This is our first product to be developed at U.S. Concrete\'s R&D facility.
Excess moisture in a concrete slab is a leading cause of flooring problems. Preventing moisture problems in situations where moisture-sensitive floor coverings will be applied is critical. Aridus Rapid Drying Concrete eliminates a major source of moisture-related flooring problems and increases the likelihood that installations will proceed on schedule — without the need for costly topical moisture mitigation treatments.
2. The Problem: Floors Gone Bad
The effects of vapor emissions and high moisture condition
in concrete leads to higher pH that causes:
Adhesive breakdown, de-bonding and blistering
Adding hundreds of millions of dollars in repair costs
Page 2
3. Impacts on Project and Owner
Costly flooring damage, repairs, replacements and
moisture mitigation treatments
Construction delays and cost overruns
Concrete moisture levels not meeting flooring
manufacturer's warranty standards
Mold/mildew damage and air quality concerns
Liabilities associated with flooring failures
Page 3
4. Contractors Face These Risks
When Field Tests Fail or Post-installation Moisture Erupts
Liability
Issues
Environmental
Hazards
Cost Overruns
Damaged
Unplanned
Reputation
Delays
Page 4
5. But I thought solutions existed to
solve high moisture levels…
Page 5
6. Current Options to a “Dry Floor”
Reactive Silicates Integral Admixtures Hybrid Epoxy
Ex: Creteseal, Concure Ex: Barrier1, Xypex, Moxie Ex: Koster, Ardex
What: Surface reaction What: Pore blockers What: Epoxy coating
Spray on treatment designed Integral admixture put into Multi-component system that
to penetrate concrete surface concrete at plant often involves a primer and a
& react chemically with liquid applied epoxy coating
concrete Goal: React to block pores of
concrete internally Goal: Reduce MVER and act
Goal: Reduce Moisture Vapor as isolation barrier to alkaline
Emissions Rate (MVER) and salts, within concrete from
bind up soluble alkali results reaching adhesive
in high pH levels
Reality: Reality: Reality:
Only effective when properly
Moisture vapor will eventually Effective at stopping liquid installed, but…when properly
Only effective
come through water but not moisture vapor installed, but…
Very costly
Can not be used with high SCMs Can not be used with high Very costly
SCMs
Bottom Line: Each option attempts to seal the concrete but none get rid of
the problem within the concrete. None addresses RH.
Page 6
7. Your Choices
Aridus® Concrete
201
Use a
201
2
3
A scientifically
product that engineered rapid
attempts to Wait for concrete
seal the to dry...
drying concrete that
moisture OR consumes excess
Months... Choose water
Years… Reaches moisture
levels required by
flooring manufacturers
and reduces
scheduling delays
Page 7
8. Aridus® Concrete: An Inside Look
Conventional Concrete: Dries slowly from the top down
Drying to this depth could take years
Aridus® Rapid Drying Concrete: Dries throughout the depth
Drying throughout the depth will take
roughly 45 days
The Aridus® Rapid Drying Concrete is the result of more than 6 years of development, laboratory testing and field
verification by U.S. Concrete’s National R&D Lab, USC Technologies
Page 8
9. The Aridus® Advantage It’s Concrete
• Engineered mix guaranteed to quickly consume moisture
1 Eliminates moisture issues
• Safe for flooring in as little as 28 days
• No delays due to extended drying time
• No need for moisture mitigation system. Result: no time associated with:
Eliminates costly and time • Applying multiple surface coatings
2 consuming moisture mitigation • Curing a surface MMS
systems (MMS) or extended • Closing down work area to apply MMS
drying time • Surface prep sandblasting
• Grinding edges due to curling
• Post installation corrections
Eliminates moisture related
3 • No mold/mildew or air quality issues
environmental hazards
• Quicker drying
• High, early strength development offers potential schedule savings => accelerated
construction schedule
4 Superior performance over
conventional concrete
• Superior compressive strength
• Improved drying shrinkage properties
• Very low permeability
• Significantly reduced curling
• Moisture is gone when its time to install floor
5 Your “Insurance Policy”
• Ten year warranty is available
• Six years of development, laboratory testing and field verification by U.S.
Concrete, Central’s parent company
Page 9
10. Opportunities
Resilient/Resinous Flooring
9600 Section
. . .
. . .
Wet Climates Dry Climates Slabs close to
water table
i
Hospitals Schools Data Centers Retail Commercial Residential
Bio-Tech Technology Centers Office
Page 10
11. Project Profile: Customer #1
N. CA High Tech Manufacturing Center
Contractor: XL Construction, Subcontractor: Jos. J. Albanese
Highlights:
Project 1: Placed 1200 cu. yds.; Slab depth 5”-12”
Project 2: Placed 300 cu. yds..; Slab depth 12”
Due to the high early strength of Aridus® concrete, steel was erected 1½ days after the concrete
was poured
Aridus concrete saved time during finishing operations – interior work did not have to stop to
apply a topical moisture barrier
Manufacturer’s MVER & RH moisture requirements were met on-time, allowing flooring
installation to proceed as scheduled
Page 11
12. Project Profile: Customer #1
N. CA High Tech Manufacturing Center
6.0 95
Lab
WD 4.19.2010
MVER (lbs / 1000 ft / 24 hr)
5.5 Field
90 Lab
WD 04.19.2010 WD Field
Relative Humidity (%)
Field Results
WD Field Results
5.0
85
4.5
4.0 80
3.5
75
3.0
70
2.5
2.0 65
0 7 14 21 28 35 42 0 7 14 21 28 35 42
Age (Days) Age (days)
Field results closely tracked lab results
Page 12
13. Project Profile: Customer #2
N. CA Data Center
6.0 100
5.5 Aridus Aridus
MVER (lbs / 1000 ft / 24 hr)
95
Relative Humidity (%)
5.0
90
4.5
85
4.0
80
3.5
75
3.0
2.5 70
2.0 65
8 11 16 11 12 18 22 28 33
Age After Rain Event (Days) Age After Rain Event (Days)
Age (days)
Age (Days)
Contractors: Turner/Conco
Highlights:
Placed 24 cu. yds.; Slab depth: 6”
Aridus® Concrete met the moisture targets at two weeks, even after multiple rain events
Aridus Concrete was finished to a superflat surface
Page 13
14. Project Profile: Customer #3
N. CA High Tech Center
Contractor: XL Construction
Highlights:
Placed 41 cu. yds.; Slab depths: 4”- 8”
Aridus® concrete slab was ready for epoxy within 2 weeks
Several placements made; each performed to specifications
Page 14
17. Aridus®
Rapid Drying Concrete
For more information contact:
David Perry
Vice President, Sales & Marketing
Central Concrete Supply Co.
www.centralconcrete.com
Mobile: 925-998-5169
17
22. Independent Validation Testing: MVER & Internal RH
Tests Conducted
ASTM F1869 MVER Burnished Finish Steel Trowel Finish
Moisture Vapor Emission Rate 3 Day Plastic Cure 3 Day Plastic Cure
Control Aridus Control Aridus
ASTM F2170 RH
Internal Relative Humidity MVER = 8.8 MVER = 3.7 MVER = 9.1 MVER = 4.1
RH = 93% RH = 75% RH = 94% RH = 75%
Background:
Control: Commonly used mixture
for a slab-on-grade placement Burnished Finish Steel Trowel Finish
(w/c = 0.41) 7 Day Plastic Cure 7 Day Plastic Cure
Data taken at 30 days Control Aridus Control Aridus
Highlights: MVER = 9.3 MVER = 3.5 MVER = 9.2 MVER = 4.1
RH = 93% RH = 75% RH = 94% RH = 75%
Aridus® met RH target of < 80%
Aridus met MVER target of: less
than 5 lbs./1000 SQ FT/24hr
Page 22
23. Validation Testing: Shrinkage
0.040
ASTM C157 SEAONC 0.036
Rapid Drying Concrete
Shrinkage Test 0.035
W/C = 0.41, 50% Cement, 6.5 sk
Conditions: 73 degrees, 50% 0.030 0.028
RH 0.024
0.025 0.023
0.021
Highlights: 0.020
0.020
Aridus® concrete 0.015 0.013
dramatically outperforms a 0.011
“low-shrink” concrete 0.010
Most of shrinkage occurs 0.005
during the first two weeks
0.000
7 Day 14 Day 21 Day 28 Day
Page 23
24. Validation Testing: Compressive Strength
ASTM C31
9,000
Compressive Strength Aridus w/c = 0.41, 50% Cement, 6.5 sk
8,000
Conditions: 73 degrees, 50% 7,000
RH
6,000
Strength (psi)
Highlights: 5,000
Aridus® concrete is a 4,000
high, early-strength mix 3,000
2,000
Design strength can be met
in seven days 1,000
0
4 7 28
Age (Day)
Page 24
25. Additional Testing: Slab Curling Test
Concrete Curling
Highlights:
Aridus® mixture rapidly stabilizes
in less than a month
Control: Degree of curl rises for
months.
Page 25
26. Thank You!
For more information contact:
Dave Perry
Vice President, Sales and Marketing
Central Concrete, A U.S. Concrete Company
www.centralconcrete.com
DPerry@us-concrete.com
Tel: 925-998-5169
Page 26