Murray Hiigs Head of Facilities and Estates...

Murray Hiigs Head of Facilities and Estates
at SEEVIC relayed experiences of setting up learning spaces in a town centre office block.

More in: Education
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
730
On Slideshare
730
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
6
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Murray Higgs Head of Facilities and Estates 3 rd February 2011 Refurbishment Forum.
  • 2. Basildon – Where, What and Why The History
    • An LSC competition was won by SEEVIC College in partnership with other providers to deliver key areas of learning currently unavailable or considered poor.
    • LSC Funding was made available for a new town centre campus 100% funded from a mix of the FE fund and the 16-19 fund.
    • The Campus was designed to be a “Debenhams of Learning” with delivery by a number of providers.
    02 | Respect Responsibility Results | Seevic College | 03 February 2011
  • 3. Basildon – Where, What and Why The History 03 | Respect Responsibility Results | Seevic College | 03 February 2011
  • 4. Basildon – An Interim solution
    • We needed to set up a learning solution very quickly to provide for the high level of NEETs in Basildon.
    • Again LSC Funding was made available from the 16-19 fund for an interim solution.
    • We received capital approval in April 2008 and needed to be ready for September 2008. It was always going to be a challenge.
    04 | Respect Responsibility Results | Seevic College | 03 February 2011
  • 5. Basildon – An Interim solution The Icon
    • Locating a suitable property led us to the Icon
    • 4 retail units which could be joined together available as “Shell and Core” in a newly finished residential block.
    05 | Respect Responsibility Results | Seevic College | 03 February 2011
  • 6. 6 | Respect Responsibility Results | Seevic College | 03 February 2011
  • 7. 07 | Respect Responsibility Results | Seevic College | 03 February 2011
  • 8. And then it all stopped!! 08 | Respect Responsibility Results | Seevic College | 03 February 2011
  • 9. A Refurbishment Option?
  • 10. Basildon – A Refurbishment Option
    • What would suit for the learning Planned?
    • How much to spend?
    • How much space do we need?
    • Vacant office accommodation in Basildon
    • Location, Location, Location
    10 | Respect Responsibility Results | Seevic College | 03 February 2011
  • 11. SEEVIC College The ICON SEEVIC College Church Walk House New Campus site Basildon Town Centre Town Square CU Building North 11 | Respect Responsibility Results | Seevic College | 03 February 2011
  • 12. CU Building 600m 2 per floor 8 floors 12 | Respect Responsibility Results | Seevic College | 03 February 2011
  • 13. 13 | Respect Responsibility Results | Seevic College | 03 February 2011
  • 14. 14 | Respect Responsibility Results | Seevic College | 03 February 2011
  • 15. Getting There 15 | Respect Responsibility Results | Seevic College | 03 February 2011
  • 16. 16 | Respect Responsibility Results | Seevic College | 03 February 2011
  • 17. 17 | Respect Responsibility Results | Seevic College | 03 February 2011
  • 18. 18 | Respect Responsibility Results | Seevic College | 03 February 2011
  • 19. Any Questions????