RCREEE-enerMENA_Tunisa development

  • 258 views
Uploaded on

Renewable Energy for Project Planners and Managers:enerMENA Professional Training Course for CSP …

Renewable Energy for Project Planners and Managers:enerMENA Professional Training Course for CSP
19-23 August,2013
Cairo, Egypt.

More in: Technology , Business
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
258
On Slideshare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. August 21st 2013 - Amman - Jordan DEVELOPMENT OF RENEWABLE ENERGY IN TUNISIA (STEG) RCREEE/enerMENA Professional Training Course for CSP
  • 2. R E IN TUNISIA RE 2011 2013 wind 54 244 Hyd 66 66 PV 1.7 3.7 Realisation 0% 2% 4% 6% 8% 10% 3% 8% 1% 6% Puissance Energie ER in STEG Grid MW
  • 3. DÉVELOPPEMENT OF WIND ENERGY AND HYDRO
  • 4. POTENTIEL EOLIEN Wind Potentiel speed> 6m/s
  • 5. Ferkik Mahdia Jbel Tbaga Akarit Thala Gabés Jbel Abderahmen Sidi Mechreg Ben AoufZonkar : Sites prospectés : Sites identifiés mais qui n’ont pas fait l’objet des campagnes de mesure par la STEG :Sites identifiés et mesurés : Mât de mesure STEG WIND ENERGY Sites assensement in STEG
  • 6. Sidi Daoud Sidi Daoud Wind farm : Installed capacity 54 MW WIND POWER PLANTS
  • 7. LES RÉALISATIONS DANS L’ÉOLIEN Bizerte Wind farm : Installed capacity 190 MW (120 +70) Kechabta Metline
  • 8. HYDRO Installed Capacity: 66 MW. Annual generation : 50 to 160 GWh, Conservation 12 000 tep to 38 000 tep /a.
  • 9. Installed C : 400 - 500 MW Owner: STEG. Site : Oued El Melah. I.C : 2020. DEVELOPPEMENT OF STEP (STORAGE)
  • 10. DEVELOPPEMENT OF SOLAR ENERGY
  • 11. RESSOURCE EN ÉNERGIE SOLAIRE 1 800 kWh/m²/an Nord 2 600 kWh/m²/an Sud Solar Potential
  • 12. PROSOL- THE AND ELC
  • 13. DÉVELOPPEMENT PV 1- Rooftops Planned capacity : 13 MW. Energy produced : 23 GWh/an. Owner : STEG. Target: STEG building, administrative building … Period : 2014 – 2016. Investment : 40 M€. Pilot installation at STEG HQ-building 22 kWp + 13 kWp
  • 14. DÉVELOPPEMENT PV PV plant for Electricity production Planned capacity : 10 MW Owner : STEG. Planned Sites : South of Tunisia. Investment : 25 M€. Planned to be in operation in 2014
  • 15. DÉVELOPPEMENT PV CPV demonstrator Capacity planified : 50 kW - 1 MW. Objectif : R&D (performance, fiability, storage, etc.). 75 kW : water pump saouth Tunisia
  • 16. CSP DEVELOPPEMENT CSP for Electricity production Planned capacity : 50 MW Owner : STEG. Planned Sites : South of Tunisia. Investment : 250 M€. Planned to be in operation in 2016.
  • 17. STEG RE DEVELOPPEMENT PROGRAM project Capaciy MW Production GWh And installation wind power plant T1 80 210 2017 power plant T2 110 289 2019 PV PV power plant 1 10 17 2014 Roofs 13 21 2016 PV power plant 2 50 85 2019 CSP CSP power plant 50 132 2017 OTHERS Station de Transfert d'Energie par Pompage (STEP) 400 800 2020 STEG Projects 2013-2020
  • 18. DEVELOPPEMEN PERSPECTIVES 8 11 20 6 9 16 0.0 5.0 10.0 15.0 20.0 25.0 2013 2016 2020 Puissance Energie Taux d’intégration des ERs Horizon 2020 
  • 19. Energy Conservation Law in 2009 Any company or groups of companies can produce electricity for their own consumption. Self producers are allowed to use national electricity grid when the electricity is not generated locally. STEG is obliged to buy electricity surplus in the limit of 30%. ENERGY CONSERVATION LAW Regulatory framework for electricity export and renewable energy production by private sector is under preparation.
  • 20. June 2013:Tunisian national debate on Energy : what is the best energy mix for the country in the horizon of 2030 ? https://www.facebook.com/DebatEnergie2013?ref=ts&fref=ts
  • 21. www.steg.com.tn Eng. HAMROUN Adel : ahamroun@steg.com.tn Tel : +216 28818473