DCP DICP Updates

2,731 views

Published on

Introductory presentation for the DCP Batch 14 for E-classroom packages.

0 Comments
2 Likes
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
2,731
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
103
Comments
0
Likes
2
Embeds 0
No embeds

No notes for slide

DCP DICP Updates

  1. 1. DCP/DICP UPDATESDepED Technical ServiceArt TuazonOIC, DCP/DICP
  2. 2. DepED Schools School Type BOSY 2011ES, multi-grade 7,521ES, mono grade 30,980High School 7,470TOTAL 45,971
  3. 3. 1. DepED Comptzn Program• Aims to install computer packages in Elem and HS nationwide• Started in 2007 (early as 2001 with DTI)• Package Types • ES: 1 host + 6 Thin Clients • HS: 7 sets of ES package (Lab Model)
  4. 4. Power Availability With No School Type BOSY 2011 PowerES, multi-grade 7,521 40%ES, mono grade 30,980 11%High School 7,470 4%TOTAL 45,971 14% 6,564 schools
  5. 5. ICT Provision With School Type BOSY 2011 ComputersES, multi-grade 7,521 9%ES, mono grade 30,980 61%High School 7,470 88%TOTAL 45,971 57% 26,026 schools
  6. 6. 1. DepED Internet Connectivity• Provides HS with Internet Subscription Costs to their OpEx Budgets • PhP 48,000 or US$ 95/month• Mix of ISPs • Digital Subscriber Line (DSL) • Fixed Wireless (Canopy, WiMax) • 3G/HSDPA (USB transceivers) • Satellite-based
  7. 7. Internet Access With School Type BOSY 2011 InternetES, multi-grade 7,521 1%ES, mono grade 30,980 8%High School 7,470 40%TOTAL 45,971 12% 5,579 schools
  8. 8. DCP status using BY2010• ES and HS Computer Pkges (3 Lots) • 2 awarded as of 09 Nov • 1 for rebid• DBM-PS managing the procurement• Enhancements in TOR/Specs • Better after-sales requirements • ‘Whole package’ warranty
  9. 9. DCP and DICP next steps• Reliability issues with certain ISPs• Review of DCP ES/HS specs• Monitoring system (draft by Dec 2012)• Review policies on DCP/DICP (Dec 2012)• Download 2012 budgets to Divisions • Empowerment (RA 9155), Local knowledge, Leverage.
  10. 10. Satellite-based Internet
  11. 11. Teacher Hands On Teachers try out an interactive learning resource that can be found in DepEds Learning Resource Management and Development System (LRMDS). For the purposes of the training, the file was made available locally as there was no internet connection available.
  12. 12. 3. The LRMDS • Learning Resources Management and Development System • Part of AusAID TA piloted in Regions 6,7,8 (Visayas Islands) and in Region XI • Means of distributing materials for repro in division LRCs • To date, 2400+ learning resources in the portal • Vetting process
  13. 13. LRMDS Main Page
  14. 14. Challenges• Power Availability, Internet Coverage• Obsolescence • Market monitoring and package review • What is the next ICT use model? Is current model sustainable?• Green Computing • Green Procurement• Professional Dev’t and New Content

×