivery  Transparency in process  Authenticity of information  No scope for Suppression of facts /Denial of service
    • Integration: Service Delivery Scheme under 'Sakala'  15 digit unique GSC number through SMS  Track status on website of 'Sakala'/KSP  Status Update Through SMS
    • Sl. Service Name (Under Karnataka Guarantee Of Services to Citizen Act - Sakala) Maximum no. of days to get service delivered 1 Arms License Issue and Renewal Verification 30 2 Certification of Finger Print 20 3 Issue of copy of FIR to the complainant 1 4 License for Amplified Sound System 3 5 License for Amusement 15 6 Missing Report of documents, Mobile phone etc. 1 7 No objection to return to India permission in respect of Tibetans 20 8 No obligation to return to India (NORI) Certificate 20 9 NOC for Passport Verification 20 10 NOC for petrol pump, gas-agency, hotel, bar etc. 7 11 NOC for Residential Permit Extension 7 12 Permission for Peaceful Assembly and procession 15 13 Police Clearance Certificate 20 14 Police verification Certificate for Coolies/Loader/Class IV Security Staff/Supervisor at Airport 20 15 Police Verification Certificate for domestic servants/house keeping 20 16 Police Verification Certificate for Institutions/ Companies 20 17 Police verification Certificate for Marriage Alliances 20 18 Police verification Certificate for Training Apprenticeship at PSUs/trainees/Workers at Govt. Institutions 20 19 PVC for Central /State Govt. employees if request is received directly by the employee 20 20 Receipt and Disposal of Petitions 45 21 Service Verification 20 Citizen Centric Services Under 'Sakala'
    • • Integration using web-service • Electronic FIR Transfer • Electronic Charge- sheet Transfer • Online Acknowledgment from Courts Integratio n: Court KSP-DC High Court Server Jurisdictional Courts Jurisdictional PS e-Court Police-IT FIR&Charge- sheets Acknowledgments
    • Legacy Systems G-CARE • GIS based Crime Analysis • Crime hotspots on map AFIS • Database of 3 Lakhs Criminals fingerprint (FP) • Automatic FP Verification Mail • Zimbra Mail Messaging • Internal communication mechanism e-Beat • Electronic beat system • RFID based
    • Where we want to be Police Computer Wing – Karnataka State Police
    • Future Plans Advanced Solutions CCTNS - II Crime Analytics Mobile Data Terminal CAD based PCR AVLS Traffic Management system Business Intelligence CCTNS Phase II • Crime Analytics • Mobile Data Terminal • CAD based PCR • AVLS • Traffic Management system • Business Intelligence
    • Future Plans Integration with Police IT External System Integration Police IT Finger Print Unit Traffic Manage ment Court JailRTO RPO UID • Finger Print Unit • Traffic Management • Court • Jail • RTO • RPO • UID
    • Future Plans Advanced Solutions • Commenced secondary research • Building upon NCRB guidelines • Team working with Identified Technology Partners • IBM, Oracle, Target, Unisys, Navigem, Microsoft • Plan to develop concept notes and RFP by May 2014
    • Future Plans Court Integration • FIR Integration completed • Charge-sheet under progress RPO Integration • Functional Integration achieved • Integration between systems agreed on principle 'Sakala' & G-Care • 21 citizen centric services already integrated with 'Sakala' system • Police IT system integrated with G-CARE Prison & Treasury • Integration awaiting readiness of the other sides
    • Partnership with e-Governance Department
    • Future Plans • ISO 27001 Security Policy • Building Redundant link at all levels for failover protection • Switch over to fibre based connectivity from copper based • Any time any ware access with data, voice and Video over SSL VPN • Bandwidth optimization and prioritization. • Video Conference between jails and courts for trials
    • What support we need to realize the vision? Police Computer Wing – Karnataka State Police
    • Support Required from MHA • Sharing of Technical Data and documentation to expedite on-going implementation • Funding for advanced solutions (to start post June 2014) • Additional fund for capacity building – Technical certification programs • Funding for full network infrastructure • 'On Demand' Bandwidth Augmentation between DC-DR • Fund to take up Change Requests
    • CONFEDENTAIL : INTERNAL USE ONLY
    • Internal Resources for CCTNS Project Resources Number SCRB Nodal Officers 26 District / City / Units Nodal Officers 94 System Administrators (MCSE and CCNA) 75 Police IT Operators 3000
    • External Resources SPMU (GT India) Role Qualifications Project Manager B. Tech + MBA Infrastructure Specialist B. Tech Database and Application Specialist B. Tech Operation Manager B. Com + Domain Expert Consultant MCA SI (HP India) Team Number Core Management 2 Team leads 5 Software Team 30 DC Operations 6 Trainers 35 Hand-holder 115