Article 1:                                   Scope              Article 8:                            Article 2:          ...
Annual Progress Report    National Renewable Energy       Action Plan (NREAP)        Arab Renewable Energy          Framew...
•When to use SHALL“Shall….”   •When to use MAY            •“Communicate….”“May….”     •“Report to…..”             Albrecht...
Article 1:ScopeContent       •   Common framework to promote renewable energy              •   National targets to be form...
Article 2:NREAPContent      •   Prepare national renewable energy action plan (NREAP)             •   Positive and negativ...
Article 3: JointProjects Content      •   Joint projects implementation among LAS members              •   Third country p...
Article 4:  Admin.Procedures              •   Administrative nondiscrimination of NREAP measures Content      •   Technica...
Article 5: Information   TrainingContent           •   Provide relevant information to all market actors                  ...
Article 6:   Grid  Access                •   National and cross-border grid infrastructure                •   Priority acc...
Article 7:Information  Platform               •   Establishment of an information platform               •   Increase, fac...
Article 8:Reporting Content      •   First annual progress report              •   Structure and budget of national suppor...
THANK YOU  albrecht.kaupp@giz.de                          12
Upcoming SlideShare
Loading in …5
×

Arab Renewable Framework (AREF) and relevant European Experiences

756 views
629 views

Published on

Arab Renewable Energy Framework, March 11, 2013

1 Comment
1 Like
Statistics
Notes
No Downloads
Views
Total views
756
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
0
Comments
1
Likes
1
Embeds 0
No embeds

No notes for slide

Arab Renewable Framework (AREF) and relevant European Experiences

  1. 1. Article 1: Scope Article 8: Article 2: Information NREAP Platform Article 7: AREF Article 3: JointReporting Arab Renewable Energy Projects Framework Article 6: Article 4: Grid Admin. Access Procedures Article 5: Training Albrecht Kaupp 1
  2. 2. Annual Progress Report National Renewable Energy Action Plan (NREAP) Arab Renewable Energy Framework (AREF) Arab Renewable Energy StrategyAlbrecht Kaupp 2
  3. 3. •When to use SHALL“Shall….” •When to use MAY •“Communicate….”“May….” •“Report to…..” Albrecht Kaupp 3
  4. 4. Article 1:ScopeContent • Common framework to promote renewable energy • National targets to be formulated • Rules for reporting and information exchange • Joint project implementation • Which Infrastructure and format of reporting ?Issues • Who is preparing the rules ? • Who is recommending the rules? • Transport is not included Albrecht Kaupp 4
  5. 5. Article 2:NREAPContent • Prepare national renewable energy action plan (NREAP) • Positive and negative effect of policy measures • Annual progress report of implemented activities • Reflect on existing barriers to implement NREAPIssues • How doe we define joint projects ? • Cooperation between local and national authorities ? • Data gaps and project performance data authentication ? • Trajectory adjustment complications Albrecht Kaupp 5
  6. 6. Article 3: JointProjects Content • Joint projects implementation among LAS members • Third country project implementation • Reporting procedures on joint project implementation • Information withdrawal procedures and corrections • Disclosure of non-confidential information Issues • International dimension of reporting • Private sector (investor) interest protection • Disclosure/transparency of commercial project data Albrecht Kaupp 6
  7. 7. Article 4: Admin.Procedures • Administrative nondiscrimination of NREAP measures Content • Technical specification of RE technologies • Involvement of local and regional bodies • Building regulations and Government leading by example • Apply guidelines and methodologies of NREAP Issues • Enforcement of codes and standards • Adaptation of codes and standards to local conditions • National content issues and its cost effectiveness • Resistance to simplification of authorization procedures Albrecht Kaupp 7
  8. 8. Article 5: Information TrainingContent • Provide relevant information to all market actors • Labeling and specification for EE and RE equipment • Training and guidance for installers and service provider • Suitable public awareness raising campaigns • Certification schemes for equipment and services • Control and certification of equipment installersIssues • Control and enforcement of manufacturing standards • Testing of RE products form the market • Enforcement of the associated regulatory framework Albrecht Kaupp 8
  9. 9. Article 6: Grid Access • National and cross-border grid infrastructure • Priority access for electricity from renewable resourcesContent • Non-discriminatory access at all LV to HV voltage levels • Transmission/distribution charges within limits • Assess necessity to build new grid infrastructure for RE • Precise time table for sanctioning of grid connectionIssues • Additional load balancing efforts due to RE electricity • Excessive wheeling charges to keep RE electricity out • Priority access a problem for utilities on some days a year • Lack of grid codes and transparency deficits Albrecht Kaupp 9
  10. 10. Article 7:Information Platform • Establishment of an information platform • Increase, facilitate and promote cooperation Content • Publish NREAP, joint projects, national annual report • New rules and regulations availability and explained • Forecast documents and trajectories • Platform host, costs for maintenance and updating • Owner and responsibility for content Issues • Non-disclosures requested by States • Commercially sensitive information • Achievements and failure reporting ? Albrecht Kaupp 10
  11. 11. Article 8:Reporting Content • First annual progress report • Structure and budget of national support scheme • Delivery mechanism of support schemes • New rules and regulations • Effectiveness of existing rules and regulations • Involvement of contributing entities to the report • Correction of submitted data of previous reports Issues • Innovative, but complex online reporting ? • Progress and fine tuning of data collection and analysis • Appraise necessity to build new grid infrastructure for RE Albrecht Kaupp 11
  12. 12. THANK YOU albrecht.kaupp@giz.de 12

×