4/22/2011<br />1<br />Merik Building Construction Consultants<br />Merik – Roofing, Waterproofing and Exterior Wall Proble...
Merik Commitment to Successful Projects<br />The impact to the building occupants and operations will be minimized<br />A ...
Our People<br />The Firm<br />Merik Structured Approach to Successful Projects<br />Client References<br />Project Profile...
Our People<br />Patrick L. Downey, RRC, CCCA<br />Eric B. Downey, RRO, CDT<br />Terry Hale, RRO, Field Technical Rep<br />...
Professional Association Certifications<br />RCI, the institute of roof, wall and building envelope professionals<br />Reg...
Service to the Industry<br />Patrick L. Downey<br />RCI Institute Past President<br />CSI Atlanta Chapter Past President<b...
CSI Citation 2005, “One Park Place Reroof”, first place specification manual.<br />CSI Citation 2000, “Reroof of Woodland ...
The Firm<br />Established in 1985<br />Specializes in renovation of existing structures<br />Focused in roofing, walls and...
A Structured Process Leading to Successful Projects<br />Due Diligence Stage<br />Specification Development<br />Bid Stage...
Interviews with the Facility Engineer or Building Rep<br />Study “As Built” drawings<br />Satellite imaging of roof areas<...
CSI MasterSpec format for all Merik specification sections<br />Client front end includes OO Sections, General Conditions,...
Pre-bid Conference<br />Addendum<br />Bid Opening<br />Submittals<br />Preconstruction Conference<br />4/22/2011<br />12<b...
Construction Contract Administration<br />Submittals, Pay Requests, Change Orders, Progress Meetings, Non-Conforming Work ...
Partial Client References List<br />University of Georgia – 128<br />Georgia State University – 66<br />Carmax Auto Dealer...
4/22/2011<br />Merik Building Construction Consultants<br />15<br />Project Profiles – University of Georgia<br />
4/22/2011<br />16<br />Merik Building Construction Consultants<br />Project Profiles – Georgia State University<br />
4/22/2011<br />Merik Building Construction Consultants<br />17<br />Project Profiles – Georgia Building Authority<br />
4/22/2011<br />Merik Building Construction Consultants<br />18<br />Project Profiles – Fulton County Schools<br />
4/22/2011<br />Merik Building Construction Consultants<br />19<br />Project Profiles – Haverty Furniture Company<br />
4/22/2011<br />Merik Building Construction Consultants<br />20<br />Project Profiles - Carmax<br />
4/22/2011<br />21<br />Merik Building Construction Consultants<br />Architectural Integrity    Park Hall – UGA<br />Before...
4/22/2011<br />22<br />Merik Building Construction Consultants<br />Architectural Integrity    Park Hall – UGA 		<br />Bef...
4/22/2011<br />23<br />Merik Building Construction Consultants<br />Architectural Integrity    Snelling Hall - UGA<br />Be...
Architectural Integrity    Snelling Hall - UGA<br />4/22/2011<br />Merik Building Construction Consultants<br />24<br />Be...
Brick Cavity Wall Flashing Retrofit <br />4/22/2011<br />Merik Building Construction Consultants<br />25<br />
Plaza Deck Waterproofing with Paver Protection<br />4/22/2011<br />Merik Building Construction Consultants<br />26<br />
Plaza Deck Waterproofing with Raised Paver System<br />4/22/2011<br />Merik Building Construction Consultants<br />27<br />
Elastomeric Wall Coating and Sealant Application<br />4/22/2011<br />Merik Building Construction Consultants<br />28<br />
Window Replacement<br />4/22/2011<br />Merik Building Construction Consultants<br />29<br />
Fenestration Commissioning<br />New Construction and Renovation Projects<br />Independent Third Party Testing<br />Test St...
Simulate Wind Driven Rain Events<br />Calibrated Spray Rack certified to meet test standards.<br />AAMA 502.9 A or B<br />...
Identify Failures and Retest Repairs<br />4/22/2011<br />Merik Building Construction Consultants<br />32<br />
Merik’s Commitment to our Clients<br />We understand the work must be done in a manner that does not impact  building oper...
Upcoming SlideShare
Loading in …5
×

Merik PowerPoint

976 views

Published on

Published in: Design
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
976
On SlideShare
0
From Embeds
0
Number of Embeds
115
Actions
Shares
0
Downloads
0
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

Merik PowerPoint

  1. 1. 4/22/2011<br />1<br />Merik Building Construction Consultants<br />Merik – Roofing, Waterproofing and Exterior Wall Problem Solving<br />
  2. 2. Merik Commitment to Successful Projects<br />The impact to the building occupants and operations will be minimized<br />A successful project will be completed on time and in budget<br />The construction process will strictly adhere to the Client’s procedures and requirements<br />Merik will keep the facility representatives up to date throughout the work<br />4/22/2011<br />Merik Building Construction Consultants<br />2<br />
  3. 3. Our People<br />The Firm<br />Merik Structured Approach to Successful Projects<br />Client References<br />Project Profiles<br />4/22/2011<br />3<br />Merik Building Construction Consultants<br />Merik Professional Capabilities<br />
  4. 4. Our People<br />Patrick L. Downey, RRC, CCCA<br />Eric B. Downey, RRO, CDT<br />Terry Hale, RRO, Field Technical Rep<br />Rosanna Rennie, Architectural Designer, LEED AP<br />4/22/2011<br />Merik Building Construction Consultants<br />4<br />
  5. 5. Professional Association Certifications<br />RCI, the institute of roof, wall and building envelope professionals<br />Registered Roof Consultant <br />Registered Roof Observer<br />CSI, the construction specifications institute<br />Certified Construction Contract Administrator<br />LEED integrated sustainable design and energy efficiency<br />4/22/2011<br />Merik Building Construction Consultants<br />5<br />
  6. 6. Service to the Industry<br />Patrick L. Downey<br />RCI Institute Past President<br />CSI Atlanta Chapter Past President<br />RCI Georgia Chapter Past President<br />Eric B. Downey<br />RCI Georgia Chapter Past President<br />Rosanna Rennie<br />LEED AP<br />4/22/2011<br />Merik Building Construction Consultants<br />6<br />
  7. 7. CSI Citation 2005, “One Park Place Reroof”, first place specification manual.<br />CSI Citation 2000, “Reroof of Woodland Middle School”, first place specification manual.<br />RCI National First Place Roof Report 1999, “Sparks Hall Moisture Survey”. <br />CSI Citation 1998, “Art & Music Building Reroof”, first place specification manual.<br />4/22/2011<br />7<br />Merik Building Construction Consultants<br />Award Winning Documents<br />
  8. 8. The Firm<br />Established in 1985<br />Specializes in renovation of existing structures<br />Focused in roofing, walls and plaza deck waterproofing <br />Our area of operations is Georgia<br />Design team includes Structural and Mechanical Engineers<br />4/22/2011<br />Merik Building Construction Consultants<br />8<br />
  9. 9. A Structured Process Leading to Successful Projects<br />Due Diligence Stage<br />Specification Development<br />Bid Stage<br />Construction Stage<br />Project Close-out<br />4/22/2011<br />Merik Building Construction Consultants<br />9<br />
  10. 10. Interviews with the Facility Engineer or Building Rep<br />Study “As Built” drawings<br />Satellite imaging of roof areas<br />3 Types of Building Surveys: <br />Level I – Observational<br />Level II – Investigative<br />Level III - Moisture Scans<br />Asbestos and lead testing<br />4/22/2011<br />10<br />Merik Building Construction Consultants<br />The Due Diligence Stage<br />
  11. 11. CSI MasterSpec format for all Merik specification sections<br />Client front end includes OO Sections, General Conditions, Supplementary Conditions, Special Conditions<br />Construction drawings in AutoCAD format<br />Project Manual review by Client<br />Documents prepared in electronic format – Project Manual in Adobe PDF format for internet posting and download<br />4/22/2011<br />11<br />Merik Building Construction Consultants<br />Specification Development <br />
  12. 12. Pre-bid Conference<br />Addendum<br />Bid Opening<br />Submittals<br />Preconstruction Conference<br />4/22/2011<br />12<br />Merik Building Construction Consultants<br />Bid Stage<br />
  13. 13. Construction Contract Administration<br />Submittals, Pay Requests, Change Orders, Progress Meetings, Non-Conforming Work Notices<br />Construction Observation<br />Daily Reports<br />Weekly Summary Reports<br />Final Inspection<br />Punchlist Report<br />Project Close-out Documents<br />4/22/2011<br />13<br />Merik Building Construction Consultants<br />Construction Stage <br />
  14. 14. Partial Client References List<br />University of Georgia – 128<br />Georgia State University – 66<br />Carmax Auto Dealerships – 43<br />Haverty Furniture Company – 28<br />TCSG (Technical Colleges) - 42<br />Archdiocese of Atlanta – 16<br />Fulton County Schools – 17<br />Georgia Building Authority - 13<br />4/22/2011<br />Merik Building Construction Consultants<br />14<br />
  15. 15. 4/22/2011<br />Merik Building Construction Consultants<br />15<br />Project Profiles – University of Georgia<br />
  16. 16. 4/22/2011<br />16<br />Merik Building Construction Consultants<br />Project Profiles – Georgia State University<br />
  17. 17. 4/22/2011<br />Merik Building Construction Consultants<br />17<br />Project Profiles – Georgia Building Authority<br />
  18. 18. 4/22/2011<br />Merik Building Construction Consultants<br />18<br />Project Profiles – Fulton County Schools<br />
  19. 19. 4/22/2011<br />Merik Building Construction Consultants<br />19<br />Project Profiles – Haverty Furniture Company<br />
  20. 20. 4/22/2011<br />Merik Building Construction Consultants<br />20<br />Project Profiles - Carmax<br />
  21. 21. 4/22/2011<br />21<br />Merik Building Construction Consultants<br />Architectural Integrity Park Hall – UGA<br />Before After<br />
  22. 22. 4/22/2011<br />22<br />Merik Building Construction Consultants<br />Architectural Integrity Park Hall – UGA <br />Before After<br />
  23. 23. 4/22/2011<br />23<br />Merik Building Construction Consultants<br />Architectural Integrity Snelling Hall - UGA<br />Before After<br />
  24. 24. Architectural Integrity Snelling Hall - UGA<br />4/22/2011<br />Merik Building Construction Consultants<br />24<br />Before After<br />
  25. 25. Brick Cavity Wall Flashing Retrofit <br />4/22/2011<br />Merik Building Construction Consultants<br />25<br />
  26. 26. Plaza Deck Waterproofing with Paver Protection<br />4/22/2011<br />Merik Building Construction Consultants<br />26<br />
  27. 27. Plaza Deck Waterproofing with Raised Paver System<br />4/22/2011<br />Merik Building Construction Consultants<br />27<br />
  28. 28. Elastomeric Wall Coating and Sealant Application<br />4/22/2011<br />Merik Building Construction Consultants<br />28<br />
  29. 29. Window Replacement<br />4/22/2011<br />Merik Building Construction Consultants<br />29<br />
  30. 30. Fenestration Commissioning<br />New Construction and Renovation Projects<br />Independent Third Party Testing<br />Test Storefront Systems, Curtainwalls, Individual Windows, and Doors before the project is closed-out.<br />Test mockups for performance and random test installed units to validate mockup standards have been maintained.<br />4/22/2011<br />30<br />Merik Building Construction Consultants<br />
  31. 31. Simulate Wind Driven Rain Events<br />Calibrated Spray Rack certified to meet test standards.<br />AAMA 502.9 A or B<br />ASTM E331<br />ASTM E1105<br />4/22/2011<br />Merik Building Construction Consultants<br />31<br />
  32. 32. Identify Failures and Retest Repairs<br />4/22/2011<br />Merik Building Construction Consultants<br />32<br />
  33. 33. Merik’s Commitment to our Clients<br />We understand the work must be done in a manner that does not impact building operations.<br />We have 25 years of experience dealing with complicated renovation projects.<br />We have the technical credentials of proven training and knowledge.<br />We commit ourselves to providing the highest level of professional service.<br />4/22/2011<br />Merik Building Construction Consultants<br />33<br />

×