Your SlideShare is downloading. ×
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
7th And Jefferson Highrise Fesibility Study Presentation
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

7th And Jefferson Highrise Fesibility Study Presentation

309

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
309
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Tanner Chapel Feasibility Study 7th Street and Jefferson Phoenix, ArizonaPlanner – Renee Thomas, RA, IESNA
  • 2.
  • 3. DC ZONING
    OVERLAY
  • 4. AERIAL
  • 5.
  • 6.
  • 7.
  • 8. CURRENT ZONING CONSTRAINTS
    +/- 30k Footprint
    3 Levels – 90k SF Residual
    DC ZONING
    OVERLAY
    Existing Chapel
    +/- 7,000 SF
    Existing Bldg
    +/- 8,000 SF
    Footprint
  • 9.
  • 10. DC
    SCHEME 1
    6 levels
    +/- 400 stalls
    6 levels
    130k SF
    12,500 SF
  • 11.
  • 12.
  • 13. SCHEME 2a
    30k Footprint
    180k SF Total
    6 Levels Parking
    +/- 400 Stalls
    +/- 17k SF
  • 14. SCHEME 2
    30k Footprint
    180k SF Total
    Parking Structure
    6 Levels – 400 Stalls
    +/- 17k SF
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21. SCHEME 3
    +/- 52k SF Footprint
    6 Levels – 312k SF Total
    Parking?
    Additional
    Chapel?
    Chapel
    Expansion
    16k SF

×