PROJECT PROGRESS REPORT                              As of EO March 2012Project Title: Kabugao-Pudtol-Luna-Cagayan Boundar...
CurrentImplementationIssues and/orProblemsEncountered (if any):Actions Taken/Recommendations:Remarks:                Memo ...
Project Location                           Kabugao-Pudtol-Luna                            Cagayan Bdry Road               ...
Kabugao-Pudtol-Luna Cagayan Bdry. Road                              Mataguisi Valley    Babulayan Bridge across         Ap...
Upcoming SlideShare
Loading in …5
×

Kabugao-Pudtol-Luna-Cagayan Boundary Road

589
-1

Published on

Published in: News & Politics
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
589
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Kabugao-Pudtol-Luna-Cagayan Boundary Road

  1. 1. PROJECT PROGRESS REPORT As of EO March 2012Project Title: Kabugao-Pudtol-Luna-Cagayan Boundary RoadImplementing Agency: Department of Public Works and Highways - CARDonor: (x) GOP Loan/Grant Proceeds: ( ) Loan Peso Counterpart: ( ) Grant Total Project Cost: P 58.827 MLocation/Area Apayao ProvinceCoverage:Description:The road is a major component of the Cordillera Roads Improvement Project (CRIP)as the northern tip of the regional backbone. It traverses the municipalities ofKabugao, Pudtol and Luna in Apayao and turns east to Abulog in Cagayan.The Kabugao-Pudtol-Luna-Abulug Road (95.7 km) directly links the capital townKabugao to lower Apayao. The road starts at junction Lenneng along the Kabugao-Conner-Abbut Road and going north-east traverses municipalities of Kabugao, Pudtoland Luna and ends at Junction Luna in Abulug, Cagayan along the Pan-PhilippineHighway. The Pan-Philippine Highway connects Laoag, Ilocos Norte andTuguegarao, Cagayan.The bridge construction across Maton and Nagan Rivers has been completed. Theserivers are major tributaries of Apayao River.The gap at the Kabugao side (19.359 km.), traverses a rugged mountainous terrain,then slowly goes down to the Paco Valley, which was then proposed as governmentcenter. The road will also traverse the Mataguisi Valley in Pudtol. The valleys havevast potential for agricultural production. While, Luna, is the location of the newprovincial capitol.The specific project output is road construction of 2.873 kms.Project Duration: Start: February 20, 2012 End: October 16, 2012 PROJECT PROGRESS For CY 2012 AO 1 Quarter AO 2nd Quarter AO 3rd Quarter AO 4th Quarter stTarget 5%SeedlingProductionActual 5%SlippageCumulative Status: Status Physical Financial(Since start of Target 5%project) Actual (slippage)
  2. 2. CurrentImplementationIssues and/orProblemsEncountered (if any):Actions Taken/Recommendations:Remarks: Memo (Nov. 3, 2011) from Secretary Singson: Approved for upgrading from Secondary to Arterial RoadAgency Contact DIR. EDILBERTO P. CARABBACANPerson: Regional Director, DPWH – CAR Engineer’s Hill 2600 Baguio City Tel. 444-8838
  3. 3. Project Location Kabugao-Pudtol-Luna Cagayan Bdry Road New Apayao Provincial Capitol in LunaLandmarks
  4. 4. Kabugao-Pudtol-Luna Cagayan Bdry. Road Mataguisi Valley Babulayan Bridge across Apayao River Junction Lenneng Paco Valley (Kabugao)

×