CARMON CREEK PROJECT
IN SITU HEAVY OIL
Process map
4

Purchased Sweet
Fuel Gas

Co-generation

Co-generation and
Steam Fac...
CARMON CREEK PROJECT
IN SITU HEAVY OIL
Process map
4

Purchased Sweet
Fuel Gas

Co-generation

Co-generation and
Steam Fac...
CARMON CREEK PROJECT
IN SITU HEAVY OIL
Peace River leases and Carmon Creek Phase 1 and 2 Development
Lakes
TWP.86 RNG.20
W...
CARMON CREEK PROJECT
IN SITU HEAVY OIL
Peace River leases and Carmon Creek
Phase 1 and 2 Development
Lakes
Lakes
TWP.86 RN...
CARMON CREEK PROJECT
IN SITU HEAVY OIL
Well Pads
CARMON CREEK PROJECT
IN SITU HEAVY OIL
Central Processing Facilities
CARMON CREEK PROJECT
IN SITU HEAVY OIL
Upcoming SlideShare
Loading in...5
×

CARMON CREEK PROJECT - IN SITU HEAVY OIL

43,675

Published on

With our Carmon Creek Project, Shell will be a leader among in situ operations with our efforts to minimize impacts to air, water and land.

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
43,675
On Slideshare
0
From Embeds
0
Number of Embeds
22
Actions
Shares
0
Downloads
69
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Transcript of "CARMON CREEK PROJECT - IN SITU HEAVY OIL"

  1. 1. CARMON CREEK PROJECT IN SITU HEAVY OIL Process map 4 Purchased Sweet Fuel Gas Co-generation Co-generation and Steam Facilities 6 Rights-of-way – On-site Make-up Water Treated Gas Rights-of-way – On-site Recycled Water 6 7 Rights-of-way – On-site 1 Vertical Steam Drive Wells 5 Gas Pipeline Gathering System 3 Bitumen Processing Bitumen Rights-of-way – On-site 7 Bitumen, Water and Gas 2 Produced Bitumen, Water and Gas Steam and Condensed Water Rights-of-way – Off-site Bitumen Sales Well Pads Production Well 48 wells will be drilled per pad. H2S to Deep Well Disposal Water Treatment Water 6 600 metres Steam Injection Well Rights-of-way – Off-site Diluent Steam Excess Power to Regional Grid 6 8 People
  2. 2. CARMON CREEK PROJECT IN SITU HEAVY OIL Process map 4 Purchased Sweet Fuel Gas Co-generation Co-generation and Steam Facilities 6 Rights-of-way – On-site Make-up Water Treated Gas Rights-of-way – On-site Recycled Water 6 7 Rights-of-way – On-site 1 Vertical Steam Drive Wells 5 Gas Pipeline Gathering System 3 Bitumen Processing Bitumen Rights-of-way – On-site 7 Bitumen, Water and Gas 2 Produced Bitumen, Water and Gas Rights-of-way – Off-site Bitumen Sales Well Pads Production Well Steam and Condensed Water H2S to Deep Well Disposal Water Treatment Water 6 600 meters Steam Injection Well Rights-of-way – Off-site Diluent Steam Excess Power to Regional Grid 6 8 People
  3. 3. CARMON CREEK PROJECT IN SITU HEAVY OIL Peace River leases and Carmon Creek Phase 1 and 2 Development Lakes TWP.86 RNG.20 W5 TWP.86 RNG.19 W5 Lakes Riv er TWP.86 RNG.21 W5 TWP.86 RNG.22 W5 986 Cadotte Lake Reserve TWP.86 RNG.18 W5 Cadotte Lake Reserve TWP.86 RNG.18 W5 TWP.86 RNG.17 W5 TWP Cadotte TWP.86 RNG.16 W5 TWP.86 RNG.17 W5 Pe ac eR ive TWP.86 RNG.19 W5 Pe ac e TWP.86 RNG.20 W5 r TWP.86 RNG.21 W5 TWP.86 RNG.22 W5 986 TWP.85 RNG.21 W5 TWP.85 RNG.22 W5 TWP.85 RNG.20 W5 Three Creeks TWP.85 RNG.16 W5 Phase 1 and 2 Development Location Cliffdale Battery Weberville TWP.84 RNG.21 W5 TWP.84 RNG.20 W5 TWP.84 RNG.20 W5 TWP.84 RNG.19 W5 TWP.84 RNG.18 W5 688 TWP.83 RNG.21 W5 Sm TWP.83 RNG.20 W5 TWP.83 RNG.20 W5 TWP.83 RNG.19 W5 744 TWP.83 RNG.21 W5 TWP.83 RNG.22 W5 TWP.83 RNG.17 W5 TWP TWP.84 RNG.16 W5 TWP.84 RNG.17 W5 TWP.83 RNG.19 W5 TWP.83 RNG.18 W5 2 o k y Ri ver TWP.83 RNG.22 W5 68 4 West TWP 68 4 r ive tR Town of Peace River West Wesley Creek He ar Cliffdale Battery TWP.84 RNG.17 W5 r ive tR Peace River Landing Settlement TWP.84 RNG.18 W5 Wesley Creek He ar Town of Peace River TWP.84 RNG.19 W5 688 TWP.84 RNG.21 W5 LEASES Peace River Landing Settlement TWP.83 RNG.18 W5 TWP.83 RNG.16 W5 TWP.83 RNG.17 W5 744 2 o k y Ri ver TWP Phase 1 and 2 Development Location 743 Weberville Sm Carmon Creek Central Processing TWP.85 RNG.17 Facilities W5 Carmon Creek Central Processing TWP.85 RNG.17 Facilities W5 LEASES TWP.84 RNG.22 W5 TWP.84 RNG.22 W5 Peace River TWP.85 RNG.18 Complex W5 TWP.85 RNG.19 W5 Peace River Three Creeks TWP.85 RNG.18 Complex W5 TWP.85 RNG.19 W5 743 TWP.85 RNG.21 W5 TWP.85 RNG.22 W5 TWP.85 RNG.20 W5 Peace River Leases 0 Project Area 0 3,500 7,000 14,000 3,500 21,000 7,000 14,000 28,000 Meters 21,000 28,000 Meters
  4. 4. CARMON CREEK PROJECT IN SITU HEAVY OIL Peace River leases and Carmon Creek Phase 1 and 2 Development Lakes Lakes TWP.86 RNG.18 W5 Cadotte Lake Reserve Cadotte LakeTWP.86 RNG.18 Reserve TWP.86 RNG.19 W5 Cadotte TWP.86 RNG.16 W5 TWP.86 RNG.17 W5 Cadotte W5 TWP.86 RNG.16 W5 TWP.86 RNG.17 W5 Pe ac Pe eR 986 ive TWP.86 RNG.19 W5 TWP.86 RNG.20 W5 ac eR TWP.86 RNG.20 W5 ive r TWP.86 RNG.21 W5 TWP.86 RNG.22 W5 r TWP.86 RNG.21 W5 TWP.86 RNG.22 W5 986 ALBERTA TWP.85 RNG.20 W5 TWP.85 RNG.21 W5 TWP.85 RNG.22 W5 Peace River TWP.85 RNG.18 Complex W5 TWP.85 RNG.20 W5 TWP.85 RNG.21 W5 TWP.85 RNG.22 W5 TWP.85 RNG.19 W5 Peace River TWP.85 RNG.18 Complex W5 Carmon Creek Central TWP.85 RNG.19 W5 Processing TWP.85 RNG.17 Facilities W5 Three Creeks 743 743 Three Creeks TWP.84 RNG.20 W5 TWP.84 RNG.21 W5 Cliffdale Battery TWP.84 RNG.19 W5 688 68 4 TWP.84 RNG.16 W5 BANFF Project Area TWP.83 RNG.20 W5 TWP.83 RNG.19 W5 0 0 TWP.83 RNG.19 W5 TWP.83 RNG.18 W5 TWP.83 RNG.18 W5 TWP.83 RNG.17 W5 TWP.83 RNG.16 W5 TWP.83 RNG.17 W5 744 o k y Ri ver Sm 744 o k y Ri ver JASPER CALGARY 2 Sm TWP.83 RNG.20 W5 2 Peace River Leases TWP.84 RNG.16 W5 Wesley Creek TWP.83 RNG.21 W5 TWP.83 RNG.22 W5 TWP.83 RNG.21 W5 TWP.83 RNG.22 W5 W5 TWP.84 RNG.17 W5 68 4 r ive tR West EDMONTON TWP.84 RNG.17 W5 r ive tR He ar Town of Peace River He ar Wesley Creek Peace River Town of West Cliffdale TWP.84 RNG.18 Battery TWP.84 RNG.19 W5 TWP.84 RNG.18 W5 Peace River Landing Settlement Peace River Landing Settlement ATHABASCA DEPOSIT LEASES TWP.84 RNG.20 W5 TWP.84 RNG.21 W5 TWP.85 RNG.16 W5 TWP.85 RNG.16 W5 688 Weberville TWP.84 RNG.22 W5 Weberville PEACE RIVER DEPOSIT Phase 1 and 2 Development Location Phase 1 and 2 Development Location LEASES TWP.84 RNG.22 W5 Carmon Creek Central Processing TWP.85 RNG.17 Facilities W5 3,500 7,000 14,000 3,500 7,000 21,000 14,000 28,000 Meters 21,000 28,000 Meters TWP.83 RNG.16 W5 COLD LAKE DEPOSIT
  5. 5. CARMON CREEK PROJECT IN SITU HEAVY OIL Well Pads
  6. 6. CARMON CREEK PROJECT IN SITU HEAVY OIL Central Processing Facilities
  7. 7. CARMON CREEK PROJECT IN SITU HEAVY OIL
  1. A particular slide catching your eye?

    Clipping is a handy way to collect important slides you want to go back to later.

×