Bio-Climatic Skyscraper, Gurgaon

  1. 1. Gurgaon Sun Study of West Facade June, 7:00 Am June, 8:00 Am June, 9:00 Am June,10:00 Am June,11:00 Am June,12:00Pm June,1:00 Pm June,2:00 Pm June,3:00 Pm June,4:00 Pm June,5:00 Pm June,6:00 Pm June, 8:00 Am June, 9:00 Am June,10:00 Am June,11:00 Am June,12:00Pm June,1:00 Pm June,2:00 Pm June,3:00 Pm June,4:00 Pm June,5:00 Pm June,6:00 Pm Manesar, June, 6:00 Am At Sun Study of North Facade June, 6:00 Am June, 7:00 Am Bio- Climatic Tower Sun Study of South Facade Sun Study of East Facade School Of Architecture And Landscape Design IIIII Shri Mata Vaishno Devi Univerity IIIII Kumar Raushan 2006 eal 30 Thesis Guide: Ar. Arshia Khajooria Sem-x
  2. 2. Gurgaon › Form Development Manesar, Basic Form Evolution sketches conceptual : › KUMAR RAUSHAN 2006 EAL 30 Sun-Study of Leaning Form › 4th Stage 3rd Stage Study of Green Ramp Around the Form Development of Pre-Cambered Core andDia-Grid to Handle Overhang Load School Of Architecture And Landscape Design Bio- Climatic Final Form Development At 2nd Stage Tower 1st Stage Core Formulation, Sky Courts and Floor Plates Development IIIII Shri Mata Vaishno Devi Univerity IIIII Kumar Raushan 2006 eal 30 Thesis Guide: Ar. Arshia Khajooria Sem-x
  3. 3. Gurgaon Location: seamless connectivity to CBD Delhi, International airport and CBD Gurgaon. & location N › › AGRICUTURAL LAND DHANA VILLAGE site › SATELLITE IMAGE OF IMT MANESAR 228000 Building Orentation 167330 & location KUMAR RAUSHAN 2006 EAL 30 BASKUSHLA VILLAGE Manesar, site SECTOR 8 INSTITUTIONAL AREA CP4 - PLOT NO. 8 N 228000 KUMAR RAUSHAN 2006 EAL 30 PLOT DIMENSIONS › 16 M WIDE ROAD Key Plan in design & based on multi-dimensional product excellence. It emphasizes on an eco-positive and environment sensitive approach such as taking advantages of renewable resources e.g., using sunlight, plants and trees through green roofs and vertical gardens for reduction of rainwater run-off, using materials from local sources, reducing loads, optimizing energy utilization. Need of tall building in city, pressure and opportunity for change in services of tall buildings. A synergistic integration of work places with business, social & cultural interaction zones. Ideal for the generation that spends 12 M WIDE ROAD SITE:- Manesar, Gurgaon (6.2 Acers) Location: seamless connectivity to CBD Delhi, International airport and CBD Gurgaon. PLAZA • Rated amongst India’s top 6 high-growth destinations. • A 1750 acre ultra-modern integrated industrial Park • Shopping arcades, health centres, golf course & Plan for 3/5 star hotel & a 100 bed hospital too integrating community are therefore infrastructure derived and within reinvented suburban business districts. by facilities SERVICE PARKING TOWER club, A mixed use project creates a critical mass of activity and • Favourite with investors from Japan, France and UK, who reason for users to stay longer and explore the place. Creation of a mix-use district with institutional, commercial, have set up about 450 Industrial Units here recreational & residential combined that lends itself to • 2 notified SEZs of approximately 330 acres coming up public functions of a recro-commercialnature. advantages LOADING DOCK • Hi-Tec Telecommunication Facilities,220kw substation, Independent water supply and sewerage disposal system 2/3rd of the day at work or transitioning to and fro from • Focus on growth: 47 MN sq. ft. office space coming up in work. N.C.R., over 21 MN in Manesar alone Significant PARKING BASEMENT 1 ENTRY RAMP 12 M WIDE ROAD Bio- Climatic philosophy BASEMENT EXIT RAMP 152 M innovation 2 12 M WIDE ROAD is a SERVICE ENTRY The Site The Project Green SECOND ENTRY EXIT At Location Plan DROP-OFF GUARD CABIN ENTRY • A residential area spread over 900 acres is coming up here for the employees of MNCs and HSIDC 16 M WIDE ROAD 223 M Site Plan School Of Architecture And Landscape Design IIIII Tower • Rated amongst India’s top 6 high-growth destinations. • A 1750 acre ultra-modern integrated industrial Park • Hi-Tec Telecommunication Facilities,220kw substation, Independent water supply and sewerage disposal system • Shopping arcades, health centres, golf course & club, Plan for 3/5 star hotel & a 100 bed hospital too • Focus on growth: 47 MN sq. ft. office space coming up in N.C.R., over 21 MN in Manesar alone • Home to global giants- Honda, Mitsubishi, MUL, Frigo Glass, Samsung etc. • Favourite with investors from Japan, France and UK, who have set up about 450 Industrial Units here • 2 notified SEZs of approximately 330 acres coming up • A residential area spread over 900 acres is coming up here for the employees of MNCs and HSIDC 167330 › › SITE:- Manesar, Gurgaon (6.2 Acers) Shri Mata Vaishno Devi Univerity IIIII Sc:1:500 Kumar Raushan 2006 eal 30 Thesis Guide: Ar. Arshia Khajooria Sem-x
  4. 4. S-02 Gurgaon S-01 S-03 RAMP UP entrance SERVICES STAIR PRES. DUCT STAIRS 2 22 5 6 21 20 19 18 7 DRY STORE 17 8 16 9 15 10 14 11 13 LOCAL LIFT LIFT LOBBY 4.5 M WIDE LOCAL LIFT 10 15 9 16 17 6 20 GENTS TOILET WASH AREA 21 5 4 3 2 22 SERVICE LOBBY 18 SQM 1 23 STAIRS LADIES TOILET STAIR PRES. DUCT KITCHEN 100 SQM PANTRY WAITER STATION DRY STORE SERVICE LIFT 7 18 19 P.H. TOILET SERVICES 8 24 x 150 = 3,600 11 14 12 13 SERVICE ENTRY WASH AREA KITCHEN 100 SQM SERVICE ENTRY RECEPTION PANTRY WAITER STATION RECEPTION STALL 1 S-04 STALL 3 SPACE FOR STALLS RESTAURANT 1 145 SQM S-04 RESTAURANT 2 145 SQM STALL 2 STALL 4 RESTAURANT GENTS TOILET Manesar, 4 57800 3 A.H.U. 20 SQM COLD STORE HI-SPEED LIFT 23 24 x 150 = 3,600 1 12 COLD STORE View of South Facade LADIES TOILET ATRIUM S-01 S-02 S-03 FOOD COURT entrance SERVICES STAIR PRES. DUCT STAIRS S-03 22 3 4 5 6 21 20 19 18 7 A.H.U. 20 SQM STORE 30 SQM HI-SPEED LIFT 23 2 24 x 150 = 3,600 1 17 8 16 9 15 10 14 11 13 LOCAL LIFT LIFT LOBBY 4.5 M WIDE LOCAL LIFT 13 10 9 6 20 GENTS TOILET SERVICE LIFT 7 19 P.H. TOILET SERVICES 8 17 12 15 16 18 SECOND FLOOR PLAN 2 Floor Plan 21 5 4 2 1 SERVICE LOBBY 18 SQM STAIRS LADIES TOILET STAIR PRES. DUCT Sc:1:250 PANTRY 12 LUNCH ROOM 11 15 8 17 6 SERVER ROOM 16 7 18 5 4 3 24 x 150 = 3,600 14 9 SUPER MARKET 325 SQM RECORD ROOM 13 10 SPACE FOR STALLS 20 21 2 BANK 325 SQM 22 1 23 SECURITY 24 x 150 = 3,600 4 5 6 RETAIL 17 40 SQM RETAIL 16 36 SQM 20 19 18 16 9 15 10 14 11 13 12 17 8 LIFT LOBBY 4.5 M WIDE LOCAL LIFT LOCAL LIFT 10 15 9 16 P.H. TOILET SERVICES SERVICE LIFT 7 6 21 4 3 SERVICE LOBBY 18 SQM 1 23 STAIRS STAIR PRES. DUCT 12 14 9 S-04 13 10 18 5 4 SUPER MARKET 325 SQM 3 24 x 150 = 3,600 17 6 RETAIL 14 45 SQM S-04 16 7 RETAIL 13 45 SQM TOI. 15 8 RETAIL 12 45 SQM PANTRY LOCKERS CASH COUNTER 11 SERVICE ENTRY 10 x 60 = 600 VAULT 13 x 300 = 3,600 RETAIL 15 40 SQM RETAIL 11 40 SQM 5 2 22 LADIES TOILET STORE 30 SQM 8 17 24 x 150 = 3,600 11 14 12 13 20 54000 19 20 21 2 S-01 BANK 325 SQM 22 1 23 58000 SPACE FOR STALLS SECURITY SECURITY LOBBY CASH COUNTERS S-02 S-03 1st Floor Plan Sc:1:250 MANAGER'S CABIN HELP DESK STORE RECORD UP UP ATRIUM RETAIL 1 40 SQM TOI. RETAIL 8 40 SQM RECEPTION RETAIL 2 36 SQM Bio- Climatic TOI. ATRIUM RETAIL 10 36 SQM 19 MANAGER'S CABIN STORE HI-SPEED LIFT 18 GENTS TOILET LOAN DEPART. 21 7 STORE 30 SQM PERSONAL DEPART. 22 3 A.H.U. 20 SQM CASH COUNTERS RETAIL 9 40 SQM 23 2 RAMP UP Tower TOI. STAIR PRES. DUCT 1 CARD'S DEPARTMENT = 600 = 600 10 x 60 10 x 60 entrance ENTRANCE FOYER STAIRS LOBBY MEETING ROOM S-03 MANAGER'S CABIN SERVICES S-04 19 ENTRANCE S-02 At 13 x 300 = 3,600 S-04 S-01 RECREATIONAL AREA 3 22 23 58000 nd 11 14 24 x 150 = 3,600 S-02 12 54000 S-01 RETAIL 7 36 SQM RETAIL 3 40 SQM = 600 10 x 60 10 x 60 RETAIL 4 45 SQM = 600 RETAIL 6 40 SQM RETAIL 5 45 SQM RAMP UP 54000 S-01 S-02 S-03 ENTRANCE GROUND FLOOR PLAN Ground Floor Plan Sc:1:250 View of Central Atrium School Of Architecture And Landscape Design IIIII Section-01 Shri Mata Vaishno Devi Univerity IIIII Sc:1:250 Kumar Raushan 2006 eal 30 Thesis Guide: Ar. Arshia Khajooria Sem-x
  5. 5. S-02 Gurgaon S-01 S-03 entrance OFFICE 3 335 SQM RECEPTION SERVICES STAIR PRES. DUCT STAIRS 22 4 5 6 21 20 19 18 17 16 9 15 10 14 11 13 12 7 8 LOCAL LIFT LIFT LOBBY 4.5 M WIDE LOCAL LIFT 9 16 17 7 18 6 19 20 P.H. TOILET GENTS TOILET SERVICE LIFT 8 24 x 150 = 3,600 10 15 SERVICES 11 14 12 13 21 5 4 3 2 22 SERVICE LOBBY 18 SQM 1 23 STAIRS LADIES TOILET STAIR PRES. DUCT COMMON LOBBY 100 SQM S-04 RAMP UP S-04 OFFICE 1 400 SQM RECEPTION Manesar, OFFICE 2 400 SQM 55600 3 A.H.U. 20 SQM HI-SPEED LIFT 23 2 24 x 150 = 3,600 1 RECEPTION View of Atrium BALCONY BALCONY ATRIUM BELOW S-01 S-02 S-03 entrance OFFICE 3 300 SQM RECEPTION SERVICES STAIR PRES. DUCT STAIRS 22 3 4 5 6 21 20 19 18 54,000 17 8 16 9 15 10 14 11 13 12 7 A.H.U. 20 SQM HI-SPEED LIFT 23 2 24 x 150 = 3,600 1 LOCAL LIFT LIFT LOBBY 4.5 M WIDE LOCAL LIFT 13 11 9 17 6 19 20 S-03 GENTS TOILET P.H. TOILET 3 STAIRS STAIR PRES. DUCT 5th Floor Plan SERVICE LOBBY 18 SQM Sc:1:250 COMMON LOBBY 100 SQM S-04 OFFICE 2 400 SQM RECEPTION S-04 OFFICE 1 400 SQM RECEPTION S-03 BALCONY BALCONY Tower S-02 4 1 23 LADIES TOILET S-01 5 2 22 At S-02 21 56300 S-01 SERVICE LIFT 7 18 SERVICES 8 24 x 150 = 3,600 10 16 12 14 15 ATRIUM entrance GALLERY 260 SQM STORE STAIR PRES. DUCT STAIRS 22 3 4 5 6 21 20 18 17 8 16 9 15 10 14 11 13 LOCAL LIFT LIFT LOBBY 4.5 M WIDE LOCAL LIFT 13 11 14 10 15 9 SERVICES SERVICE LIFT 7 6 24 x 150 = 3,600 8 18 12 16 17 19 20 P.H. TOILET GENTS TOILET 21 5 4 3 2 22 SERVICE LOBBY 18 SQM 1 23 STAIRS LADIES TOILET STAIR PRES. DUCT 54,000 S-01 CONFERENCE 2 80 SQM CONFERENCE 1 80 SQM FOYER STORE S-04 AUDI 2 140 SQM STORE 56800 COMMON LOBBY 100 SQM FOYER RAMP UP S-04 AUDI 1 140 SQM RAMP UP 19 7 A.H.U. 20 SQM STORE 20 SQM HI-SPEED LIFT 23 2 24 x 150 = 3,600 1 12 STORE 20 SQM S-02 S-03 4th Floor Plan Sc:1:250 LOUNGE LOUNGE VIP LOUNGE Bio- Climatic SERVICES VIP LOUNGE STAGE STAGE GENTS TOILET LADIES TOILET ATRIUM 54000 S-01 S-02 S-03 3rd Floor Plan Sc:1:250 View of Atrium Top School Of Architecture And Landscape Design IIIII Section-03 Shri Mata Vaishno Devi Univerity IIIII Sc:1:250 Kumar Raushan 2006 eal 30 Thesis Guide: Ar. Arshia Khajooria Sem-x
  6. 6. S-02 Gurgaon S-01 S-03 entrance OFFICE 3 446 SQM RECEPTION SERVICES STAIR PRES. DUCT STAIRS 22 3 4 5 6 21 20 19 18 17 8 16 9 15 10 14 11 13 12 7 A.H.U. 20 SQM HI-SPEED LIFT 23 2 24 x 150 = 3,600 1 LOCAL LIFT LIFT LOBBY 4.5 M WIDE LOCAL LIFT 13 11 9 17 6 19 20 GENTS TOILET P.H. TOILET 21 5 4 3 2 22 SERVICE LOBBY 18 SQM 1 23 STAIRS LADIES TOILET SERVICE LIFT 7 18 SERVICES 8 24 x 150 = 3,600 10 16 12 14 15 53000 STAIR PRES. DUCT COMMON LOBBY 100 SQM OFFICE 2 425 SQM S-04 OFFICE 1 425 SQM RECEPTION Manesar, S-04 RECEPTION View of Front Facade ATRIUM S-01 S-02 S-03 RAMP UP entrance OFFICE 3 415 SQM RECEPTION SERVICES STAIR PRES. DUCT STAIRS 22 3 4 5 6 21 20 19 18 7 A.H.U. 20 SQM HI-SPEED LIFT 23 2 S-03 17 8 16 9 15 10 14 11 13 LOCAL LIFT LIFT LOBBY 4.5 M WIDE LOCAL LIFT 10 17 7 6 19 20 GENTS TOILET 21 4 3 1 23 STAIRS STAIR PRES. DUCT RAMP UP Sc:1:250 COMMON LOBBY 100 SQM S-04 S-04 OFFICE 2 430 SQM S-01 S-02 SERVICE LOBBY 18 SQM 53600 8th Floor Plan 5 2 22 LADIES TOILET SERVICE LIFT 8 18 P.H. TOILET SERVICES 9 16 24 x 150 = 3,600 11 14 15 12 13 At S-02 24 x 150 = 3,600 1 S-01 12 54000 OFFICE 1 430 SQM RECEPTION S-03 RECEPTION entrance Tower RAMP UP ATRIUM OFFICE 3 375 SQM RECEPTION SERVICES STAIR PRES. DUCT STAIRS 22 4 5 6 21 20 19 18 17 8 16 9 15 10 14 11 13 12 7 LOCAL LIFT LIFT LOBBY 4.5 M WIDE LOCAL LIFT 13 11 14 10 15 9 24 x 150 = 3,600 6 20 GENTS TOILET 21 5 4 3 2 22 1 23 STAIRS LADIES TOILET SERVICE LIFT 7 19 P.H. TOILET SERVICES 8 18 12 16 17 STAIR PRES. DUCT SERVICE LOBBY 18 SQM 54000 54800 S-01 COMMON LOBBY 100 SQM S-04 OFFICE 2 400 SQM RECEPTION S-04 OFFICE 1 400 SQM S-03 7th Floor Plan Sc:1:250 SEVENTH FLOOR PLAN RECEPTION BALCONY S-02 Bio- Climatic 3 A.H.U. 20 SQM HI-SPEED LIFT 23 2 24 x 150 = 3,600 1 BALCONY RETAIL ATRIUM BELOW 54,000 S-01 S-02 S-03 6th Floor Plan Sc:1:250 View of Front Facade School Of Architecture And Landscape Design IIIII Section-04 Shri Mata Vaishno Devi Univerity IIIII Sc:1:250 Kumar Raushan 2006 eal 30 Thesis Guide: Ar. Arshia Khajooria Sem-x
  7. 7. S-03 20 S-02 Gurgaon S-01 OBSERVATION DECK SOLAR POWER EMERGENCY POWER ANTENNA CONTROL ROOM SERVICE AREA 1 160 SQM MECHANICAL ATRIUM BELOW SERVICE AREA 2 160 SQM 41600 ELECTRICAL TERRACE GARDEN HI-SPEED LIFT LOBBY STAIR PRES. DUCT STAIRS 20 19 18 16 15 14 13 13 7 6 20 21 4 3 SERVICE LOBBY SERVICE 18 SQM LOBBY 1 23 SERVICES 5 2 22 STAIRS STAIR PRES. DUCT Detail View SKY COURT DOUBLE HEIGHT S-01 S-04 S-03 SKY COURT DOUBLE HEIGHT 390 SQM SOLAR POWER 40 SQM EMERGENCY POWER 25 SQM WATER TANK Sun-Shades S-02 S-04 LOW VOLTAGE of WATER TANK HI-SPEED LIFT LOBBY SERVICE AREA 1 230 SQM STAIR PRES. DUCT 2 STAIRS 3 HI-SPEED LIFT 1 2 3 22 21 20 19 18 16 15 10 14 13 LOCAL LIFT LIFT LOBBY 4.5 M WIDE 13 9 12 17 8 LOCAL LIFT 13 11 14 10 8 7 6 9 10 11 12 13 14 18 6 15 16 17 18 19 20 21 TOILET 30th Floor Plan 5 4 3 2 22 1 23 SERVICES SERVICE LIFT 9 17 12 15 16 24 x 150 = 3,600 5 8 11 SERVICES 7 12 4 7 6 10 5 9 4 8 3 MECHANICAL 7 2 24 x 150 = 3,600 23 6 1 SERVICES SERVICE AREA 2 230 SQM 1 MIDIUM VOLTAGE Manesar, 19 TOILET SERVICE LIFT 8 24 x 150 = 3,600 9 17 12 10 16 18 GENTS TOILET SERVICES 11 14 15 STAIRS STAIR PRES. DUCT SERVICE LOBBY Sc:1:250 At LOCAL LIFT 46000 LIFT LOBBY 4.5 M WIDE 18 LOCAL LIFT 17 11 16 10 15 9 12 17 8 14 7 11 6 21 5 4 5 WATER TANK HI-SPEED LIFT 22 3 SERVICES HI-SPEED LIFT 23 2 24 x 150 = 3,600 1 SERVICES 4 WATER TANK 54000 S-02 S-03 S-04 S-04 SKY COURT DOUBLE HEIGHT 380 SQM 20 S-01 S-01 S-02 S-03 Tower SKY COURT DOUBLE HEIGHT 300 SQM STAFF LOUNGE 45 SQM FIRE FIGHTING 45 SQM STAIR PRES. DUCT STAIRS 22 3 4 5 6 21 20 19 18 17 8 16 9 15 10 14 11 13 12 7 SERVICES HI-SPEED LIFT 23 2 24 x 150 = 3,600 1 SERVICES WATER TANK LOCAL LIFT LIFT LOBBY 4.5 M WIDE LOCAL LIFT 13 10 15 9 8 7 6 24 x 150 = 3,600 12 16 17 18 19 20 21 SERVICES 5 4 3 2 22 1 23 TOILET SERVICE LIFT 11 14 SERVICE LOBBY STAIRS STAIR PRES. DUCT 53900 LOW VOLTAGE 54000 3 2 1 4 9 7 8 6 5 11 10 13 14 15 16 17 18 19 20 21 22 23 S-01 24 x 150 = 3,600 10 11 9 7 8 6 5 4 3 2 23 22 21 19 20 18 17 15 16 COMMON LOBBY 100 SQM 14 1 24 x 150 = 3,600 13 SERVICE AREA 1 375 SQM 12 12 S-04 SERVICE AREA 2 375 SQM S-04 S-02 S-03 20th Floor Plan Sc:1:250 MECHANICAL MIDIUM VOLTAGE Bio- Climatic WATER TANK RETAIL SKY COURT DOUBLE HEIGHT 400 SQM 54,000 S-01 S-02 S-03 10th Floor Plan Sc:1:250 Side View of the Tower School Of Architecture And Landscape Design IIIII Section-02 Shri Mata Vaishno Devi Univerity IIIII Sc:1:250 Kumar Raushan 2006 eal 30 Thesis Guide: Ar. Arshia Khajooria Sem-x
  8. 8. BATH ROOM S-02 S-03 BEDROOM BEDROOM LIVING/DINING DRESSING DRESSING BATH ROOM BATH ROOM BEDROOM LIVING/DINING DRESSING Gurgaon S-01 KITCHEN KITCHEN DRESSING BATH ROOM KITCHEN BEDROOM KITCHEN LIVING/DINING LIVING/DINING LIVING/DINING LIVING/DINING KITCHEN KITCHEN STAIR PRES. DUCT STAIRS 4 5 6 21 19 18 17 8 16 9 15 10 14 11 13 LOCAL LIFT LIFT LOBBY 4.5 M WIDE LOCAL LIFT 13 11 9 17 6 20 GENTS TOILET 21 5 4 3 2 22 1 23 STAIRS LADIES TOILET DRESSING SERVICE LIFT 7 19 P.H. TOILET SERVICES 8 24 x 150 = 3,600 10 16 12 14 15 18 BALCONY BEDROOM 20 7 DRESSING BATH ROOM 22 3 A.H.U. 20 SQM HI-SPEED LIFT 23 2 24 x 150 = 3,600 1 12 BATH ROOM Manesar, SERVICES BEDROOM 41600 entrance STAIR PRES. DUCT SERVICE LOBBY 18 SQM SKY COURT DOUBLE HEIGHT 100 SQM S-04 S-04 Detail View Sc:1:250 Dia-Grid S-02 S-01 S-03 At Typical Penthouse Floor Plan of RAMP DN 54,000 S-01 S-02 S-03 5.5 M WIDE RAMP RAMP UP STAIR PRES. DUCT 5 6 21 20 19 18 1 2 3 4 5 6 7 8 9 7 8 9 10 11 12 13 14 15 16 17 8 17 SERVICE LIFT 9 16 7 6 24 x 150 = 3,600 11 10 15 AIR CONTROL ROOM 35 SQM 21 5 4 3 2 22 1 23 STAIRS SERVICE LOBBY 18 17 16 15 14 13 12 11 10 S-04 S-04 9 8 7 6 5 4 3 2 1 1 18 2 13 14 STAIR PRES. DUCT 6 3 LOCAL LOCAL LIFT LIFT LOCAL LIFT TOILET 5 4 13 STAIRS 4 5 14 20 3 6 10 11 19 2 7 15 18 1 8 16 9 12 18 17 16 15 14 11 13 12 10 9 17 8 12 7 Tower 3 ING RK PA HI-SPEED LIFT 22 4 A.H.U. HI-SPEED LIFT 23 2 24 x 150 = 3,600 1 18 16 17 15 14 13 12 11 10 S-01 RAMP DN 5.5 M WIDE RAMP RAMP UP S-02 S-03 AIR CONTROL ROOM 30 SQM CO2 EMISSION CONTROL ROOM 30 SQM B-1 Floor Plan East Elevation Sc:1:250 School Of Architecture And Landscape Design IIIII South Elevation Sc:1:250 Shri Mata Vaishno Devi Univerity IIIII Sc:1:250 Kumar Raushan 2006 eal 30 Thesis Guide: Ar. Arshia Khajooria Bio- Climatic SERVICES Sem-x
  9. 9. S-02 Gurgaon S-01 S-03 RAMP DN 5.5 M WIDE RAMP RAMP UP STAIR PRES. DUCT SERVICES 22 3 4 5 6 21 20 19 18 SERVICE LIFT 9 8 7 6 24 x 150 = 3,600 10 21 5 4 3 2 22 1 23 SERVICE LOBBY STAIRS TOILET STAIR PRES. DUCT 7 9 10 11 12 13 14 15 16 17 18 17 16 15 14 13 12 11 10 S-04 S-04 9 8 7 6 AC PLANT ROOM (DOUBLE HEIGHT) 360 SQM TRANSFORMER ROOM (DOUBLE HEIGHT) 360 SQM 5 4 3 2 1 1 18 2 11 14 17 STAIRS 8 18 17 16 15 14 12 13 11 10 S-01 RAMP DN S-01 S-02 S-03 CO2 EMISSION CONTROL ROOM 30 SQM 5.5 M WIDE RAMP B-2 Floor Plan 5.5 M WIDE RAMP S-03 AIR CONTROL ROOM 30 SQM RAMP UP S-02 Sc:1:250 At 3 13 19 6 4 LOCAL LIFT 20 5 5 LOCAL LIFT 18 4 6 13 16 3 7 14 11 AIR CONTROL ROOM 35 SQM Manesar, 1 2 3 4 5 6 7 8 ING RK PA 15 10 15 2 9 9 1 8 16 12 18 17 16 15 14 11 13 12 10 9 17 8 12 7 A.H.U. HI-SPEED LIFT 23 2 24 x 150 = 3,600 1 RAMP UP STAIR PRES. DUCT 22 3 4 5 6 21 20 19 18 1 2 3 4 5 6 14 13 11 LOCAL LOCAL LIFT LIFT LOCAL LIFT 13 11 14 10 15 7 6 24 x 150 = 3,600 8 19 20 21 STAIRS DISEL STORAGE 85 SQM SERVICE LIFT 9 16 17 18 2 7 15 10 SERVICES 1 8 16 9 12 18 17 16 15 14 11 13 12 10 9 17 8 12 7 A.H.U. HI-SPEED LIFT 23 2 24 x 150 = 3,600 1 5 4 3 2 22 1 23 SERVICE LOBBY STAIRS STAIR PRES. DUCT WATER TREATM ENT PLANT 18 17 16 15 14 13 12 11 10 S-04 S-04 3 4 5 6 7 8 9 FIRE FIGHTING 71 SQM GENRATOR ROOM 85 SQM 10 11 12 13 14 15 16 17 EMERGENCY POWER 85 SQM B.M.S 85 SQM 9 8 7 6 AC PLANT ROOM (DOUBLE HEIGHT) 360 SQM TRANSFORMER ROOM (DOUBLE HEIGHT) 360 SQM 5 4 3 2 1 1 2 3 4 5 6 7 8 18 9 TELECOM CONTROL ROOM 85 SQM 18 17 16 15 14 12 13 11 10 S-01 RAMP UP S-02 S-03 AIR CONTROL ROOM 30 SQM 5.5 M WIDE RAMP CO2 EMISSION CONTROL ROOM 30 SQM B-3 Floor Plan North Elevation Sc:1:250 School Of Architecture And Landscape Design IIIII West Elevation Sc:1:250 Shri Mata Vaishno Devi Univerity IIIII Sc:1:250 Kumar Raushan 2006 eal 30 Thesis Guide: Ar. Arshia Khajooria Bio- Climatic SERVICES ING RK PA Tower WATER TANK Sem-x
  10. 10. Gurgaon › The Commerzbank head-office building adds an impressive feature to Frankfurt’s skyline. The nine sky gardens – the building’s “green lungs” – can be used by employees as communication and recreation areas. Dia-Grid Detail There are 16 elevators at the corners each one can carry 1600 kg. In the south core exists an outside glass elevator. Project name Suzlon One Earth Climate Warm & Humid Building type Commercial (Office) Architect: Christopher Charles Benninger The winter garden spaces provide amuch more green, natural space for those working in the building which is something lacking in the typical urban work environment. KUMAR RAUSHAN 2006 EAL 30 Case Study of Commerz Bank AREAS Plot area – Built up areaCapacity (employees)- › › 45,392 M SQ 70,865 M SQ 3,000 Planning in response to climate: Passive design strategies help in ensuring that visual and thermal comfort is maintained within the building with minimum interventions of technoLogies. The Menara Mesiniaga is the headquarters for IBM in Subang Jaya near Kuala Lumpur. It was first conceived of in 1989 and finally completed in 1992. The building is an environmental filter, an analogy for synthesis and analysis. The Menara Mesiniaga is a built work that utilizes a basis of traditional Malaysian building models and their transition or evolution into modern principles. It is Yeang’s vision of the tropical garden city and it uncovers “the relationship of buildings, landscape and climate . . .” transforming the impact of highrise development in the ecosystem of a city. › case study Chong Quing Tower,Rain Water Collection At › Dia-Grid in CCTV, China suzlon one earth case study commerz bank The central core that is usual in high-rise buildings was replaced by a 160 m-high atrium and the technical risers were accommodated in the three corners of the building. Manesar, On the first floor, a generous PLAZA with an integrated restaurant. Above the lobby leading off the PLAZA, an atrium allowing daylight to penetrate rises through all the floors, creating a bright, friendly atmosphere. The orientation of blocks is such that the majority of building faCades face North, South, North-West and South-East. This enables adequate day lighting and glare control, Glazing on the first and second flOors has been shaded From direct solar radiation using louvres. These also act as important design elements of the building and give it a visual identity. › Atrium, Suzlon One Earth KUMAR RAUSHAN 2006 EAL 30 › Case Study of Suzlon One Earth case study minara mesiniaga The building is equipped with 1. 6- classrooms, a demo center, 2. a 130-seat auditorium, lounge, 3. cafeteria, and 4. prayer rooms. › - Sky gardens that serve as villages - Spiraling vertical landscape - Recessed and shaded windows on the East and West - Curtain wall glazing on the North and South - Single core service on hot side - East - Naturally ventilated and sunlit toilets, stair ways and lift lobbies - Spiral balconies on the exterior walls with full height sliding doors to interior offices. Case Study of Menara Mesiniaga KUMAR RAUSHAN 2006 EAL 30 › Dia-Grid and Pre-Cambered Core in Capital Gate Dia-Grid in Hearst Tower School Of Architecture And Landscape Design IIIII Shri Mata Vaishno Devi Univerity Eco-Bay Complex, Abu Dhabi IIIII Kumar Raushan 2006 eal 30 Thesis Guide: Ar. Arshia Khajooria Tower Type of building: Office Location: Frankfurt am Main, Germany Architect: Foster and Partners Bio- Climatic Case Studies Sem-x
  11. 11. Gurgaon Manesar, Views and Details View of Sky Court Tower At Views of tower View of Tower Details of Louvres and Double Glazed Curtain Wall School Of Architecture And Landscape Design IIIII Bio- Climatic Detail of Roof Gardens Views of Atrium and Top Shri Mata Vaishno Devi Univerity IIIII Kumar Raushan 2006 eal 30 Thesis Guide: Ar. Arshia Khajooria Sem-x
  12. 12. Gurgaon Design Approach Gross Area :- 1962 Sqm. Net Area :- 1631 Sqm. Service Area :- 350 Sqm. 16 Gross Area :- 1949 Sqm. Net Area :- 1599 Sqm. Service Area :- 350 Sqm. Gross Area :- 2145 Sqm. Net Area :- 1796 Sqm. Service Area :- 350 Sqm. Gross Area :- 2120 Sqm. Net Area :- 1771 Sqm. Service Area :- 350 Sqm. 12 9 10 11 Gross Area :- 1997 Sqm. Net Area :- 1648 Sqm. Service Area :- 350 Sqm. Gross Area :- 2200 Sqm. Net Area :- 1851 Sqm. Service Area :- 350 Sqm. Gross Area :- 1881 Sqm. Net Area :- 1531 Sqm. Service Area :- 350 Sqm. 17 18 Gross Area :- 2134 Sqm. Net Area :- 1790 Sqm. Service Area :- 350 Sqm. 19 20 6 5 4 Gross Area :- 1941 Sqm. Net Area :- 1592 Sqm. Service Area :- 350 Sqm. Gross Area :- 1999 Sqm. Net Area :- 1650 Sqm. Service Area :- 350 Sqm. 14 13 Gross Area :- 2139 Sqm. Net Area :- 1790 Sqm. Service Area :- 350 Sqm. Gross Area :- 2108 Sqm. Net Area :- 1758 Sqm. Service Area :- 350 Sqm. 22 21 7 Gross Area :- 1930 Sqm. Net Area :- 1581 Sqm. Service Area :- 350 Sqm. 15 Gross Area :- 2042 Sqm. Net Area :- 1692 Sqm. Service Area :- 350 Sqm. Core Location in Section 23 SERVICES STAIR PRES. DUCT STAIRS 1 22 2 24 x 150 = 3,600 23 21 20 19 18 A.H.U. 20 SQM 3 HI-SPEED LIFT LOCAL LIFT 6 15 9 14 10 13 11 LOCAL LIFT LIFT LOBBY 4.5 M WIDE LOCAL LIFT 14 15 8 18 Gross Area :- 1690 Sqm. Net Area :- 1340 Sqm. Service Area :- 350 Sqm. Gross Area :- 1690 Sqm. Net Area :- 1340 Sqm. Service Area :- 350 Sqm. 26 Gross Area :- 1690 Sqm. Net Area :- 1340 Sqm. Service Area :- 350 Sqm. Gross Area :- 1921 Sqm. Net Area :- 1572 Sqm. Service Area :- 350 Sqm. Gross Area :- 1890 Sqm. Net Area :- 1540 Sqm. Service Area :- 350 Sqm. 27 Gross Area :- 1690 Sqm. Net Area :- 1340 Sqm. Service Area :- 350 Sqm. 28 Gross Area :- 1690 Sqm. Net Area :- 1340 Sqm. Service Area :- 350 Sqm. Floor Plates Gross Area :- 1640 Sqm. Net Area :- 1390 Sqm. Service Area :- 350 Sqm. Gross Area :- 1750 Sqm. Net Area :- 1400 Sqm. Service Area :- 350 Sqm. 29 Gross Area :- 1690 Sqm. Net Area :- 1340 Sqm. Service Area :- 350 Sqm. 30 Gross Area :- 1690 Sqm. Net Area :- 1340 Sqm. Service Area :- 350 Sqm. Gross Area :- 1720 Sqm. Net Area :- 1370 Sqm. Service Area :- 350 Sqm. LOCAL LIFT 3 19 20 21 2 22 1 23 STAIRS LADIES TOILET STAIR PRES. DUCT Core Detail Plan 31 SERVICES SERVICE LOBBY 18 SQM Sc:1:100 Tower Core Gross Area :- 1690 Sqm. Net Area :- 1340 Sqm. Service Area :- 350 Sqm. At 24 25 Gross Area :- 1953 Sqm. Net Area :- 1603 Sqm. Service Area :- 350 Sqm. LOCAL LIFT SERVICE LIFT 17 4 P.H. TOILET SERVICE LIFT 16 7 24 x 150 = 3,600 13 10 9 12 11 5 Gross Area :- 1980 Sqm. Net Area :- 1631 Sqm. Service Area :- 350 Sqm. HI-SPEED LIFT 5 6 GENTS TOILET HI-SPEED LIFT 4 8 16 HI-SPEED LIFT LOCAL LIFT 7 17 Gross Area :- 2044 Sqm. Net Area :- 1694 Sqm. Service Area :- 350 Sqm. Manesar, 8 Gross Area :-2012 Sqm. Net Area :- 1663 Sqm. Service Area :- 350 Sqm. 3 Sc:1:1000 Hi-Speed Lifts Local Lifts Atriums Bio- Climatic Hi-Speed Lifts Service Lifts Service Lifts Local Lifts Rain Water Collection Solar Power Generation Elevators Atrium Design Strategies School Of Architecture And Landscape Design IIIII Shri Mata Vaishno Devi Univerity IIIII Kumar Raushan Tower Gross Area :- 2486 Sqm. Net Area :- 2136 Sqm. Service Area :- 350 Sqm. 2 12 G 1 2006 eal 30 Thesis Guide: Ar. Arshia Khajooria Sem-x
  13. 13. Gurgaon Interior View of Central Atrium Interior View of Upper Atrium as Green Lungs of the Tower Tower Core Shading Strategy Shading Strategy Natural Shading by Slanting the South facade School Of Architecture And Landscape Design Bio- Climatic Tower At Atrium and Sky Courts Manesar, Design Approach Design Strategies IIIII Shri Mata Vaishno Devi Univerity 3-D View of Tower IIIII Kumar Raushan 2006 eal 30 Thesis Guide: Ar. Arshia Khajooria Sem-x

×