Risk assesment

127 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
127
On SlideShare
0
From Embeds
0
Number of Embeds
16
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Risk assesment

  1. 1. Risk How at risk Control MeasuresGeneral Public People walking past that do not want tobe filmedPeople walking past in shot of thecameraCamera could be stolenAvoid filming when people arepassingStop filming when people want topass and we are in the way filmingKeep the camera in a bag when itis not being usedDamage Camera could be damaged by rain orcarelessnessKeep a bag for the camera at alltimes of filming and cover in rainyweatherPermission Filming may not be permitted in somelocations such as neighbour’s housesAsk for permission to filmanything with neighbour’s housein shot and ensure all otherlocations aren’t private propertyunless allowedNoise Noise from traffic and members of thepublic could be heard on the recordedfootageTry to avoid filming at busy timesof day and avoid filming at busytraffic times of day and wherethere are lots of traffic movingAlso in terms of general publicwalking past talking possibly,avoid shooting the trailerDistress to the publicduring the actionsceneScreaming and dragging charactersthrough the woods may lead membersof the public to be worried or distressedAvoid shooting when members ofthe public around and at busytimes

×