Team3-Final group presentation 12 - Presentation Transcript
ITE Group Project Team #3 Team Leader: Benjamin Genda Presenter: Rebecca Hammond Graphics Designer: John McCloskey Software Designer: Amie Cave
Description
New Computer System for Fitness Center
Objective
Hardware Requirements
Software Requirements
Personnel Requirements
Staff Duties
Daily Tasks for Staff
Training Requirements
Maintenance Requirements
Summary
Objectives
Develop New Computer System for the Fitness Center
Includes 5 Fitness Centers
650 Members
30 Full-time and part-time employees
Number of Centers
Computers needed for (5) Fitness Centers
Objectives (cont)
Requirements for Members and Fitness Consultants
Use the system to keep track of participation for:
Free weights
Volleyball
Swimming
Stair Climbing
Aerobics classes
System must also:
Be able to keep track of full-time and part-time employees work hours
Hardware Involved
Four Desktops per Fitness Center
$408 each totaling $1,632 per Center
Three for every 215 members; one for every 30 employees
Type- Vostro 220 Mini Tower
3g memory
Monitor Size- 20”
Networking Server
All Desktops connected to Network
PowerEdge T310
Reduce downtime with hot swap hard drives and redundant power supplies
$949 per Fitness Center
Wireless Router
Provides Internet fast and reliable internet
Cost- $100; one per center
Total Hardware Cost Per Center
$2,681 per Center; $13,405 for all five Fitness Centers
Hardware Images Vostro 220 Mini Tower with Monitor
PowerEdge T310 Server
Wireless Internet Router
Software Involved
Operating System for each computer
Windows XP Professional
Operating system designed for businesses of all sizes
Cost $1000 per fitness center
Software license $50 per license
Operating System for the server
Windows 2003, Release 2
$850.33
Software Involved
Wireless Networking Software
Windows Wireless Utility
Built into the operating system
Application Software
Microsoft Access with database
Built into the operating system
You can create a user front end to enter the data to track employees and do a share point portal
Staff Duties
Enrolling members
Collecting membership fees
Giving Tours
Signing new members up
Organizing
Calculating income and outcome
Organizing member’s schedules
Adding new member’s schedules
Updating Schedules
Posting daily activities
Daily Tasks for Staff
Assisting members
Exercise program
Showing them their exercise progression
Diet program
Safety
Assistance of elderly and handicapped
Daily signing in
General upkeep
Janitorial duties
Electrical and computer maintenance
Supplies
Personnel Requirements
Most personnel do not need prior experience to obtain a job at our location
Physical trainers are preferred to have prior experience or
Taken a minimum of one class toward physical training degree
Or can submit contact information for a previous physical training job
Training Requirements
One software hardware trainer
Will train employees from all 5 location
New Employees
Will receive paid training along side a current employee for 2 days (2 to 3) hours training time
Current Employees
Evaluations every 2 weeks during the first 2 months, then monthly until their 6 month. Then evaluations will remain every 3 months.
Evaluations will be performed by manager or an individual chosen by the manager
Whenever software is updated a meeting will be held to show and inform all employees of these changes; a training day will be scheduled as well
Maintenance Requirements
There will be one roving IT professional employee to render IT support to all 5 locations
Acceptable downtime should not exceed 2 hours
Position may become a part-time, on call position if shown that down time is substantial
Certain employees will be trained to deal with smaller issues with the system, in case hired IT professional cannot make it right away, or cannot be reached
0 comments