Integrated Campus Development Plan
Upcoming SlideShare
Loading in...5
×
 

Integrated Campus Development Plan

on

  • 2,722 views

Integrated Campus Development Plan Presentation of Rustenburg High School for Girls, Cape Town, South Africa

Integrated Campus Development Plan Presentation of Rustenburg High School for Girls, Cape Town, South Africa

Statistics

Views

Total Views
2,722
Views on SlideShare
667
Embed Views
2,055

Actions

Likes
0
Downloads
6
Comments
0

3 Embeds 2,055

http://www.rghs.org.za 2039
http://rghs.glio.co.za 13
http://rghs.org.za 3

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Integrated Campus Development Plan Integrated Campus Development Plan Presentation Transcript

  • Integrated Campus Development Plan (ICDP) – March 2012 Campground Rd, Rondebosch Cape Town T: 021 686 4066 @: bekkerl@rghs.org.za www: rghs.org.za
  • Integrated Campus Development Plan:• Integrated plan caters for needs and priorities identified by school community• Enhances character of existing school buildings and grounds as the main asset• New-build confined only to essential needs not met by existing facilities• Seeks to provide every full-time Educator with a classroom• Rationalises roads and provides parking to ensure improved pedestrian safety and traffic flow• Sets in place a logical sequence of development• Provision for long term projects such as multi-purpose hall and/ or hostel extension www.rghs.org.za
  • Integrated Campus Development Plan – Key Intervention Areas Maths/Science Block Aquatic Centre Leadership Centre Main Entrance & parking www.rghs.org.za
  • Phase “0” (Completed Oct 2010) : Kemp Hall Courtyard  March – October 2010 • Paving and landscaping • Store rooms • Sports office • Covered Kemp Hall verandah • Upgrading of change rooms • Soccer field seatingBeforeAfter www.rghs.org.za
  • Phase 1: Maths & Science Block www.rghs.org.za
  • Phase 2: Ground Floor – Science Laboratories • 3 x custom built laboratories • Preparation room • Exhibition/Display areas www.rghs.org.za
  • Phase 1: First Floor – Mathematics Classrooms • 4 x Mathematics classrooms • Bridge to adjoining School building www.rghs.org.za
  • Artist’s Impressions www.rghs.org.za
  • Phase 2: Leadership Centre • Life Orientation classrooms • Counselling area • ROGU office • Conference/Functions Room www.rghs.org.za
  • First FloorGround Floor www.rghs.org.za
  • www.rghs.org.za
  • RUSTENBURG HIGH SCHOOL FOR GIRLS Proposed Integrated Campus Development Plan (2015 and beyond) These phases will be implemented on a needs driven and opportunity basis.PHASE 3 : Aquatic Centre 9. Parking area 10. Pedestrian link to fields1. Service road 11. Erinville Hostel crossing2. Heated Waterpolo Pool and Facilities 12. Waiting shelter 13. Forecourt landscaping extension to newPHASE 4 : Roads, Landscaping & Tennis Courts road 14. Soccer field seating extension1. Campground Road entrance 15. Erinville carports2. Entrance roadway and landscaping3. North road parking PHASE 5: Sports Fields4. South road parking5. Staff parking 1. Astroturf Hockey Field6. South entrance7. Realigned circular road and stop & drop PHASE 6: Multipurpose Hall parking8. Barrier Wall and Tennis seating area 1. Located on meadows south of Erinville9. Pedestrian access to Charlie’s Hope www.rghs.org.za