RCREEE-enerMENA_energy in yemen

698 views
494 views

Published on

Renewable Energy for Project Planners and Managers:enerMENA Professional Training Course for CSP
19-23 August,2013
Cairo, Egypt.

Published in: Technology, Business
0 Comments
1 Like
Statistics
Notes
  • Be the first to comment

No Downloads
Views
Total views
698
On SlideShare
0
From Embeds
0
Number of Embeds
7
Actions
Shares
0
Downloads
0
Comments
0
Likes
1
Embeds 0
No embeds

No notes for slide

RCREEE-enerMENA_energy in yemen

  1. 1. The Republic of Yemen ‫اليمنية‬ ‫الجمهورية‬ Energy in YEMEN Eng.Ahmad Salem Alkhawlani Manger of Wind Energy Department Ahmad.salem1980@gmail.com
  2. 2. Profile Capital: Sana’a Language: Arabic Area: 527.970 km2 Population (2012): 25.000.000 Population growth: 3% The Republic of Yemen Total Urban Rural Population 25 Mio 22% 75% Below Poverty Line 65% Electrification rate 50% 25%
  3. 3. The Republic of Yemen – Country Facts (Energy) Solar Radiation in Yemen varies between 1800 and 2400 kWh/m2/a Mean Average wind speed in the country varies from 4.5 to 6.5 m/s. Present Conventional Energies Potential Renewable Energies The oil and gas sector accounts for 70% of central government revenues In July 2005 the Republic of Yemen decreased subsidies on fuel prices
  4. 4. Forecast Power Demand in Yemen
  5. 5. Planned Transmission Lines (400kv) (2010-2025) Transmission Lines: 1- Amran-Saada(400Kv=200Km) 2- Sanaa-Dhamar(400Kv=180Km) 3- Hodiedh-Taiz-Aden(400Kv=360km) 4- Aden-Bilhaf-Sieyon(400Kv=650Km) 5-Bilhaf-Beihan-Mareb(400Kv=320Km) 6- Hodiedah-Saada(400Kv=300Km) 10 Strategic Electricity Plan up to Year 2025
  6. 6. 11 11
  7. 7. 400MW Wind by the end of 2025
  8. 8. AL-Mokha wind farm project The first wind farm with a total capacity of 60 MW Project under tendering AL-Mokha wind farm project Private Sector-IPP total capacity of 60 MW Project under signing the agreements with the Korean company.
  9. 9. A pilot project for the first geothermal power plant with capacity 10MW in Thamar City  Tendering & evaluation and selection it has been done  Diging of the well will be start. (IP)Investment plan for renewable energy in Yemen 2013-2014 in cooperation with SREP Currently tender has been prepared Now under evaluation to select the consultant
  10. 10. Geothermal Recourses in Yemen&160MW by the end of 2025
  11. 11. Barriers / Renewable Energy Development  Lack of renewable energy policy framework in Yemen  Lack of expertise and skilled personal who can carry out planning, design and implementation of renewable energy programs  Lack of professional institutions providing technical support to renewable energy development  Financial and economic Barriers  Lack of resource data  Lack of technical code and standards for grid interconnection of renewable power projects  Lack of technical skills in design, planning and implementation of renewable energy projects in the country  High Risk
  12. 12. Thank You For Your Attention Eng.Ahmad Salem Alkhawlani Ahmad.salem1980@gmail.com

×