SlideShare a Scribd company logo
1 of 15
M1400 Lighter-Than-Air Aircraft
WORLD’S MOST
AFFORDABLE ISR:
Meeting Today’s ISR
Demand with Innovation,
Integration, and Cost
Effectiveness




4501 FORD AVENUE      SUITE 1320   ALEXANDRIA, VA 22302-1463
OFFICE 703.340.1304      FAX 703.379.0677     MAV6.COM
M1400 Airship Characteristics
 Largest UAV in the world
   • Over 100K ft3 of available payload area:   Maneuvering Engine
                                                                            Turbine Propulsion
     unprecedented mission flexibility
   • Up to 6,500 lb payload weight capacity
   • Eight (8) major independent ISR payloads
 Most Bits per Dollar per Day
  • Very low operating cost
 Most powerful UAV-based computer in
  existence
   • Enables on-board processing
   • Minimizes air-to-ground data
 Semi-Automated sensor-to-sensor cueing for
  enhanced threat detection
   • Increases number of payloads that can be
     simultaneously deployed and operated
 Modular payload integration architecture
  • Significantly reduces aircraft-payload             Power Car + Diesel
    integration time and cost                                                        1,610 ft3
                                                       Main Drive Engines
 Very long endurance
                                                                               (23 ft x 10 ft x 7 ft)
   • 2-7 days depending on payload & altitude
                                                                              Payload Car Volume

 Largest UAV electrical power generation
  capacity (120 kVA)
                                                                                                        2
Blue Devil Block II: On-going USAF program
leveraging the Mav6 M1400 airship for
persistent intelligence, surveillance, and
reconnaissance (ISR) operations.

  “…at a 500-nautical mile combat radius, the Air Force’s BD2 would
  have a payload-duration about 60 times greater than the Predator’s
  and more than 10 times greater than the Reaper’s.”
                                  Congressional Budget Office




                                                                       3
M1400 Operational Concept Example




  Potential Coverage of SW Border
                                                  SENSOR COVERAGE
                                    Operating        20,000 ft MSL
                                    Altitude
                                      EO/IR (Wide    110 mi radius (38,000 mi2
                                       Aperture)     coverage) @ 0.5m GSD
                                     SAR-MTI Radar   > 150 mi radius (> 76,000 mi2
                                                     coverage)
                                         SIGINT      200 mi radius (125,000 mi2
                                                     coverage)
                                                                                     4
M1400 Comprehensive ISR Capability
                                                                                             Hrs
Potential M1400 ISR Sensor Coverage            A single M1400 can provide the types
                                                                                             12
  Operating                                   of ISR capability of these 7 ISR systems
                          20,000
 Altitude (ft)                                (SIGINT, COMINT, GMTI, EO/IR, HSI, etc.):
                 110 mi radius (38,000 mi2                   simultaneously;
   “Eyes”
                         coverage)             at 3 to 10 times the duration; accomplish     12
                 200 mi radius (125,000 mi2   the processing on-board; and do it all for a
    “Ears”                                                fraction of the cost…
                         coverage)
                                                                                             32


                                                                                             12


                                                                                             ?
                                                                       80-120 hrs
                                                                       On-station Vs=
                                                                                             .5


                                                                                             16

                                                                                              5
M1400: Value Proposition
                                                          SIGNINT + COMINT + GMTI + EO/IR + HSI
                                            Days
                        1          2         3            4            5
                     12 hour endurance                                                                                      A single M1400 can provide the types
                                                                              $42K/hr
                                                                                                                       of ISR capability of these 7 ISR systems (SIGINT,
                             Sorties overlap to maintain Persistent Surveillance                                               COMINT, GMTI, EO/IR, HSI, etc.):
                     12 hour endurance                                                                                  simultaneously; at 3 to 10 times the duration;
                                                                              $45k/hr                                        accomplish the processing on-board;
                                                                                                                            and do it all for a fraction of the cost…
                     32 hour endurance
                                                                              $32k/hr                                             Days
                                                                                                               1          2        3            4             5
                     12 hour endurance
                                                                              $42k/hr
                                                                                            OR     $4k/hr
                                                                                                            120 hour endurance



                     12 hour endurance
                                                                              $36k/hr


                     0.5 hour endurance
                                                                                   ?


                     16 hour endurance
                                                                              $4k/hr




                12




                                                                                   54X
# of Aircraft    9




                          >$27M                                                                                     $0.5M
Required for
120 Hours of     6
Continuous
                 3
Coverage                                                                                                           for 120 hours of Persistent Surveillance
                            for 120 hours of Persistent Surveillance

                                                                       Time             the cost                                                              Time
                                                                                                                                                                           6
M1400 Modular Payload Integration




                                    7
M1400 Payload Options
  M1400 can support the simultaneous deployment of a variety of mission payloads—
      and integrate all with on-board computers, processing, and mass storage.




        Wide-Area EO/IR                Synthetic                 High Powered High Definition
                                     Aperture Radar                    Full Motion Video




                                           On-board Processing
High Bandwidth            Weapons
   Data Links             Modules                                          Multi-Mode Radar
                                                                                                8
M1400 Key Elements



        Innovation                          Integration                    Cost-Effectiveness
   Adapted mature airship              System-of-Systems Design:      High payload/
    design to achieve rapid              Designed as a multi-INT            Long endurance
    deliverable: Leverages               system from the beginning          enables greater
    traditional hull design with                                            cost-effectiveness:
    less complexity and fewer           Mission-tailorable sensor          Equivalent pound/hours of
    moving parts than alternatives       suite: Allows rapid                ISR would require 10s of
                                         reconfiguration in hours to        multiples of other remotely
   Open Architecture: Sensor            variety of sensor or comm          piloted aircraft
    agnostic payload                     payloads
    infrastructure                                                         Per flying dollar spent BD2
                                        Moves data processing to           delivers more ISR capability
   Extensible Ground Segment:           point of origin: Meets the         per hour than other aircraft
    Designed to meet                     tsunami of data challenge
    expeditionary ISR
    requirements with local multi-
    sensor data management,
    correlation, and storage
                                                                                                           9
M1400 Capabilities: Why it’s Unique
 Provides persistence with largest multi-int payload in existence
      Wide Area EO/IR with largest aperture EO/IR spot capability
      Largest “real estate” for SIGINT antenna arrays on any ISR platform

 Rapid tipping & cueing provides actionable ISR to users in seconds
      Sharing of event and geolocation data across disparate sensors directly to users
      Potential for automated sensor to sensor cuing (e.g. SIGINT to IMINT sensors)
      Find, fix, identify, and track HVI/HVT with HD sensing and SIGINT queues

 On-board processing = more info to users with less bandwidth
      Moves data processing from ground to air reducing sensor-to-shooter latency
      Potential as focal point of an ISR constellation integrating multiple platforms

 Multi-sensor processing ground station
      Multi-sensor C2 and visualization in the field reduces sensor analyst requirements

 Mission-tailorable sensor suite—in hours not months/years
      Accelerates deployment and use of new sensing capabilities
      Adaptability to situation not available with any other ISR asset
                                                                                            10
M1400 Value Proposition

                        To keep 6,000 lbs of ISR equipment on
                             station for 78 hours it takes:


                                    1          M1400
                                                                                    39                   Current Fixed-
                                                                                                         Wing UAVs
    468,000 lb-hrs ISR ÷ 11,900 lb-hrs ISR = 39.3 MQ-series RPAs per M1400

                                                                             OR
                                                                                  468,000 lb-hrs ISR ÷ 11,900 lb-hrs ISR = 39.3 MQ-series RPAs per M1400




            6,000 lbs ISR equipment x 78 hrs = 468,000 lb-hrs                                850 lbs ISR equipment x 14 hrs = 11,900 lb-hrs
                   of ISR Mission Capability per aircraft                                         of ISR Mission Capability per aircraft




                                         High payload/Long endurance
                                       enables greater cost-effectiveness
                                                                                                                                                           11
M1400 Value Proposition

                                                                                             Current Fixed-
                                                           M1400                              Wing UAVs



             7        times the ISR
                      mission payload           6,000 lbs of ISR equipment                850 lbs of ISR equipment


    AT
           5-6        times the
                      endurance
                                                            78 hrs                                 14 hrs


    FOR   75%         the cost per
                      flight hour
                                                          $1,117/hr                               $1,456/hr


                 ( 6,000 lbs x 78 hrs ÷ $1,117/hr ) ÷ ( 850 lbs x 14 hrs ÷ $1,456/hr ) = 52.375

          Per flying dollar spent you get 52 times more ISR per
            hour with M1400 than current fixed-wing UAVs
                                                                                                                     12
CBO Payload-Duration Comparison

                                     300,000
    Payload-Duration (Pound-Hours)




                                     250,000


                                     200,000
                                                                                                              M1400

                                     150,000


                                     100,000


                                      50,000
                                                                                                              MQ-9 Reaper
                                                                                                              Grey Eagle
                                                                                                              MQ-1 Predator
                                                          500                  1,000         1,500    2,000

                                                                     Combat Radius (Nautical Miles)

Source: Congressional Budget Office based on data provided by manufacturers.                                                  13
Blue Devil 2 Progress
Example M1400 Mission Potential

        Humanitarian Assistance      Rapid Map Refresh
        Disaster Relief              Emergency Response
        Persistent Presence          Air Sampling
        Border Patrol                Crop Monitoring
        Law Enforcement              Insect/disease Control
        Traffic Management           Flood Control
        Crowd Control                Nuclear Monitoring
        Market Analysis              Counter-terrorism
        Counter-Drug Ops             Early Warning
        Communications Relay         Counter-proliferation
        Cell Phone Networking        Counter-piracy
        Home/Facility Security       Harbor Control
        Pipeline Monitoring          Special Operations
                                                                15

More Related Content

Similar to M1400 lighter than air aircraft

Deployment Review: Carlton Complex Wildfire
Deployment Review: Carlton Complex WildfireDeployment Review: Carlton Complex Wildfire
Deployment Review: Carlton Complex WildfireCisco Crisis Response
 
Microstructure Intro Apr08
Microstructure Intro Apr08Microstructure Intro Apr08
Microstructure Intro Apr08Jim Nole
 
Space solarpower
Space solarpowerSpace solarpower
Space solarpowerisrokids
 
Space solarpower
Space solarpowerSpace solarpower
Space solarpowerisrokids
 
Hazards from cell phones and cell towers gk kem hospital
Hazards from cell phones and cell towers gk kem hospitalHazards from cell phones and cell towers gk kem hospital
Hazards from cell phones and cell towers gk kem hospitalNeha Kumar
 
Cell phone and mobile tower radiation hazards
Cell phone and mobile tower radiation hazardsCell phone and mobile tower radiation hazards
Cell phone and mobile tower radiation hazardsNeha Kumar
 
multi mission radar (MMR) - EL/M-2084 FOR IRON DOME
multi mission radar (MMR) - EL/M-2084 FOR IRON DOMEmulti mission radar (MMR) - EL/M-2084 FOR IRON DOME
multi mission radar (MMR) - EL/M-2084 FOR IRON DOMEHossam Zein
 
Meeting the challenges posed by ISR
Meeting the challenges posed by ISRMeeting the challenges posed by ISR
Meeting the challenges posed by ISRNewtec
 
Outdoor testing, analysis and performance predictions of PV technologies [PV ...
Outdoor testing, analysis and performance predictions of PV technologies [PV ...Outdoor testing, analysis and performance predictions of PV technologies [PV ...
Outdoor testing, analysis and performance predictions of PV technologies [PV ...Smithers Apex
 
Faktor energy storage: 1MW project
Faktor energy storage: 1MW projectFaktor energy storage: 1MW project
Faktor energy storage: 1MW projectfaktorgmbh
 
FLIR Webinar: Selecting a Drone or IR Camera for Various Applications
FLIR Webinar: Selecting a Drone or IR Camera for Various ApplicationsFLIR Webinar: Selecting a Drone or IR Camera for Various Applications
FLIR Webinar: Selecting a Drone or IR Camera for Various ApplicationsTranscat
 
IRJET - Wireless Controlled Rough Terrain Vehicle to Detect Alive Human in Ea...
IRJET - Wireless Controlled Rough Terrain Vehicle to Detect Alive Human in Ea...IRJET - Wireless Controlled Rough Terrain Vehicle to Detect Alive Human in Ea...
IRJET - Wireless Controlled Rough Terrain Vehicle to Detect Alive Human in Ea...IRJET Journal
 
otdr-120109011429-phpapp02.pptx
otdr-120109011429-phpapp02.pptxotdr-120109011429-phpapp02.pptx
otdr-120109011429-phpapp02.pptxNatalie Felicerta
 
Base Station Antenna needs for the 5G RAN
Base Station Antenna needs for the 5G RANBase Station Antenna needs for the 5G RAN
Base Station Antenna needs for the 5G RAN3G4G
 
MeshDynamics MD4000 Training Webcast slides
MeshDynamics MD4000 Training Webcast slidesMeshDynamics MD4000 Training Webcast slides
MeshDynamics MD4000 Training Webcast slidesMeshDynamics
 
Telecom universal datastatesharingfabric
Telecom universal datastatesharingfabricTelecom universal datastatesharingfabric
Telecom universal datastatesharingfabricShay Hassidim
 
Catch The Wind Investor Presentation November 2009
Catch The Wind Investor Presentation November 2009Catch The Wind Investor Presentation November 2009
Catch The Wind Investor Presentation November 2009TMX Equicom
 

Similar to M1400 lighter than air aircraft (20)

Deployment Review: Carlton Complex Wildfire
Deployment Review: Carlton Complex WildfireDeployment Review: Carlton Complex Wildfire
Deployment Review: Carlton Complex Wildfire
 
Microstructure Intro Apr08
Microstructure Intro Apr08Microstructure Intro Apr08
Microstructure Intro Apr08
 
Space solarpower
Space solarpowerSpace solarpower
Space solarpower
 
Space solarpower
Space solarpowerSpace solarpower
Space solarpower
 
Hazards from cell phones and cell towers gk kem hospital
Hazards from cell phones and cell towers gk kem hospitalHazards from cell phones and cell towers gk kem hospital
Hazards from cell phones and cell towers gk kem hospital
 
Cell phone and mobile tower radiation hazards
Cell phone and mobile tower radiation hazardsCell phone and mobile tower radiation hazards
Cell phone and mobile tower radiation hazards
 
Gk emr hazard_kem
Gk emr hazard_kemGk emr hazard_kem
Gk emr hazard_kem
 
Sponge v2
Sponge v2Sponge v2
Sponge v2
 
multi mission radar (MMR) - EL/M-2084 FOR IRON DOME
multi mission radar (MMR) - EL/M-2084 FOR IRON DOMEmulti mission radar (MMR) - EL/M-2084 FOR IRON DOME
multi mission radar (MMR) - EL/M-2084 FOR IRON DOME
 
Meeting the challenges posed by ISR
Meeting the challenges posed by ISRMeeting the challenges posed by ISR
Meeting the challenges posed by ISR
 
Asr 9000-line-cards
Asr 9000-line-cardsAsr 9000-line-cards
Asr 9000-line-cards
 
Outdoor testing, analysis and performance predictions of PV technologies [PV ...
Outdoor testing, analysis and performance predictions of PV technologies [PV ...Outdoor testing, analysis and performance predictions of PV technologies [PV ...
Outdoor testing, analysis and performance predictions of PV technologies [PV ...
 
Faktor energy storage: 1MW project
Faktor energy storage: 1MW projectFaktor energy storage: 1MW project
Faktor energy storage: 1MW project
 
FLIR Webinar: Selecting a Drone or IR Camera for Various Applications
FLIR Webinar: Selecting a Drone or IR Camera for Various ApplicationsFLIR Webinar: Selecting a Drone or IR Camera for Various Applications
FLIR Webinar: Selecting a Drone or IR Camera for Various Applications
 
IRJET - Wireless Controlled Rough Terrain Vehicle to Detect Alive Human in Ea...
IRJET - Wireless Controlled Rough Terrain Vehicle to Detect Alive Human in Ea...IRJET - Wireless Controlled Rough Terrain Vehicle to Detect Alive Human in Ea...
IRJET - Wireless Controlled Rough Terrain Vehicle to Detect Alive Human in Ea...
 
otdr-120109011429-phpapp02.pptx
otdr-120109011429-phpapp02.pptxotdr-120109011429-phpapp02.pptx
otdr-120109011429-phpapp02.pptx
 
Base Station Antenna needs for the 5G RAN
Base Station Antenna needs for the 5G RANBase Station Antenna needs for the 5G RAN
Base Station Antenna needs for the 5G RAN
 
MeshDynamics MD4000 Training Webcast slides
MeshDynamics MD4000 Training Webcast slidesMeshDynamics MD4000 Training Webcast slides
MeshDynamics MD4000 Training Webcast slides
 
Telecom universal datastatesharingfabric
Telecom universal datastatesharingfabricTelecom universal datastatesharingfabric
Telecom universal datastatesharingfabric
 
Catch The Wind Investor Presentation November 2009
Catch The Wind Investor Presentation November 2009Catch The Wind Investor Presentation November 2009
Catch The Wind Investor Presentation November 2009
 

More from ICSA, LLC

Jack Rowley on USV Technologies
Jack Rowley on USV TechnologiesJack Rowley on USV Technologies
Jack Rowley on USV TechnologiesICSA, LLC
 
Presentation By Hugh Fraser
Presentation By Hugh FraserPresentation By Hugh Fraser
Presentation By Hugh FraserICSA, LLC
 
Presentation richard czumak
Presentation richard czumakPresentation richard czumak
Presentation richard czumakICSA, LLC
 
Presentation By Air Vice Marshal (Retd.) Chris Deeble
Presentation By Air Vice Marshal (Retd.) Chris DeeblePresentation By Air Vice Marshal (Retd.) Chris Deeble
Presentation By Air Vice Marshal (Retd.) Chris DeebleICSA, LLC
 
BG langford Presentation at Williams Foundation seminar October 24 2019
BG langford Presentation at Williams Foundation seminar October 24 2019BG langford Presentation at Williams Foundation seminar October 24 2019
BG langford Presentation at Williams Foundation seminar October 24 2019ICSA, LLC
 
AIRCDRE Phil Gordon on the Changing Character of Manouvre
AIRCDRE Phil Gordon on the Changing Character of ManouvreAIRCDRE Phil Gordon on the Changing Character of Manouvre
AIRCDRE Phil Gordon on the Changing Character of ManouvreICSA, LLC
 
A Historical Perspective on Manoeuvre
A Historical Perspective on ManoeuvreA Historical Perspective on Manoeuvre
A Historical Perspective on ManoeuvreICSA, LLC
 
Rebuild of Conventional Forces and implications for Training
Rebuild of Conventional Forces and implications for TrainingRebuild of Conventional Forces and implications for Training
Rebuild of Conventional Forces and implications for TrainingICSA, LLC
 
Rebuild of Conventional Forces
Rebuild of Conventional ForcesRebuild of Conventional Forces
Rebuild of Conventional ForcesICSA, LLC
 
GATR HADR Efforts
GATR HADR EffortsGATR HADR Efforts
GATR HADR EffortsICSA, LLC
 
Wing Commander Alison MacCarthy Brief
Wing Commander Alison MacCarthy BriefWing Commander Alison MacCarthy Brief
Wing Commander Alison MacCarthy BriefICSA, LLC
 
Lt Col Beaumont Brief on Logistics
Lt Col Beaumont Brief on LogisticsLt Col Beaumont Brief on Logistics
Lt Col Beaumont Brief on LogisticsICSA, LLC
 
MBDA Briefing at Williams Foundation Seminar, April 11, 2019
MBDA Briefing at Williams Foundation Seminar, April 11, 2019MBDA Briefing at Williams Foundation Seminar, April 11, 2019
MBDA Briefing at Williams Foundation Seminar, April 11, 2019ICSA, LLC
 
Far from the Sanctuaries: Sustaining a Fifth Generation Fight in the Indo-Pac...
Far from the Sanctuaries: Sustaining a Fifth Generation Fight in the Indo-Pac...Far from the Sanctuaries: Sustaining a Fifth Generation Fight in the Indo-Pac...
Far from the Sanctuaries: Sustaining a Fifth Generation Fight in the Indo-Pac...ICSA, LLC
 
Mike Tarlton Briefing to Williams Fondation Seminar on Joint Strike, August ...
Mike Tarlton Briefing to Williams Fondation  Seminar on Joint Strike, August ...Mike Tarlton Briefing to Williams Fondation  Seminar on Joint Strike, August ...
Mike Tarlton Briefing to Williams Fondation Seminar on Joint Strike, August ...ICSA, LLC
 
Air Marshal Atha, RAF, Presentation to Williams Foundation Seminar on Joint S...
Air Marshal Atha, RAF, Presentation to Williams Foundation Seminar on Joint S...Air Marshal Atha, RAF, Presentation to Williams Foundation Seminar on Joint S...
Air Marshal Atha, RAF, Presentation to Williams Foundation Seminar on Joint S...ICSA, LLC
 
James Heading Briefing to Williams Foundation Seminar on Joint Strike, August...
James Heading Briefing to Williams Foundation Seminar on Joint Strike, August...James Heading Briefing to Williams Foundation Seminar on Joint Strike, August...
James Heading Briefing to Williams Foundation Seminar on Joint Strike, August...ICSA, LLC
 
Dr. Tom Bussing Briefing to Williams Foundation Seminar on Joint Strike, Augu...
Dr. Tom Bussing Briefing to Williams Foundation Seminar on Joint Strike, Augu...Dr. Tom Bussing Briefing to Williams Foundation Seminar on Joint Strike, Augu...
Dr. Tom Bussing Briefing to Williams Foundation Seminar on Joint Strike, Augu...ICSA, LLC
 

More from ICSA, LLC (20)

Jack Rowley on USV Technologies
Jack Rowley on USV TechnologiesJack Rowley on USV Technologies
Jack Rowley on USV Technologies
 
Team osprey
Team ospreyTeam osprey
Team osprey
 
Presentation By Hugh Fraser
Presentation By Hugh FraserPresentation By Hugh Fraser
Presentation By Hugh Fraser
 
Presentation richard czumak
Presentation richard czumakPresentation richard czumak
Presentation richard czumak
 
Presentation By Air Vice Marshal (Retd.) Chris Deeble
Presentation By Air Vice Marshal (Retd.) Chris DeeblePresentation By Air Vice Marshal (Retd.) Chris Deeble
Presentation By Air Vice Marshal (Retd.) Chris Deeble
 
BG langford Presentation at Williams Foundation seminar October 24 2019
BG langford Presentation at Williams Foundation seminar October 24 2019BG langford Presentation at Williams Foundation seminar October 24 2019
BG langford Presentation at Williams Foundation seminar October 24 2019
 
AIRCDRE Phil Gordon on the Changing Character of Manouvre
AIRCDRE Phil Gordon on the Changing Character of ManouvreAIRCDRE Phil Gordon on the Changing Character of Manouvre
AIRCDRE Phil Gordon on the Changing Character of Manouvre
 
A Historical Perspective on Manoeuvre
A Historical Perspective on ManoeuvreA Historical Perspective on Manoeuvre
A Historical Perspective on Manoeuvre
 
Rebuild of Conventional Forces and implications for Training
Rebuild of Conventional Forces and implications for TrainingRebuild of Conventional Forces and implications for Training
Rebuild of Conventional Forces and implications for Training
 
Rebuild of Conventional Forces
Rebuild of Conventional ForcesRebuild of Conventional Forces
Rebuild of Conventional Forces
 
GATR HADR Efforts
GATR HADR EffortsGATR HADR Efforts
GATR HADR Efforts
 
Wing Commander Alison MacCarthy Brief
Wing Commander Alison MacCarthy BriefWing Commander Alison MacCarthy Brief
Wing Commander Alison MacCarthy Brief
 
Lt Col Beaumont Brief on Logistics
Lt Col Beaumont Brief on LogisticsLt Col Beaumont Brief on Logistics
Lt Col Beaumont Brief on Logistics
 
MBDA Briefing at Williams Foundation Seminar, April 11, 2019
MBDA Briefing at Williams Foundation Seminar, April 11, 2019MBDA Briefing at Williams Foundation Seminar, April 11, 2019
MBDA Briefing at Williams Foundation Seminar, April 11, 2019
 
Plan b
Plan bPlan b
Plan b
 
Far from the Sanctuaries: Sustaining a Fifth Generation Fight in the Indo-Pac...
Far from the Sanctuaries: Sustaining a Fifth Generation Fight in the Indo-Pac...Far from the Sanctuaries: Sustaining a Fifth Generation Fight in the Indo-Pac...
Far from the Sanctuaries: Sustaining a Fifth Generation Fight in the Indo-Pac...
 
Mike Tarlton Briefing to Williams Fondation Seminar on Joint Strike, August ...
Mike Tarlton Briefing to Williams Fondation  Seminar on Joint Strike, August ...Mike Tarlton Briefing to Williams Fondation  Seminar on Joint Strike, August ...
Mike Tarlton Briefing to Williams Fondation Seminar on Joint Strike, August ...
 
Air Marshal Atha, RAF, Presentation to Williams Foundation Seminar on Joint S...
Air Marshal Atha, RAF, Presentation to Williams Foundation Seminar on Joint S...Air Marshal Atha, RAF, Presentation to Williams Foundation Seminar on Joint S...
Air Marshal Atha, RAF, Presentation to Williams Foundation Seminar on Joint S...
 
James Heading Briefing to Williams Foundation Seminar on Joint Strike, August...
James Heading Briefing to Williams Foundation Seminar on Joint Strike, August...James Heading Briefing to Williams Foundation Seminar on Joint Strike, August...
James Heading Briefing to Williams Foundation Seminar on Joint Strike, August...
 
Dr. Tom Bussing Briefing to Williams Foundation Seminar on Joint Strike, Augu...
Dr. Tom Bussing Briefing to Williams Foundation Seminar on Joint Strike, Augu...Dr. Tom Bussing Briefing to Williams Foundation Seminar on Joint Strike, Augu...
Dr. Tom Bussing Briefing to Williams Foundation Seminar on Joint Strike, Augu...
 

Recently uploaded

20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdfChris Skinner
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxShruti Mittal
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryWhittensFineJewelry1
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamArik Fletcher
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 

Recently uploaded (20)

20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
 
business environment micro environment macro environment.pptx
business environment micro environment macro environment.pptxbusiness environment micro environment macro environment.pptx
business environment micro environment macro environment.pptx
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptxThe Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management Team
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 

M1400 lighter than air aircraft

  • 1. M1400 Lighter-Than-Air Aircraft WORLD’S MOST AFFORDABLE ISR: Meeting Today’s ISR Demand with Innovation, Integration, and Cost Effectiveness 4501 FORD AVENUE SUITE 1320 ALEXANDRIA, VA 22302-1463 OFFICE 703.340.1304 FAX 703.379.0677 MAV6.COM
  • 2. M1400 Airship Characteristics  Largest UAV in the world • Over 100K ft3 of available payload area: Maneuvering Engine Turbine Propulsion unprecedented mission flexibility • Up to 6,500 lb payload weight capacity • Eight (8) major independent ISR payloads  Most Bits per Dollar per Day • Very low operating cost  Most powerful UAV-based computer in existence • Enables on-board processing • Minimizes air-to-ground data  Semi-Automated sensor-to-sensor cueing for enhanced threat detection • Increases number of payloads that can be simultaneously deployed and operated  Modular payload integration architecture • Significantly reduces aircraft-payload Power Car + Diesel integration time and cost 1,610 ft3 Main Drive Engines  Very long endurance (23 ft x 10 ft x 7 ft) • 2-7 days depending on payload & altitude Payload Car Volume  Largest UAV electrical power generation capacity (120 kVA) 2
  • 3. Blue Devil Block II: On-going USAF program leveraging the Mav6 M1400 airship for persistent intelligence, surveillance, and reconnaissance (ISR) operations. “…at a 500-nautical mile combat radius, the Air Force’s BD2 would have a payload-duration about 60 times greater than the Predator’s and more than 10 times greater than the Reaper’s.” Congressional Budget Office 3
  • 4. M1400 Operational Concept Example Potential Coverage of SW Border SENSOR COVERAGE Operating 20,000 ft MSL Altitude EO/IR (Wide 110 mi radius (38,000 mi2 Aperture) coverage) @ 0.5m GSD SAR-MTI Radar > 150 mi radius (> 76,000 mi2 coverage) SIGINT 200 mi radius (125,000 mi2 coverage) 4
  • 5. M1400 Comprehensive ISR Capability Hrs Potential M1400 ISR Sensor Coverage A single M1400 can provide the types 12 Operating of ISR capability of these 7 ISR systems 20,000 Altitude (ft) (SIGINT, COMINT, GMTI, EO/IR, HSI, etc.): 110 mi radius (38,000 mi2 simultaneously; “Eyes” coverage) at 3 to 10 times the duration; accomplish 12 200 mi radius (125,000 mi2 the processing on-board; and do it all for a “Ears” fraction of the cost… coverage) 32 12 ? 80-120 hrs On-station Vs= .5 16 5
  • 6. M1400: Value Proposition SIGNINT + COMINT + GMTI + EO/IR + HSI Days 1 2 3 4 5 12 hour endurance A single M1400 can provide the types $42K/hr of ISR capability of these 7 ISR systems (SIGINT, Sorties overlap to maintain Persistent Surveillance COMINT, GMTI, EO/IR, HSI, etc.): 12 hour endurance simultaneously; at 3 to 10 times the duration; $45k/hr accomplish the processing on-board; and do it all for a fraction of the cost… 32 hour endurance $32k/hr Days 1 2 3 4 5 12 hour endurance $42k/hr OR $4k/hr 120 hour endurance 12 hour endurance $36k/hr 0.5 hour endurance ? 16 hour endurance $4k/hr 12 54X # of Aircraft 9 >$27M $0.5M Required for 120 Hours of 6 Continuous 3 Coverage for 120 hours of Persistent Surveillance for 120 hours of Persistent Surveillance Time the cost Time 6
  • 7. M1400 Modular Payload Integration 7
  • 8. M1400 Payload Options M1400 can support the simultaneous deployment of a variety of mission payloads— and integrate all with on-board computers, processing, and mass storage. Wide-Area EO/IR Synthetic High Powered High Definition Aperture Radar Full Motion Video On-board Processing High Bandwidth Weapons Data Links Modules Multi-Mode Radar 8
  • 9. M1400 Key Elements Innovation Integration Cost-Effectiveness  Adapted mature airship  System-of-Systems Design:  High payload/ design to achieve rapid Designed as a multi-INT Long endurance deliverable: Leverages system from the beginning enables greater traditional hull design with cost-effectiveness: less complexity and fewer  Mission-tailorable sensor Equivalent pound/hours of moving parts than alternatives suite: Allows rapid ISR would require 10s of reconfiguration in hours to multiples of other remotely  Open Architecture: Sensor variety of sensor or comm piloted aircraft agnostic payload payloads infrastructure  Per flying dollar spent BD2  Moves data processing to delivers more ISR capability  Extensible Ground Segment: point of origin: Meets the per hour than other aircraft Designed to meet tsunami of data challenge expeditionary ISR requirements with local multi- sensor data management, correlation, and storage 9
  • 10. M1400 Capabilities: Why it’s Unique Provides persistence with largest multi-int payload in existence  Wide Area EO/IR with largest aperture EO/IR spot capability  Largest “real estate” for SIGINT antenna arrays on any ISR platform Rapid tipping & cueing provides actionable ISR to users in seconds  Sharing of event and geolocation data across disparate sensors directly to users  Potential for automated sensor to sensor cuing (e.g. SIGINT to IMINT sensors)  Find, fix, identify, and track HVI/HVT with HD sensing and SIGINT queues On-board processing = more info to users with less bandwidth  Moves data processing from ground to air reducing sensor-to-shooter latency  Potential as focal point of an ISR constellation integrating multiple platforms Multi-sensor processing ground station  Multi-sensor C2 and visualization in the field reduces sensor analyst requirements Mission-tailorable sensor suite—in hours not months/years  Accelerates deployment and use of new sensing capabilities  Adaptability to situation not available with any other ISR asset 10
  • 11. M1400 Value Proposition To keep 6,000 lbs of ISR equipment on station for 78 hours it takes: 1 M1400 39 Current Fixed- Wing UAVs 468,000 lb-hrs ISR ÷ 11,900 lb-hrs ISR = 39.3 MQ-series RPAs per M1400 OR 468,000 lb-hrs ISR ÷ 11,900 lb-hrs ISR = 39.3 MQ-series RPAs per M1400 6,000 lbs ISR equipment x 78 hrs = 468,000 lb-hrs 850 lbs ISR equipment x 14 hrs = 11,900 lb-hrs of ISR Mission Capability per aircraft of ISR Mission Capability per aircraft High payload/Long endurance enables greater cost-effectiveness 11
  • 12. M1400 Value Proposition Current Fixed- M1400 Wing UAVs 7 times the ISR mission payload 6,000 lbs of ISR equipment 850 lbs of ISR equipment AT 5-6 times the endurance 78 hrs 14 hrs FOR 75% the cost per flight hour $1,117/hr $1,456/hr ( 6,000 lbs x 78 hrs ÷ $1,117/hr ) ÷ ( 850 lbs x 14 hrs ÷ $1,456/hr ) = 52.375 Per flying dollar spent you get 52 times more ISR per hour with M1400 than current fixed-wing UAVs 12
  • 13. CBO Payload-Duration Comparison 300,000 Payload-Duration (Pound-Hours) 250,000 200,000 M1400 150,000 100,000 50,000 MQ-9 Reaper Grey Eagle MQ-1 Predator 500 1,000 1,500 2,000 Combat Radius (Nautical Miles) Source: Congressional Budget Office based on data provided by manufacturers. 13
  • 14. Blue Devil 2 Progress
  • 15. Example M1400 Mission Potential  Humanitarian Assistance  Rapid Map Refresh  Disaster Relief  Emergency Response  Persistent Presence  Air Sampling  Border Patrol  Crop Monitoring  Law Enforcement  Insect/disease Control  Traffic Management  Flood Control  Crowd Control  Nuclear Monitoring  Market Analysis  Counter-terrorism  Counter-Drug Ops  Early Warning  Communications Relay  Counter-proliferation  Cell Phone Networking  Counter-piracy  Home/Facility Security  Harbor Control  Pipeline Monitoring  Special Operations 15