Aurora heights first homes final

244 views
187 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
244
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Aurora heights first homes final

  1. 2. Project Site (4,820 sqm) Aurora Blvd Katipunan GOOD LOCATION
  2. 3. Project Site (4,820 sqm) Aurora Blvd Katipunan LRT 2-KATIPUNAN STATION GOOD LOCATION
  3. 4. Project Site (4,820 sqm) Aurora Blvd Katipunan NCBA PSBA MIRIAM COLLEGE KOSTKA ATENEO DE MANILA UNIVERSITY GOOD LOCATION St. Bridgets
  4. 5. SITE SITE
  5. 6. <ul><ul><li>Built-in furniture </li></ul></ul><ul><ul><li>Bed and Built-in bedroom Closet </li></ul></ul><ul><ul><li>Sofa Set </li></ul></ul><ul><ul><li>Kitchen Storage Cabinet </li></ul></ul><ul><ul><li>Refrigerator </li></ul></ul><ul><ul><li>Cooktop Burner </li></ul></ul><ul><ul><li>Dining Set </li></ul></ul><ul><ul><li>Blinds </li></ul></ul>MOVE-IN READY
  6. 7. Unit Finishes Painted finish Ceiling Painted plain cement finish Ceiling Living/Dining Area/Kitchen Floor Vinyl tiles Wall Painted finish Others Counter top & Under Counter Cabinet Bedrooms Floor Vinyl tiles Wall Painted finish Others Built-in Closet Toilets/Bathroom Wall Ceramic Polished Wall Tiles Floor Ceramic Vitrified Matte floor tiles Ceiling Painted Finish
  7. 8. Tower 1 Building Features & Amenities MASTER PLAN The Aurora Heights Residences is master-planned for two residential towers with a common podium, a clubhouse, adult and children’s swimming pool, landscaped garden and play area. Secured Community Main Lobby Three elevators including service elevator Emergency Power Fully-furnished units Clubhouse Mail Boxes at Ground Floor Lobby CCTV Retail Spaces at Ground Floor
  8. 9. PROJECTED TCP & PAYMENT TERM AFFORDABLE
  9. 10. 2 Br Unit 18 sqm. Php 10,000/mo.
  10. 11. 3 Br Unit 28 sqm. Php 15,000/mo.
  11. 12. 1 * * * 2 3 4 5 6 7 8 * * 9 10 11 * * 12 14 15 * 16 * 17 * 18 19 20 21 22 23 24 25 * * * 26 27 * 28 * 29 30 * 31 32 3 BR – 15 units 2 BR – 16 units LEGEND: * GARDEN UNITS
  12. 13. 1 2 3 4 5 6 7 8 9 10 11 12 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 31 32 33 34 30 9 11 12 14 8 * * * * * * * * * * * * * * * * * * LEGEND: * 2 BR – 18 units 3 BR – 15 units TYPICAL FLOOR
  13. 14. Development Schedule 2010 2011 2012 2013 Planning & Site Development Tower 1 Construction Estimated Turnover Date for Tower 1: December 31, 2013

×