  1. 1. Industrial Summer Training at NTPC Badarpur Anuj Kumar Electronics & Communication
  2. 2. Introduction 10/31/11
  3. 3. Overview of NTPC  NTPC was set up in the central sector in the 1975.  NTPC has installed capacity of 29,394 MW. It plans to be a 75,000 MW company by 2017.  NTPC Badarpur station has also bagged ISO 9001/ ISO 14001 certification.  Today NTPC contributes more than 3 / 5th of the total power generation in India
  4. 4. Overview of NTPC Click to edit the outline text format Second Outline Level − Third Outline Level Fourth Outline Level − Fifth Outline Level
  5. 5. NTPC Badarpur
  6. 6. Overview of BTPS  BTPS MEETS MORE THAN 24% OF DELHI’S ELECTRICITY CONSUMPTION  INSTALLED CAPACITY 720 MW DERATED CAPACITY 705 MW (3x95 + 2x210MW)  OWNED BY GOVT. OF INDIA, MINISTRY OF POWER  BEING MANAGED BY NTPC FOR THE LAST 26 YEARS SINCE 1st APRIL 1978
  7. 7. NTPC Badarpur  BTPS was conceived in 1965 to meet the growing electricity demand of Northern Region.  The site construction activities started in 1968.  The plant became operational with the commissioning of its first unit on 26th July 1973, 2nd unit in ;74 , 3rd unit in ’75 , 4th unit in ’78 & 5th unit in ’81.
  8. 8. Basic Principle There are basically three main units of a thermal power plant: 1. Steam Generator or Boiler 2. Steam Turbine 3. Electric Generator
  9. 9. Electricity from Coal
  10. 10. C&I LABS Control and Instrumentation Department has following labs: 1. 2. 3. 4. 5. 6. Manometry Lab Protection and Interlocks Lab Automation Lab Electronics Lab Water Treatment Plant Furnaces Safety Supervisory System Lab
  11. 11. OPERATION AND MAINTAINANCE This control & instrumentation is the brain of the plant because from the relays to transmitters followed by the electronic computation chipsets and recorders and lastly the controlling circuitry, all fall under this. A View of Control Room at BTPS
  12. 12. CONTROL & MONITORING MECHANISMS There are basically two types of Problems faced in a Power Plant 1. Metallurgical 2. Mechanical
  13. 13. C&I Lab In C&I Lab parameters to be monitored are: 1. Speed 2. Temperature 3. Current 4. Voltage 5. Pressure 6. Flow of Gases 7. Vibration
  14. 14. IT Role & Responsibility – Maintenance Management – Materials & Contracts Management – Financial Accounting – Coal Monitoring & Accounting. – Operations & Generation Monitoring – Hospital Management – H R & TMS, T/S Management – Office Automation & communication. – E-Samadhan complaints Monitoring
  15. 15. • Why IT ? Materials : 30,000 + items  Transaction data.  Master data Material and Service  Plant : 15,000 equipments     • Equipment master. Task list. Employees : 1100 + Personal and payroll data. Finance : Accounting data. Operation : Plant parameters history data Vendors: 5000 + vendors.
  16. 16. Satellite Communication Network 4/6 GHZ RHQ:ERHQ, NRHQ,SRHQ,WRHQ Engg.Office, NOIDA Rihand, 8 MBPS M/W Link PMI,NOIDA 2 GHZ/ 8 MBPS 4/6 GHZ ( 512 kbps aggreagate ) 2 mbps leased line CC, SCOPE New Delhi DADRI PROJECT NTPC Hub Station At CSES, Noida Tapovan Loharinagpala ( ORDERED ) Singrauli OFC LINK Vindhyachal THERMAL: Farakka,Unchahar,Kahalgaon, Korba, Ramagundam, Sipat, Simhadri, Talcher (S), Talcher (T), Tanda, Barh GAS/HYDRO:Anta,Auriya,Faridabad, Gandhar, Kawas, Kayamkulam, Koldam,
  17. 17. Awards MOP’s Meritorious Productivity Award: For calendar years 1987, 1988, 1990. For financial years 92-93, 94-95 and 97-98 Received Bronze medal in 1998-99 and Received Silver shield and certificate of Meritorious performance for 2000-01. Received Gold shield and Certificate for outstanding performance three consecutive years 01-02 & 02-03 , 03-04. the awards were presented by Hon’ble President of India and Hon’ble power Minister on 24 August 2004.
  18. 18. Awards
  19. 19. Awards
  20. 20. Awards o British safety award for 1988, 1994 and 1999. o One employee bagged the Vishwakarma Rashtriya Puraskar in 1994 from Ministry of Labour. Six employees have been given the same award for 1998. o 6 BTPS employees were awarded under Delhi Shramik Sujhao Yojna Puraskar’97 .
  21. 21. BTPS awarded Silver shield in Thermal Power Sector for Outstanding Achievement in Safety management by Greentech foundation for 2003-04 – BTPS awarded Greentech Environment excellence Gold Award in Thermal Power sector for 2002-03 – BTPS awarded Greentech Environment excellence Gold Award in Thermal Power sector for 2003-04 – BTPS received golden peacock award for IT Innovations for 2003-04
  22. 22. BTPS received golden peacock award for IT innovations for 2003-04
  23. 23. Conclusion The BTPS IT has come a long way from lagging to leading in IT enablement among NTPC power stations. IT Vision realized, making BTPS highly information enabled plant. 10/31/11
  24. 24. Reference • TRAINING REPORTS OF PAST YEARS AT NALANDA LIBRARY • INTERNET • DOCUMENTS OF IT DEPARTMENT