Your SlideShare is downloading. ×
0
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Chelmsford fire dept 2011 bos 2-27-12
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Chelmsford fire dept 2011 bos 2-27-12

319

Published on

Chelmsford New fire Dept Plan 2011

Chelmsford New fire Dept Plan 2011

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
319
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Board of Selectmen Update ReportFire Department Headquarters February 27, 2012
  • 2. Chelmsford Fire Department Headquarters WHY WE ARE HERE | Board of Selectmen Goals 2010 - 2011 Fire Department Headquarters Facility Assist the Permanent Building Committee’s effort to develop a plan for a fire headquarters: Identify the location for a headquarters facility; Produce a financial plan to fund this project;
  • 3. Chelmsford Fire Department Headquarters Why does the Town need a new Fire Department Headquarters?
  • 4. Chelmsford Fire Department Headquarters Fire Department Issues and Inadequacies | • Structural deficiencies • Building code deficiencies • Inadequate medical cleaning / decontamination area • No training facilities • Technology is outdated • Lack of Storage • Poor living quarters • Undersized apparatus bays • Current lot size is too small for expansion
  • 5. Chelmsford Fire Department Headquarters Fire Department Current Conditions | Center Fire Headquarters was constructed in 1952 for a volunteer fire department serving a rural community of less than 10,000 people. Overhead doors are too small requiring the Lack of ceiling height limits ability to Fire Department to order more expensive access equipment for general special order apparatus in order to fit inspection/repair functions
  • 6. Chelmsford Fire Department Headquarters Fire Department Current Conditions | Support spaces are undersized and inefficient Technology systems are inadequate
  • 7. Chelmsford Fire Department Headquarters Fire Department Current Conditions | Building is in dire need of repairs/upgrades Apparatus floor is failing requiring temporary Temporary supports displace usable locker structural supports in basement displacing area for Fire Fighters apparatus storage
  • 8. Chelmsford Fire Department Headquarters Fire Department Headquarters Programming Requirements
  • 9. Chelmsford Fire Department HeadquartersFire Department Headquarters Programming Results | 2009 2011 Administration: 3,272 SF 1,875 SF Shared Operations Areas: 2,145 SF 1,937 SF Operations Administration: 3,942 SF 3,447 SF Operations / Apparatus: 14,001 SF 9,775 SF Support: 3,681 SF 2,455 SF Total: 27,041 SF 19,489 SF (28% SF Reduction) Reductions achieved by relocating some support functions to other available town spaces and by incorporating programming concessions identified by the Design Team, PBC, and the Fire Department
  • 10. Chelmsford Fire Department Headquarters Fire Department Headquarters Possible Sites
  • 11. Chelmsford Fire Department HeadquartersFire Department Headquarters Siting Requirements | Site size: +/- 2 acres Drive through capabilities to expedite response times Per the 2007 Fire Station Location Study, the new Headquarters should be “located in a location close to the current Headquarters”
  • 12. Chelmsford Fire Department Headquarters Crosby Ln / North Road 24/28 North Road Chelmsford / Wilson Street 50 Billerica Road (rear) 7 North Road (existing site) 50 Billerica Road (front) 5 North Road
  • 13. Chelmsford Fire Department HeadquartersFire Department Headquarters Other Sites Considered | Drum Hill Site Stop & Shop Site
  • 14. Chelmsford Fire Department Headquarters Fire Department Headquarters 50 Billerica Road (front)
  • 15. Chelmsford Fire Department Headquarters Little League Field Softball Fields Existing Town Offices
  • 16. Chelmsford Fire Department Headquarters Little League Field New Town Office Parking Softball Fields Renovated Town Office Space for Fire New Fire Department Department Headquarters Existing Town Offices
  • 17. Chelmsford Fire Department Headquarters New Construction: 484 SF Existing Gym Existing Town Offices Ground Level • Accessible Entry (corridor & elevator) Billerica Road
  • 18. Chelmsford Fire Department Headquarters New Construction: 755 SF Renovation: 3,415 SF Secured Access to Fire Department Headquarters Existing Town Offices Lower Level • Fire Department Administration Billerica Road • Fire Prevention • Shared Fire Department Training / Public Meeting Area
  • 19. Chelmsford Fire Department Headquarters New Construction: 11,385 SF Existing Existing Town Offices Public Entry Existing Public Entry Street Level • Public / Operations Entry • Apparatus Bays Billerica Road • Operations Support Space • Firefighter Support Space
  • 20. Chelmsford Fire Department Headquarters New Construction: 3,383 SF Mezzanine: 1,230 SF Existing Town Offices Upper Level • Firefighter Support Space Billerica Road
  • 21. Chelmsford Fire Department Headquarters New Fire Department Headquarters Previous Proposal • New Construction: 19,500 SF New Proposal • New Construction: +/- 16,007 SF • Renovation of Existing Space: +/- 3,415 SF Total: +/- 19,422 SF
  • 22. Chelmsford Fire Department Headquarters Conceptual Rendering of Fire Department Headquarters
  • 23. Chelmsford Fire Department Headquarters Conceptual Rendering of Fire Department Headquarters
  • 24. Chelmsford Fire Department Headquarters Benefits of the New Proposal for the Fire Department Headquarters • Right location for the Fire Department Headquarters in accordance with NFPA response times • Renovation and re-use of the existing unused space in the Town Offices • Shared Fire Department and Community space • Site is Town owned – no site acquisition costs • Relocation of the Wilson Street softball fields are not required • Additional parking provided in back of the Town Offices • Improvements to the Town owned property • Construction costs are still low
  • 25. Chelmsford Fire Department Headquarters Next steps • Validate costs • Conduct Code Analysis to identify extent of renovations to existing building • Exterior wall rating • Connector rating • ADA upgrades • Fire suppression requirements • Seismic requirements

×