Your SlideShare is downloading. ×
PASSIVE HOUSE POSTER
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×

Introducing the official SlideShare app

Stunning, full-screen experience for iPhone and Android

Text the download link to your phone

Standard text messaging rates apply

PASSIVE HOUSE POSTER

8,026
views

Published on

Published in: Design

0 Comments
2 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total Views
8,026
On Slideshare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
35
Comments
0
Likes
2
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. 129 SAWKILL AVENUE MILFORD, PA 18337 OFFICE (570) 296-0466 MOBILE(267) 294-9818 RICHARD@RICHARDPEDRANTI.COM WWW.RICHARDPEDRANTI.COM VIEW FROM THE SOUTHWEST VIEW FROM THE SOUTHEAST Aluminum window sill beyond VIEW FROM THE NORTHEAST VIEW FROM THE NORTHWEST Blocking / furring KARPIAK MULHALL PASSIVE HOUSE 3/4" furring and air space 3M 8067 flashing tape Fiberboard sheathing Extension jamb EPS insulation 1' - 6 5/8" Tyvek=water control layer OSB Dashed line of thermal control layer Dashed line of thermal control layer Intus eforte triple pane inswing casement window 11 7/8" TJI vertical SCRANTON, PA PRECERTIFIED JULY 2013 2x4 at corner Dense pack cellulose insulation LOCATION Wall r-value = 50.7 Extension jamb EPS insulation DESCRIPTION A NEW 2 STORY RESIDENCE FOR A FAMILY OF 4 IN SCRANTON PENNSYLVANIA ON A CITY LOT 100’ X 180’ Timberstrand LSL CONSTRUCTION NOVEMBER 2013 2x4 2x4 5/8" gypbd 1' - 4 7/8" PHPP VERIFICATION Spray foam insulation BLUE - Water control layer Flashing tape at TJI to OSB ANNUAL HEAT DEMAND NORTH ELEVATION WEST ELEVATION 1 1/4" Timberstrand TYPICAL PLAN CORNER DETAIL 30" Raised heel truss WINDOW JAMB DETAILS 5/8" Roof sheathing Vycor prior to setting roof truss OSB continuous to top chord OSB strip before setting roof truss 2'-0" loose fill insulation 3/4" furring and air space Insulation baffle SOUTH ELEVATION Taped seam at OSB EAST ELEVATION Metal roof Dashed line of thermal control layer Dense pack cellulose insulation 6" OSB strip before truss with seams blocked and taped Dashed line is air control layer Tyvek=water control layer Header as per structural drawings OSB Cor o vent 7 Vycor 3M 8067 over Tyvek 6 1 1/4" Timberstrand 5 13 16 5/8" Gypbd 2x4 top plate EPS insulation 14 0' - 2 25/32" 2 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. Window clip UP Triple pane Intus Eforte windows Inswing casement window Spray foam or foam tape DN 3 Vycor Extension jamb R=60.7 EXTERIOR WALL LOAD BEARING OVE 2X4 INTERIOR WALLS INSULATED WITH ROCK WOOL AND SHEATHED WITH ½” OSB CAULKED AND TAPED AS AIR BARRIER. 11 7/8” TJI SCREWED TO STRUCTURAL 2X4 WALLS WITH DENSE PACKED CELLULOSE TO 3.5 PCF AND SHEATHED WITH CELOTEX FIBERBOARD, TYVEK, AND VENTED WOOD CLADDING. Screened cladding vent 1 1/4" #12 wood screws Capillary break R=75.8 FLOOR 6" REINFORCED CONCRETE SLAB OVER 8" OF PERLITE WITH 12" TYPE IX EPS SUB SLAB INSULATION. OSB glued to truss with seams caulked and taped Vented soffit 4 1 Spray foam or foam tape Metal drip cap 0' - 10 3/4" CLIMATE ZONE 6 6291 539 70 140 13 51% 36” 47” OUTLINE SPECIFICATION 8 3/4" window jamb extension 25,299 CU/FT CLIMATE DATA HEATING DEGREE DAYS COOLING DEGREE DAYS MEAN DAYS CLEAR MEAN DAYS RAIN MEAN DAYS SNOW PERCENT POSSIBLE SUNSHINE AVERAGE PRECIPITATION YR AVERAGE SNOWFALL YR Fiberboard GREEN - Air and vapor control layer 2x4 stud 11 7/8" TJI vertical 16,326 CU/FT GROSS BUILDING VOLUME 11 7/8" dense pack cellulose Painted gypbd 888 885 1,773 NET AIR VOLUME Tyvek 3 1/2" structural stud wall 11,632 KBTU/YR 12,148 KBTU/YR 36.2 3 16% 3/4" furring strips OSB Rock woll in service cavity 31.5 KBTU/(FT2YR) TRANSMISSION LOSSES HEAT GAIN SOLAR RADIATION ENCLOSURE R-VALUE ENVELOPE AREA TO TFA ENVELOPE AREA TO GLAZING RED - Thermal control layer 1 1/4" #12 screws Vycor flashing tape PRIMARY ENERGY TREATED FLOOR AREA (TFA) FIRST FLOOR SECOND FLOOR TOTAL TFA 11 7/8" TJI @ 2'-0" O.C.fastened to 2x4 with GRK structural screws Window installation clip 2.75 BTU/(FT2HR) Vented wood siding 2x4 wall stud @ 2'-0" O.C. Dashed line of air control layer 4.52 KBTU/(FT2YR) HEAT LOAD Vycor flashing tape 9 0' - 9 3/4" MUDROOM LIVING ROOM KITCHEN / DINING LAUNDRY / POWDER MECHANICAL OFFICE SCREEN PORCH FRONT PORCH GARDEN TERRACE HALL LIBRARY MASTER BEDROOM MASTER BATH BEDROOM BEDROOM BATH 15 12 10 Continuous 2x10 blocking behind 2x10 ledger Continuous 2x10 ledger with SDS screws and STL hangers 11 R=85.4 ROOF 30" RAISED HEEL ENGINEERED ROOF TRUSS WITH INTERIOR 1/2" OSB CAULKED AND TAPED AS AIR SEAL. 24" OF BLOWN CELLULOSE. GREEN - Air and vapor control layer 2x8 porch roof rafter 2x4 plate WINDOW FRAME INTUS EFORTE WINDOW GLAZING INTUS STANDARD GLAZING 3/4" T&G wood flooring 3/4" floor sheathing 1' - 6 3/8" FIRST FLOOR PLAN U=0.17 BTU/HR.FT2F U=0.09 BTU/HR.FT2F SHGC=0.529 11 7/8" TJI joists @ 2'-0" O.C. SECOND FLOOR PLAN VENTILATION ULTIMATE AIR 200 DX ERV, 83% EFFICIENT, 0.72W/CFM BLUE - Water control layer Control Layers Legend Install window at center of thermal enclosure Window jamb beyond Equal Equal 30" raised heel energy truss HEATING AND COOLING MITSUBISHI INVERTER MSZ-FE09NA & MUZ-FE09NA 11 7/8" LVL continuous rim joist with stl hangers above openings 6 / 12 Roof Assembly (R=85.4) 30" raised heel wood truss Gypbd ceiling finish 1/2" OSB caulked and taped - air seal Wood truss 24" blown in cellulose isulation Roof sheathing Tyvek 3/4" furring Metal roof All control layers are to be continuous Thermal bridge free to 0.006 BTU/HRFT2F RED - Thermal control layer EPS insulation DOMENSTIC HOT WATER RINNAI RL75I TANKLESS GAS HOT WATER HEATER 5/8" gypbd 2x4 top plate Hall 11 7 1 Dashed line of air control layer =OSB EPS frost skirt 3/4" furring and air space Rock wool insulation in service cavity Tyvek=water control layer 3 1/2" structural stud wall 0' - 0 3/4" 0' - 0 3/4" 0' - 0 1/2" 0' - 11 7/8" 0' - 0 1/2" 0' - 3 1/2" " " 5' - 0 " 4' - 0 Continuous 1 1/4" PSL 5/8" gypbd Termite shield 2x4 plate with anchor bolts 4'-0" O.C. and sill seal UP 3' - 0" 2' - 0" Screened cladding vent 1' - 0" Slab Assembly (R=75.8) 6" Reinforced concrete floor finish Taped polyethylene water and vapor barrier 8" perlite 12" rigid under slab insulation 2" flowable fill 8" perlite -1' - 0" 10 mil poly wraped to OSB and taped -2' - 0" 2" EPS frost wing Grade -3' - 0" " -4' - 0 -5' - 0" 0" 4 0' - 0" 8" of Perlite in bags (3) #4 bars @ 3" from edges and bent WWF 12" of EPS insulation with seams sealed 2' - 0" First Floor Plan 0' - 0" Bottom of Slab Insulation -2' - 2" RED - Thermal control layer D OO RW HE S 8" of compacted #2B stone 0' - 0 1/2" Undisturbed soil WINDOW HEAD AND SILL DETAILS 0 6' - -6 '- SOUTH 10' - 0" Mudroom Dense pack cellulose 8' - 10 3/4" NORTH 3/4" window jamb extension Dashed line of thermal control layer Fiberboard sheathing Parged fibercement Living Room 11 7/8" TJI vertical Structural 2x4 stud wall @ 24" O.C. 6" poured concrete slab Mechanical chase 1 1/4" Timberstrand 3M 8067 tape over tyvek 8' - 0" 7' - 0" Solar South 1' - 2" Cor o vent 3.5" mineral wool insulation 0' - 6" 1 1/4" #12 wood screws Second Floor Plan 10' - 0" Tyvek housewrap with seams taped Magnetic North ET RE ST 5 EPS insulation 8' - 0" Vycor Bath 1 TJI Wall Assembly (R=60.7) 11 7/8" TJI @ 24" O.C. Gypbd wall finish 3 1/2" rock wool batts in 2x4 wall cavity 1/2" OSB caulked and taped - air seal 11 7/8" dense pack cellulose in TJI cavity 1/2" celotex fiberboard Tyvek 3/4" furring Board and batten siding 9' - 0" OSB glued to frame - caulked and taped NE PI Metal window sill Triple pane Intus casement windows U =.15 0" 0" Window installation clip 3' 0" 0" 3/4" furring and air space 3M 8067 tape 2' - 4' 11 7/8" TJI @ 2'-0" O.C. 0" '11 " -0 10' 0" 5' Roof 18' - 0" Spray foam or foam tape 6' 11 7/8" dense pack cellulose insulation Painted wood cladding 0" Under sill profile by Intus 1 1. Thermal Control Layer 2. Water Control Layer 3. Vapor Control Layer 4. Air Control Layer BUILDING CROSS SECTION TYPICAL WALL SECTION SITE PLAN T UR CO