www.med-enec.com                                               By: Ammar Al-Taher/MED-ENEC                                ...
1.  The Council of Arab Electricity Ministers of the League of Arab    States has adapted the Arab EE Guideline during the...
4.   The process of translation, adaptation and adoption of the EU     directive into the Arab EE Guideline took two years...
7. The LAS EE Working Group during its 2nd meeting that took place inKhartoum on 23 November 2011 included the following r...
1. Conducts an energy audit against a fixed fee. Delivers a report withrecommendations and pulls out.2. As in case 1. In a...
To conduct a study on the availability of trainingand certification of energy managers and energyservice providers and to ...
ü  To improve the awareness of the Arab EE Guideline and its    different articlesü  To give the participants a feel of ...
Article I: Purpose(B)Creating the appropriate conditions for the development and promotionof a market for energy services ...
v     Annex B provides samples for eligible measures for the different       sectors such as:v     Energy auditsv     E...
It requires each government to make sure that the public sector:v   is under this Guideline. Sample measures are listed i...
v        do one or more of the following:      1.    Offer competitively priced energy services to customers      2.    O...
Governments to ensure the availability of appropriate qualifications,       accreditation and certification schemes for th...
Governments to make available the required financial resources to support and implements it energy efficiency programs and...
Qualification and certification schemes are neededto regulate the market and protect consumers.It becomes a must to insure...
ü     Job Description:         Ø    Energy Data Collection and Analysis         Ø    Energy Purchasing Supervision     ...
This project is fundedby the European Union                         16
This project is fundedby the European Union                         17
ü     Sector Specificü     Access to instrumentsü     Qualificationü     Certificationü     Contract contents (templa...
This project is fundedby the European Union                         19
ü     Qualificationsü     Access to instrumentsü     Access to EE equipment & Suppliersü     Access to Financingü    ...
This project is fundedby the European Union                         21
This project is fundedby the European Union
This project is fundedby the European Union
Thank Youwww.med-enec.com      This project is funded      by the European Union
Upcoming SlideShare
Loading in …5
×

Medenec beirut may_7_final

395 views

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
395
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
1
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Medenec beirut may_7_final

  1. 1. www.med-enec.com By: Ammar Al-Taher/MED-ENEC The contents of this publication are the sole responsibility of the author This project is funded and can in no way be taken to reflect the views of the European Union . by the European Union
  2. 2. 1.  The Council of Arab Electricity Ministers of the League of Arab States has adapted the Arab EE Guideline during their 26th Executive Office meeting that took place in Cairo on 23 November 2010.2.  This Guideline is based on the EU directive 2006/32/EC on energy end-use efficiency and energy service known as Service Directive .3.  It is a 10 year framework program that requires: ¡  setting of long term/short term indicative energy efficiency targets ¡  and the preparation and implementation of National Energy Efficiency Action Plans (NEEAPs). This project is funded by the European Union
  3. 3. 4.  The process of translation, adaptation and adoption of the EU directive into the Arab EE Guideline took two years.5.  This Guideline was circulated to the Ministers for National adoption according to Article 13 of the Guideline.6.  Article XII of the guideline states that: ¡  the RE/EE Expert committee set up in accordance with the decision of the Council of Arab Ministerial Council for Electricity No. 127, ¡  and the committees work groups shall be responsible for monitoring the implementation of this guideline in coordination with regional and international institutions and specialized research centers. This project is funded by the European Union
  4. 4. 7. The LAS EE Working Group during its 2nd meeting that took place inKhartoum on 23 November 2011 included the following resolution:a) Request the Technical Secretariat (Energy Department) of the Council ofMinisters to coordinate with RCREEE and MED-ENEC to conduct a study onthe availability of training and certification of energy managers and energyservice providers and to propose a relevant regional program to be circulatedto the members of the EE Working Group in order to have it finalized andpresented for approval during their next planned meeting during the 2nd halfof 2012.b) Organize a workshop to present the available experiences relating tonational programs for the certification of energy managers and auditors for thepurpose of supporting the study mentioned above.c) The above mentioned workshop is to be organized during the 1st half of 2012and to have the study finalized by end of June 2012. This project is funded by the European Union
  5. 5. 1. Conducts an energy audit against a fixed fee. Delivers a report withrecommendations and pulls out.2. As in case 1. In addition implementing no cost/low cost measures if are available3. As in case 1 conducts an energy audit and details recommendations by aninvestment grade report (IGR) that may also include engineering design4. As in case 3 an energy audit and prepares an IGR. In addition SP assists inestablishing an improved data collection, recording and analysis system.5.Vendor ESCO, selling, leasing or even operating their own high energy efficiencyequipment.6. As in case 5, but the performance contract has a clause about guaranteed savings.7. Complete engineering design for recommendations and invests under aperformance contract.8. Contract for delivery of energy based on a true ESCO model. This project is funded by the European Union
  6. 6. To conduct a study on the availability of trainingand certification of energy managers and energyservice providers and to propose a relevantregional program including a delivery mechanism. This project is funded by the European Union
  7. 7. ü  To improve the awareness of the Arab EE Guideline and its different articlesü  To give the participants a feel of certain pre-requirements that needs to be in place once a country decides to implement measures relating to energy managers, energy audits and energy efficiency performance contracting.ü  To present the available experiences relating to national programs for the certification of energy managers and auditors for the purpose of supporting the study.ü  To finalize TOR for the MED-ENEC study This project is funded by the European Union
  8. 8. Article I: Purpose(B)Creating the appropriate conditions for the development and promotionof a market for energy services in addition to the delivery of other necessarymeasures to improve energy efficiency to end-users.Article II: Scope of work:Ø  providers of services to improve energy efficiency,Ø  energy suppliers, energy distribution systems operators, energy selling companies,Ø  and energy end-users, This project is funded by the European Union 8
  9. 9. v  Annex B provides samples for eligible measures for the different sectors such as:v  Energy auditsv  Energy engineersv  Energy Performance contracting This project is funded by the European Union
  10. 10. It requires each government to make sure that the public sector:v  is under this Guideline. Sample measures are listed in annex Bv  select two mandatory measures from a list in Annex C, requiring energy-efficient public procurement, energy audits, energy performance contracting,…. This project is funded by the European Union
  11. 11. v  do one or more of the following: 1.  Offer competitively priced energy services to customers 2.  Offer their customers competitively priced energy audits, and/or energy efficiency improvements 3.  Make equivalent finance to delivering the above available to fund energy audits This project is funded by the European Union
  12. 12. Governments to ensure the availability of appropriate qualifications, accreditation and certification schemes for the:v  providers of energy services,v  energy auditsv  and energy efficiency improvement schemes. This project is funded by the European Union
  13. 13. Governments to make available the required financial resources to support and implements it energy efficiency programs and other measures for promoting energy efficiency as well as improving the market for energy efficiency services (i.e. energy efficiency subsidy funds) Governments to ensure the availability of efficient, high-quality energy audit schemes that can be carried out in an independent manner by ESCOs and Distribution Co. These should identify energy efficiency improvement measuresThis project is fundedby the European Union
  14. 14. Qualification and certification schemes are neededto regulate the market and protect consumers.It becomes a must to insure transparency andprevent misuse especially when:Ø  public money is used as incentiveØ  or in fulfillment of a legal obligation. This project is funded by the European Union
  15. 15. ü  Job Description: Ø  Energy Data Collection and Analysis Ø  Energy Purchasing Supervision Ø  Energy Conservation Project Evaluation Ø  Energy Project Implementation Ø  Communications and Public Relations Ø  Reportingü  Qualification: Ø  Education Ø  Specialization Ø  Experience Ø  Trainingü  Certification This project is funded by the European Union 15
  16. 16. This project is fundedby the European Union 16
  17. 17. This project is fundedby the European Union 17
  18. 18. ü  Sector Specificü  Access to instrumentsü  Qualificationü  Certificationü  Contract contents (template)ü  Energy Audit report content (template) This project is funded by the European Union 18
  19. 19. This project is fundedby the European Union 19
  20. 20. ü  Qualificationsü  Access to instrumentsü  Access to EE equipment & Suppliersü  Access to Financingü  Contracts (template)ü  Monitoring & verification protocolsü  Certification This project is funded by the European Union 20
  21. 21. This project is fundedby the European Union 21
  22. 22. This project is fundedby the European Union
  23. 23. This project is fundedby the European Union
  24. 24. Thank Youwww.med-enec.com This project is funded by the European Union

×