Hamilton Cycling Club Singletrack Trail System Proposal Christie Conservation Area
Previous Meeting – 01.25.11 <ul><li>HCA offers HCC the opportunity to propose a network of single-track trails, at least 1...
Intervening Activities <ul><li>01.29.11 - HCC scouts the South Shore on foot </li></ul><ul><li>02.06.11 - HCC makes GPS tr...
Basic Trail Rating
(completion summer 2011) existing doubletrack trails – 7.5km proposed singletrack trails – 10km
existing doubletrack trails – 7.5km proposed singletrack trails – 10km (completion summer 2011) proposed difficult trails ...
Technical Trail Features Constructed features can both serve a function and challenge riders.
Trail Care Crew Visit Example Schedule THURSDAY Casual meeting or lunch with the crew and hosts Ride or hike with the crew...
Memorandum of Understanding <ul><li>An MOU is a basic non-binding document that outlines the expectations set-forth for th...
Trail Plan
It’s ON!
It’s ON!
It’s ON!
It’s ON!
The End?
Upcoming SlideShare
Loading in...5
×

Christie Lake Trail-building Project

10,611

Published on

Overview of the mountain bike trail-building project involving Hamilton Cycling Club, Hamilton Conservation Area and many other supporters and friends.

Published in: Sports
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
10,611
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
4
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Christie Lake Trail-building Project

  1. 1. Hamilton Cycling Club Singletrack Trail System Proposal Christie Conservation Area
  2. 2. Previous Meeting – 01.25.11 <ul><li>HCA offers HCC the opportunity to propose a network of single-track trails, at least 10 km in length, through the South Shore of Christie Conservation Area </li></ul><ul><li>HCC gladly accepts challenge! </li></ul>
  3. 3. Intervening Activities <ul><li>01.29.11 - HCC scouts the South Shore on foot </li></ul><ul><li>02.06.11 - HCC makes GPS track of existing double-track trails </li></ul><ul><li>HCC creates a map of existing double-track trails </li></ul>
  4. 4. Basic Trail Rating
  5. 5. (completion summer 2011) existing doubletrack trails – 7.5km proposed singletrack trails – 10km
  6. 6. existing doubletrack trails – 7.5km proposed singletrack trails – 10km (completion summer 2011) proposed difficult trails – 4km (summer 2012)
  7. 7. Technical Trail Features Constructed features can both serve a function and challenge riders.
  8. 8. Trail Care Crew Visit Example Schedule THURSDAY Casual meeting or lunch with the crew and hosts Ride or hike with the crew so they can get a feel for the area/ trails FRIDAY Five hours to a full day to assess proposed trail project site and flag it. Please no more than two or three people in addition to the crew Meet with land managers, city officials, trail users, etc. for presentations and/or informal discussion (optional) Social event (optional) SATURDAY: IMBA TRAILBUILDING SCHOOL Trail building classroom instruction (9 a.m. - noon) Lunch (noon - 1 p.m.) Build trail in the afternoon (1 p.m. - 4 p.m.) SUNDAY Ride in the morning. Optional social lunch. Please do not plan a second build day. April 7 th -10 th 2011
  9. 9. Memorandum of Understanding <ul><li>An MOU is a basic non-binding document that outlines the expectations set-forth for this project </li></ul><ul><li>It can be updated as activities evolve </li></ul>
  10. 10. Trail Plan
  11. 11. It’s ON!
  12. 12. It’s ON!
  13. 13. It’s ON!
  14. 14. It’s ON!
  15. 15. The End?
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×