• Save
FXBI Wetland Ppt
Upcoming SlideShare
Loading in...5
×
 

FXBI Wetland Ppt

on

  • 12,402 views

Constructed stormwater wetland at F. X. Browne, Inc. headquarters in Lansdale, PA. http://www.fxbrowne.com

Constructed stormwater wetland at F. X. Browne, Inc. headquarters in Lansdale, PA. http://www.fxbrowne.com

Statistics

Views

Total Views
12,402
Views on SlideShare
4,783
Embed Views
7,619

Actions

Likes
3
Downloads
0
Comments
1

9 Embeds 7,619

http://www.fxbrowne.com 6775
http://fxbrowne.com 799
http://fxbrowneinc.com 22
http://www.fxbrowneinc.com 12
http://www.slideshare.net 6
http://sbs.fxbrowne.com 2
file:// 1
http://74.125.39.132 1
http://www.fxbrowne.com. 1
More...

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

CC Attribution-NoDerivs LicenseCC Attribution-NoDerivs License

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
  • Nice work
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

FXBI Wetland Ppt FXBI Wetland Ppt Presentation Transcript

  • Using Constructed Wetlands to Filter Parking Lot Stormwater Runoff Designed by F. X. Browne, Inc. Funded by the Partnership for the Delaware Estuary
  • F. X. Browne, Inc. Constructed Stormwater Wetland Project
    • Location : 1101 South Broad Street, Lansdale, PA
    • Cost : $5,000 grant from the Partnership for the Delaware Estuary, $3,000 in-kind services from F. X. Browne, Inc.
    • Construction time : Less than two weeks
    • Wetland Design : Native plantings, reconstructed channel designed to slow stormwater flows, wetland vegetation to filter out stormwater pollutants.
  • Before Construction – Original Stormwater Detention Basin
  • Construction Begins
  • Wetland flow path is re-graded to slow stormwater, improving filtration Wetland soil is added to support plantings
  • New Wetland After Planting
  • One Month After Installation
  • Ten Months After Installation (Spring)
  • One Year After Installation
  • Completed Wetland
  • Parking lot runoff