DAVIS reform

Loading...

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

0 comments

Post a comment

    Post a comment
    Embed Video
    Edit your comment Cancel

    Favorites, Groups & Events

    DAVIS reform - Presentation Transcript

    1. Use the arrow keys on your keyboard to advance the slideshow. Use the ‘esc’ button to exit the presentation.
    2. The architecture firm of DAVIS has been focused on providing exceptional design for new developments for over 30 years. What you may not know is that at the same time the DAVIS Reform® program has been delivering quality, award winning design for a multitude of renovation and repositioning projects.
    3. DAVIS Reform® is focused on renovating and repositioning aging structures, and transforming those assets into competitive and expertly positioned product in today’s marketplace. Whether your project involves a simple paint job, a major renovation with structural modifications or a change in use with entitlement considerations, DAVIS Reform® will tailor a team of experts to help you through every stage of the project. The flexibility and capabilities of DAVIS Reform® make it the perfect team for your project, regardless of the scope or the nature of the use, and a key advantage of the program is the depth of talent and experience of the key players - DAVIS & DFDia.
    4. reposition the work place
    5. BLACK CANYON OFFICE CENTER - phoenix, az BEFORE AFTER Gross Square Footage: 100,000 s.f. 125,000 sf Occupancy %: *50% 75% Lease Rate/s.f.: $11-12 / s.f. $22 / s.f. Design Fee: $200,000 Construction Cost: $3.4 mm * The single user occupying 100% of building was planning to downsize to under 50% of the available space.
    6. GOALS Transform a single-tenant user office into a multi-tenant facility. Capitalize on the premium interstate frontage. Maintain the privacy requirements of the existing security conscious tenant. CHALLENGES & SOLUTIONS CHALLENGE No freeway presence. SOLUTION A prominent “jewel-box” 2+-story volume was designed to face the freeway. The new addition includes a monumental stairway, a new freestanding elevator core and clerestory windows all under a cantilevered roof structure hovering ½-story above the existing roofline. The dramatic entry point is further accentuated by raised planter beds, seat walls, a metal trellis and towering palms. Decorative lighting and a contemporary color scheme were also included to highlight the building's exterior. CHALLENGE Preserve required security for existing user while providing public access for new users. SOLUTION The existing lessee was relocated to a less prominent area of the building providing a private point of ingress and egress, while the 2-story lobby facing the freeway became the primary public visitor entrance. CHALLENGE Deep floor plates and narrow band of glazing created spaces with limited natural light. SOLUTION Perimeter glazing was reworked with larger windows to provide more natural light within the tenant spaces. CHALLENGE An interior open lobby space totaling 5,400 s.f. was wasted space and not conducive to multi-tenant use. SOLUTION The interior open lobby was filled in resulting in an additional 10,800 s.f. of leasable area.
    7. Winner of 2007 Gold Nugget Merit Award Best Rehab – Commercial/Industrial Project
    8. BEFORE AFTER BURNS & WILOCOX CENTER – scottsdale, az
    9. BEFORE CONCEPTUAL RENDERING CONCEPTUAL RENDERING SCOTTSDALE EXECUTIVE OFFICE PARK – scottsdale, az
    10. BEFORE CONCEPTUAL RENDERING CONCEPTUAL RENDERING CONCEPTUAL RENDERING OLYMPIC BLOCK – (pioneer square) seattle, wa Historic Renovation
    11. CONCEPTUAL RENDERING LUHR’S BUILDING – phoenix, az Historic Renovation BEFORE
    12. BEFORE CONCEPTUAL SITE PLAN CONCEPTUAL RENDERING CONCEPTUAL RENDERING PHOENIX GATEWAY – phoenix, az
    13. BEFORE AFTER PHOENIX CITY SQUARE – phoenix, az
    14. BEFORE CONCEPTUAL RENDERINGS CONCEPTUAL RENDERING 210 BARTON SPRINGS – austin, tx
    15. BEFORE BEFORE BEFORE CONCEPTUAL RENDERINGS FOUNTAINHEAD CORPORATE PARK – tempe, az
    16. BEFORE CONCEPTUAL RENDERINGS LINCOLN MEADOWS – phoenix, az
    17. BEFORE – RETAIL BUILDING BEFORE – INDUSTRIAL BUILDINGS CONCEPTUAL RENDERING CONCEPTUAL RENDERING LINCOLN MEADOWS – phoenix, az
    18. BEFORE CONCEPTUAL RENDERINGS BEFORE CONCEPTUAL RENDERING RESTAURANT & RETAIL ON 1ST FLOOR CENTERPOINT 101 – tempe, az
    19. BEFORE CONCEPTUAL RENDERING - RESTAURANT & RETAIL ON 1ST FLOOR CENTERPOINT 101 – tempe, az
    20. revitalize retail
    21. VISTA VILLAGE – boise, id BEFORE AFTER Gross Square Footage: 85,000 s.f. 100,000 s.f. Occupancy %: 70% 100% Lease Rate/s.f.: $10 / s.f. $20 / s.f. Design Fee: $150,000 Construction Cost: $4 mm
    22. GOALS Revitalize an aging shopping center. Increase returns from existing tenants and attract new tenants. CHALLENGES & SOLUTIONS CHALLENGE Retain part of the building and integrate with new construction seamlessly. SOLUTION A new façade was constructed on the existing structures that integrated with the new buildings. CHALLENGE Create a village atmosphere. SOLUTION A variety of building shapes, forms, setbacks and a wide range of materials help to create the village feel. Individual and unique signage for each tenant creates a fun village atmosphere. CHALLENGE Keep the center open for business during construction phase. SOLUTION We worked closely with the tenants, contractor and owner to provide safe, well identified temporary entrances for each business.
    23. BEFORE CONCEPTUAL RENDERING
    24. BEFORE CONCEPTUAL RENDERING PARADISE VALLEY MARKETPLACE – phoenix, az
    25. BEFORE CONCEPTUAL RENDERING PARADISE VALLEY MARKETPLACE (TRADER JOE’S BUILDING) – phoenix, az
    26. AFTER PHOTOS METRO TOWN CENTER – phoenix, az
    27. BEFORE CONCEPTUAL RENDERING THE SHOPPES AT LA RONDE – sun city, az
    28. BEFORE CONCEPTUAL RENDERING BEFORE CONCEPTUAL RENDERING STONEBRIDGE PLAZA – mckinney, tx
    29. BEFORE CONCEPTUAL ELEVATIONS MESA FIESTA – mesa, az
    30. BEFORE BEFORE CONCEPTUAL RENDERING CONCEPTUAL RENDERING CONCEPTUAL RENDERING AUSTIN RETAIL – austin, tx
    31. BEFORE CONCEPTUAL RENDERING 302 N GILBERT ROAD – gilbert, az
    32. recapitalize the bank
    33. BEFORE BEFORE AFTER AFTER AFTER MIDFIRST BANK – anthem, az Converted Anthem sales center.
    34. refine the resort
    35. CONCEPTUAL RENDERINGS CONCEPTUAL RENDERINGS HOTEL STUDY – phoenix, az
    36. BEFORE CONCEPTUAL RENDERING BEFORE CONCEPTUAL RENDERING SCOTTSDALE HOTEL – scottsdale, az
    37. remake the home
    38. Adaptive re-use from rental apartments to condominiums. BEFORE AFTER AFTER CONCEPTUAL RENDERING COLTER PLACE – phoenix, az
    39. redefine function
    40. GALLERIA CORPORATE CENTER - scottsdale, az BEFORE AFTER Gross Square Footage: 360,000 s.f. 360,000 sf Occupancy %: 0% (empty retail mall) 100% Lease Rate/s.f.: $0 / s.f. $28-31 / s.f. Design Fee: $780,000 Construction Cost: $13 mm
    41. GOALS Turn a failed shopping mall into an office building. Utilize the lower level of the structure as a “Telco Hotel” (server farm). CHALLENGES & SOLUTIONS CHALLENGE The shopping mall had no windows on the north side or the whole second floor. SOLUTION A ribbon of windows was installed around the second floor. In additional a three story bank of windows was installed on the north side of Galleria. The Owner purchased the adjacent piece of property to the north and combined the lots in order to satisfy zoning constraints. CHALLENGE The floor loading for the lower level was substandard for a Telco Hotel. The general standard for this occupancy is 150 – 175 lbs/sf and the original structure was 75 lbs/sf. SOLUTION A new floor was poured at ground level with superior hanging capacity and the lower level was shored up to meet the 150 lbs/sf criteria. CHALLENGE The electrical service was substandard for the use as was the cabling/fiber optic capacity. SOLUTION 3 MegaWatt service was purchased from APS and installed on the adjacent property. In addition, the telecommunications vendor organized a consortium of providers of fiber optic cable to contribute to running service along the length of Camelback Road, east from 40th street to the Galleria. CHALLENGE Increasing rentable square footage. SOLUTION A glazed curtainwall was installed around the perimeter of the atrium in order to capture the original 10 foot wide balcony walkways as rentable square footage.
    42. Winner of 2002 Gold Nugget Grand Award Best Rehab – Commercial/Industrial Project
    43. Adaptive re-use from vacant office building to luxury condominiums. BEFORE CONCEPTUAL RENDERINGS MONROE PLACE CONDOMINIUMS – phoenix, az
    44. CONCEPTUAL RENDERINGS BEFORE EXISTING CONDITIONS CONCEPTUAL RENDERING CENTERPOINT ON MILL – tempe, az
    45. BEFORE CONCEPTUAL RENDERING 34 WEST JACKSON – phoenix, az
    46. retool the auto dealership
    47. 3D BEFORE CIRCULATION STUDIES CONCEPTUAL RENDERING – OFFICE OPTION CONCEPTUAL RENDERING – RETAIL & RESTAURANT OPTION LAND ROVER OF SCOTTSDALE (REPOSITION STUDY) – scottsdale, az
    48. reinvent your interiors
    49. BEFORE AFTER AFTER AFTER SNELL & WILMER
    50. DAVIS DFDia
    51. EQUITABLE REAL ESTATE COMPANY CAMELBACK TITLE AGENCY FENDER MUSICAL INSTRUMENTS OFF MADISON AVENUE
    52. TASER INTERNATIONAL PROVINCE COMMUNITY CENTER BANK OF AMERICA - KIERLAND
    53. rebrand your identity
    54. THE VILLAGES OF EASTRIDGE HAYDEN FERRY LAKESIDE
    55. ASPEN PLACE AT THE SAWMILL - SIGN DESIGNS SKYSONG - CENTER FOR INNOVATION, TECHNOLOGY AND IMAGINATION
    56. FOUNTAINHEAD CORPORATE PARK Conference Room BANK OF AMERICA AT KIERLAND
    57. VACAVILLLE PAVILION SEVILLE by Shea Homes
    58. research the costs
    59. The Property Condition Assessment is a tool to aid a building owner through the identification of existing conditions, opportunities and constraints relating to the property. Once the existing conditions of the property are understood, the Reform® team can establish a renovation scope with budgetary pricing in a menu format. The renovation scope is organized in observation/recommendation bullet points with the corresponding estimated budget numbers relating to the improvements. The scope can cover (but is not limited to) site improvements, architectural renovations, interior architecture (including any ADA issues), graphics and signage, and landscape architecture. This approach allows the owner to implement all or some of the recommended improvements based on his or her personal preference and cost/benefit analysis of each item. Another likely scenario would be a phased implementation recommendations. Through a phased improvement schedule, the building owner would focus on the items with the highest return on investment in the initial stage and follow up with the least critical items in a future phase (or phases). 3300 TOWER – PRELIMINARY BUDGET STUDY
    60. reinvest for the future
    61. Without a doubt, ‘green’ building is the future of real estate. Reform® is an inherently sustainable practice which reuses existing structures rather than demolishing, disposing of and replacing them. To compete with LEED accredited and Energy Star rated properties, a successful renovation should consider the implementation of sustainable systems to compliment the reuse aspect of the Reform® program. • Are outdated systems wasting power and eating into the bottom line? • How easily could the lighting systems be upgraded? • Is there an opportunity to add a solar array to the rooftop? • Are tax incentives or financing plans available for a solar applications? • Will a ‘green’ building better position the property in the marketplace? Reform® has LEED Accredited Professionals on staff who can help you answer some of these question and develop a plan that makes sense for your property. More and more tenants are asking for sustainably built spaces. LEED certifying a building and/or achieving an Energy Star rating may provide the marketing advantage an older structure needs to compete in today’s hyper-competitive leasing environment and could even give an older property an advantage over a non-accredited building built just a year ago if sustainability is a key factor for a prospective tenant. DAVIS RESIDENCE – phoenix, az
    62. return to the community
    63. DAY FOR DOWNTOWN – WOMEN’S SHELTER MURAL & COURTYARD GARDEN PROJECT DAY FOR DOWNTOWN - HUMAN SERVICES CAMPUS MURAL
    64. To meet with a Reform team member, contact Scot Bennett or Rick Markum with DAVIS at 480.638.1100 To see more Reform projects please visit our website at www.thedavisexperience.com Press the ‘esc’ key to exit this show.

    + rick87rick87, 2 months ago

    custom

    102 views, 0 favs, 0 embeds more stats

    Reform is an on-demand team within DAVIS/DFDia focu more

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 102
      • 102 on SlideShare
      • 0 from embeds
    • Comments 0
    • Favorites 0
    • Downloads 1
    Most viewed embeds

    more

    All embeds

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories