Your SlideShare is downloading. ×
Product Backlog Priority Overview
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Saving this for later?

Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime - even offline.

Text the download link to your phone

Standard text messaging rates apply

Product Backlog Priority Overview

592
views

Published on

Product Backlog Priority

Product Backlog Priority

Published in: Sports, Technology

0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
592
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
24
Comments
0
Likes
1
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Product Backlog - Priority Overview For more information: www.Agile101.net Product Backlog Calculations Total number of Story Points in Backlog 0 Sprint Duration (days) <enter sprint duration (days> Total Value of Story Points in Backlog 0 Team velocity <enter velocity (story points)> Team day rate <enter team day rate> Story Size vs. Value - Quadrants by Priority 55 50 Budget driven? - If not, leave blank Budget <enter maximum budget> 45 Project duration (Sprints) #DIV/0! Available Capacity (St.Points) #DIV/0! 40 Booked (St.Points) 0 % Backlog Delivered #DIV/0! 35 Restrict (by a featured category)? <restrict by category name> Value Points 30 Scope driven (by %) 25 Minimum number of Points <enter number of points required> Budget required #DIV/0! 20 15 10 5 0 0 10 20 30 40 50 Story Points Sprint Number Velocity Value Sprint 1 0 0 Sprint 2 0 0 Sprint 3 0 0 Sprint 4 0 0 Sprint 5 0 0 Sprint 6 0 0 Sprint 7 0 0 Sprint 8 0 0 Sprint 9 0 0 Sprint 10 0 0 Sprint 11 0 0 Sprint 12 0 0 Sprint 13 0 0 Sprint 14 0 0 Sprint 15 0 0 Sprint 16 0 0 Sprint 17 0 0 Sprint 18 0 0 Sprint 19 0 0 Sprint 20 0 0 Sprint 21 0 0 Sprint 22 0 0 Sprint 23 0 0 Sprint 24 0 0 Sprint 25 0 0 © 2009 Agile101.net
  • 2. t Backlog User Story Conditions of Satisfaction Story Pts Value Pts Priority Sprint 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02/10/2010
  • 3. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02/10/2010
  • 4. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02/10/2010