062. Comprehensive Mobility Plan Brt

12,788 views
12,182 views

Published on

Slides related to BRT in the Comprehensive Mobility Plan (CMP) in the presentation made by the Commissioner to the Chief Minister

Published in: Business, Health & Medicine
1 Comment
0 Likes
Statistics
Notes
  • Be the first to like this

No Downloads
Views
Total views
12,788
On SlideShare
0
From Embeds
0
Number of Embeds
26
Actions
Shares
0
Downloads
208
Comments
1
Likes
0
Embeds 0
No embeds

No notes for slide

062. Comprehensive Mobility Plan Brt

  1. 1. 5 10 3 3 6 4 13 14 16 7 17 18 20 19 23 24 27 28 26 22 a b c d f g h i j 1 a Implemented Rs1013 Cr BRT Pilot (2) BRT Phase-I (10) CYG-BRT (12) CYG Link (10) Proposed Prop. Addl Links 19 22 e A 25 A Balewadi Sports Complex Nehru Stadium BRTS & CYG Links Approved Under JNNURM in Pune City Under Implementation completed by March 2009 21 part 1 2
  2. 2. PIMPRI CHINCHWAD MUNICIPAL CORPORATION BRT CORRIDORS Final Report - Bus Rapid Transit System for PCMC 4 9 ` BRT Corridors No. Name 5 1 Aundh Ravet 2 NH4 2 3 Telco Road A 4 Dehu-Alandi C 5 NH50 6 Hinjewadi to Dehu-Alandi Road B 7 Kalewadi-KSB Chowk-Dehu Alandi Rd 8 Vishrantwadi- 3 Alandi 9 Ravet Punawale to Bhakti Shakti to Talwade Buses with mixed traffic Feeder Routes Dedicated 6 A Hinjewadi to tata Bus lanes motors Feeder routes B Pradhikaran 7 C Road Parallel to 8 Aundh Ravet 1
  3. 3. PIMPRI CHINCHWAD MUNICIPAL CORPORATION
  4. 4. TYPICAL PLAN FOR 45 M ROW At Grade Bus Stop, ROW - 45 m Final Report - Bus Rapid Transit System for PCMC POLYCARBONATE ROOF 7.80 7.80 7.20 0.60 3.30 3.30 0.20 BUS STOP BUS STOP PLATFORM PLATFORM TYPICAL PLAN FOR 45 M ROW May 2008 NOTE: MAP NOT TO SCALE
  5. 5. Project Cost PIMPRI CHINCHWAD MUNICIPAL CORPORATION Corridor Length (km) Width Cost (Rs. crs) BRT- 4 Dehu Alandi 14.50 45 203.08 BRT -5 NH-50 12.10 61 631.76 BRT-6 Hinjewadi to Dehu Alandi Road 21.60 45 291.09 BRT- 7 Kalewadi-KSB Chowk -Dehu Alandi Road 13.30 45 302.10 BRT- 8 Vishrantwadi- Alandi 11.60 61 229.73 BRT- 9 Ravet Punawale – Talwade 20.20 30 349.70 Total 93.30 2007.46

×