04 02-2013-memorandum_biomie-damir-agic_ready_v1
Upcoming SlideShare
Loading in...5
×
 

Like this? Share it with your network

Share

04 02-2013-memorandum_biomie-damir-agic_ready_v1

on

  • 77 views

 

Statistics

Views

Total Views
77
Views on SlideShare
77
Embed Views
0

Actions

Likes
0
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

04 02-2013-memorandum_biomie-damir-agic_ready_v1 Document Transcript

  • 1. MEMORANDUMMEMORANDUM ( 100 YEARS HTC/HTK : 1913 - 2013 )( 100 YEARS HTC/HTK : 1913 - 2013 ) BIOMIEBIOMIE BIOPOWER, BIOFUELS, CHEMICALS, MATERIALS 3BIOPOWER, BIOFUELS, CHEMICALS, MATERIALS 3rdrd GENERATIONGENERATION THE INVENTORSTHE INVENTORS FRIEDRICH BERGIUSFRIEDRICH BERGIUS FISCHER- TROPSCH DAMIR AGIC DAMIR AGICDAMIR AGIC && PARTNERPARTNER „YES WE CAN SAVE THE WORLD !“„YES WE CAN SAVE THE WORLD !“ --- VERSION 1.0 ------ VERSION 1.0 --- 02 / 201302 / 2013 PUBLIC DOCUMENT
  • 2. MEMORANDUM THE STORY OF BIOMIETHE STORY OF BIOMIE && DAMIR AGICDAMIR AGIC --- THE INVENTOR ------ THE INVENTOR --- •• 1980 -19831980 -1983 CHILDHOOD PAGE 3 •• 01.12.9701.12.97 ORDER FROM OUTSIDE PAGE 4 •• 12/2007 – 01/201012/2007 – 01/2010 START UP HTC/HTK- REACTOR DEVELOPMENT PAGE 5 - 11 •• 01/2010 - 01/201201/2010 - 01/2012 STUDY GERMAN HISTORY OF TECHNOLOGY PAGE 12 - 13 •• 20122012 THE SOLUTION PAGE 14 - 15 •• After 2012After 2012 VISIONS, THOUGHTS, IDEAS, CONCEPTS PAGE 16 - 24 •• 04.02.1304.02.13 PROJECT BIOMIE PAGE 16 TO BRING BACK MEMORIESTO BRING BACK MEMORIES •• 2009/112009/11 MEETING WITH THE GERMAN GREENS PAGE 17 •• 2011/52011/5 MEETING WITH THE RUSSIANS PAGE 18 + GO_POINT 2024+ GO_POINT 2024 + RÉSUMÉ+ RÉSUMÉ DAMIR AGICDAMIR AGIC OWNER / CEO AGICENRGY CEO TECHNOLOGY A&A CHEMISTRY PROJECTMANAGER AGDA (e.V.) DEVELOPMENT CAD ENGINEER AGIC POWER SYSTEMS --- DIPLOMATIC STATUS --- GERMANY 04.02.201304.02.2013 | PAGE 1 OF 23 |
  • 3. MEMORANDUM CHILDHOOD FROM DAMIR AGICCHILDHOOD FROM DAMIR AGIC (BOSNIA / 1980 - 1983) / Natural Playground / childhood In the beautiful wilderness played and learned a child without constraints. There was no TV, no computer games, no mass media, it was not what could hurt a child's soul. There was only his grandmother, who could explain everything to him and his kingdom where he could observe and discover. His soul was the mirror image of his kingdom. His ego was the king of this realm. His tenure was his kingdom. (GERMANY / 1996 - 1997) After childhood Agic Damir moved to the city and got to know the modern society. The manmade reality ached. The reality of its own reward placed on paper, because the people were well motivated and always creating something new. Therefore decided Damir Agic to improve his craft. He learned after school now in the Design Institute. After this architecture and than mechanical engineering and plant and equipment. He felt like an artist who understood the math. | PAGE 2 OF 23 |
  • 4. MEMORANDUM THE ORDER FROM OUTSIDETHE ORDER FROM OUTSIDE (GERMANY / 1997 / around Christmas)(GERMANY / 1997 / around Christmas) "You must save the world! ""You must save the world! " Damir Agic : "How can I save the world?"Damir Agic : "How can I save the world?" "Draw a picture and you'll see it!""Draw a picture and you'll see it!" From a picture, two images ...→ From a picture, two images ...→ | PAGE 3 OF 23 |
  • 5. MEMORANDUM START UP HTC/HTK- REACTOR DEVELOPMENTSTART UP HTC/HTK- REACTOR DEVELOPMENT (GERMANY / after 2007)(GERMANY / after 2007) Our exclusive little world ... ... with our Mother Nature ... ... HAS A VERY LARGE AND SERIOUS PROBLEM ...... HAS A VERY LARGE AND SERIOUS PROBLEM ... | PAGE 4 OF 23 |
  • 6. MEMORANDUM Overpopulation ... Pollution ... Hunger for power ... | PAGE 5 OF 23 |
  • 7. MEMORANDUM BUT THERE WAS LIGHT IN THE DARK!BUT THERE WAS LIGHT IN THE DARK! 100 years tucked away in a drawer German by good people who were able to appreciate this invention, it chemist Antonietti took from the drawer and gave it to the world at the right time! (After the 2nd World War all German patents were seized and brought to America) Knowing (1913) on HTC / HTK! --- HYDROTHERMAL carbonization --- --- HYDROTHERMAL carbonization --- The solution to the biggest problem of mankind ! But few were trying to do with it what. The most of them were hoping just to yourself to get a profit. They tried to get the IDEA of HTC/HTK- reactor. - No-Teamwork --- The very evil sought to block even this invention ! | PAGE 6 OF 23 |
  • 8. MEMORANDUM BUT THEN CAME THE NEWCOMER ... - - - DAMIR AGIC - - - Was tested by NASA (USA) and then cleared ... He built a Team-Works system for better development ! | PAGE 7 OF 23 |
  • 9. MEMORANDUM DAMIR AGIC INVENTED THE HTC/HTK- BIO-COAL POWER PLANTDAMIR AGIC INVENTED THE HTC/HTK- BIO-COAL POWER PLANT ( 3 months before the NASA (USA) has reported )( 3 months before the NASA (USA) has reported ) 15.12.200715.12.2007 • This saw the envious and indebted. They hoped to satisfy your ego by analog Damir Agic and tried to steal his ideas. • Damir Agic believed in the physics of God and decided to move back home in order to crack the HTC/HTK- problem alone! | PAGE 8 OF 23 |
  • 10. MEMORANDUM 2 YEARS (12/2007-01/2010) ... ALONE IN THE BASEMENT, ONLY WITH CAPTAIN ENERGY, HE DEVELOPED A HTC/HTK- PLANT AFTER ANOTHER : ... But all worked on the 0th law of thermodynamics is not well ... HE SAW THE END .... ( PEAK OIL, WE LIVE ON PUMP! ) Until he got the HPTC by Michie ! The HPTC was the starter from HTC. Which he saw in the letter, and founded Project H(P)TC. This resulted in: ENERGY AUTARK IDEA. This Bioenergy system do not need fossil energy from outside. He also transformed the system from mechanical engineering in the plant, resulting from the CARBONATOR_MODUL the CARBONATOR_SYSTEM grew. HE CRECK THE HTC/HTK- PROBLEM ! | PAGE 9 OF 23 |
  • 11. MEMORANDUM ONE WONDERS OF CHEMISTRY IS CALLED HTC / HTK HTC / HTKHTC / HTK • HYDROTHERMAL CARBONIZATION / CARBONISATION • GREEN BIOMASS ( no food ) are mixed with some water. In addition, is added a catalyst. It need a pressure of 20 bar, a temperature of 200 degrees Celsius and 10 hours time to reacts the complete green- plant to BIOCOAL, water and a little sulfur. TABLE : HTC / HTK CHEMISTRY PROCESS FROM BIOMASS TO BIOCOAL This method was first described by Friedrich Bergius in 1913, and at the Max Planck Society 9th October 2006 under the title "Magic Coal from the cooking steam pot" as a press information released. Markus Antonietti, Director at Potsdam Max Planck Institute of Colloids and Interfaces has investigated this reaction chemically. He even found that the chemical reaction releases a lot of heat. HTC/HTK DISCOVERER FRIEDRICH BERGIUS German chemist Come 11 October 1884 in Wroclaw Gone 31 March 1949 in Argentina 1931 Nobel Prize in Chemistry with Carl Bosch Coal liquefaction (Bergius-Pier process) PHOTO : FRIEDRICH BERGIUS STANDARD BIOCOAL • Damir Agic have given his BIOCOAL the name STANDARD BIOCOAL. STANDARD because there is a minimum requirement on the quality of this product to process them as other products. ANALYSIS STANDARD BIOCOAL The quality of the produce biocoal can be clearly seen. Now there is an optimal basic for producing clean energy and chemistry. This basic product does not burn with a flame but it glow without smoke.This is only possible how knows the secreats of the HTC/HTK- process and chemistry. BUT WHAT TO DO WITH THIS BIOCARBON ? WHAT ARE THE NEXT STEP ?BUT WHAT TO DO WITH THIS BIOCARBON ? WHAT ARE THE NEXT STEP ? | PAGE 10 OF 23 | SUDAN GRASS >SUDAN GRASS >
  • 12. MEMORANDUM STUDY THE HISTORY ABOUT THE GERMAN SYNTHETIC GASOLINE !!! AFTER 2010 GERMAN SYNTHETIC GASOLINE was a fuel in Germany as of the end of the 1920s years which was produced in hydrogenating plants with COAL. I.G. FARBEN has development the hydrogenating plants ( LEUNAWERKE ) in Germany. I.G. FARBEN was to the end of 1945 the biggest chemistry company in the world with the location in Germany. The STANDARD OIL COMPANY with the location in the USA was the competition. The coal deposits would hold more longer than the earth mineral oil deposits and her products was innovatively and qualitativ better, so was only a question of time to I.G. FARBEN since would the the worldwide one dominate the energy and chemicals market. I.G. FARBEN was crushed end of the second world ware by the American government. YEAR MINERAL OIL GERMAN SYN. GASOLINE 1939 8.200.000 t/a 2.200.000 t/a 27% 1940 7.600.000 t/a 3.348.000 t/a 44% 1941 10.000.000 t/a 4.116.000 t/a 41% 1942 9.500.000 t/a 4.920.000 t/a 52% 1943 11.300.000 t/a 5.748.000 t/a 51% 1944 6.830.000 t/a 3.830.000 t/a 56% EMERGE MINERAL OIL AND PRODUCTION GERMAN SYN. GASOLINE LEUNAWERK / HYDROGENATING PLANT PRODUCING GERMAN SYNTHETIC GASOLINE FROM COAL + OLD PATENT KNOW HOW ( 1938 – 1970 ) + OLD LITERATUR KNOW HOW ( 1938 – 1970 ) OLD GERMAN BOOK / TITLE COAL, AIR AND WATER | PAGE 11 OF 23 |
  • 13. MEMORANDUM WHAT ARE THE COMPETITION DOING ? A total of € 1300 million in biofuels (Germany) is investing 1ten and 2nd generation fails (research and development). The investments were made which dealt with the problem of shortage of oil companies, universities, institutes and FH. Their task was a replacement for fossil fuel, diesel and heating oil to find. Biofuels were hot. Upon further examination was made of the biofuels of agricultural fuel. The funding would be reduced and the biomass was due to the enormous demand for increasingly expensive. A bioenergy plant after another from the 1ten and 2nd generation had to file for bankruptcy. Finally I had left was the 10 - biofuel-ethanol (alcohol) through which fuel is mixed with the fossil. The alcohol is ethanol (E10 fuel blend) has a net revenue per hectare land area of approximately 300 liters. FAILURE HTC/HTK REACTOR CONSTRUCTION / COMPETITION : The HTC/HTK reactor technolgy from our competition is not serious to took. With this construction you can only produce peat, something like soil. It used electrical energy for the thermal process. How to get good quality and economic biocarbon that is only Damir Agic business secreat. 8000 Biogas plants in Germany are producing 10% of the electrical energy for Germany. More don´t match. The limit was reached. FOR WHAT WE NEED FOSSIL MINERAL OIL ? The fossil mineral oil is the basis for the industrial society development of the 20th and 21st century. It is a universal raw material for millions of materials. The fossil mineral oil is a resource not only for the energy production. It is raw material for plastics, textile, colorings, drugs, fertilizers or detergents. OTHER ENVIRONMENT- AND NEW ENERGY SYSTEMS ? • WIND POWER: E. ON FINDS SITUATION DISASTROUS IN GERMAN COUNTRY! • BE ELECTRIC CARS KNOWLEDGE CLIMATE DEMAGING! • THERMAL POWER STATION COLD PROVIDED IN GERMAN COUNTRY! • PHOTOVOLTAIK: POISON ON THE ROOF! • HUNDREDS OF BIOGAS PLANTS BEFORE THE END IN GERMAN COUNTRY ! • WIND POWER LIES! --> EUROPA HAS TOO FEW AREA TO PRODUCE ENOUGH NEW ENERGY ON THIS.--> EUROPA HAS TOO FEW AREA TO PRODUCE ENOUGH NEW ENERGY ON THIS. THE MOST AREA ARE NEEDED FOR FOOD PRODUCTION !THE MOST AREA ARE NEEDED FOR FOOD PRODUCTION ! | PAGE 12 OF 23 |
  • 14. MEMORANDUM “NOW EVERYTHING WAS CLEAR ...”“NOW EVERYTHING WAS CLEAR ...” --- THE SOLUTION ------ THE SOLUTION --- ( GERMANY / 01/2012 )( GERMANY / 01/2012 ) •• THIS SOLUTION MUST GET A SPECIAL DEFINITION ...THIS SOLUTION MUST GET A SPECIAL DEFINITION ... | PAGE 13 OF 23 |
  • 15. MEMORANDUM ( GERMANY / 01/2012 )( GERMANY / 01/2012 ) NOW IT IS TIME TO GIVE THE BABY A NAME : BIOMIENOW IT IS TIME TO GIVE THE BABY A NAME : BIOMIE | PAGE 14 OF 23 |
  • 16. MEMORANDUM THE LAST POSSIBILITY TO REPLEACE THE MINERAL OILTHE LAST POSSIBILITY TO REPLEACE THE MINERAL OIL • PROJECT BIOMIEPROJECT BIOMIE IS THE LAST POSSIBILITY TO REPLEACE THE MINERAL OIL • THE NEW GREEN ENERGY NEED A NEW GREEN CHEMISTRY • THE BEGINNING OF THE NEW GREEN CHEMISTRY IS THE PROJECT BIOMIE 04.02.2013 | PAGE 15 OF 23 |
  • 17. MEMORANDUM THE MEETING WITH THE GERMAN GREENS THE GREENS GIVE DAMIR AGICTHE GREENS GIVE DAMIR AGIC A ORDERA ORDER :: "SO WITH AN INVENTION blackmailed MAN THE PEOPLE IN ORDER TO MAKE POLICY!" 11 / 2009 THE GREENS GIVE DAMIR AGICTHE GREENS GIVE DAMIR AGIC SPECIALSPECIAL RIGHTS :RIGHTS : DAMIR AGICDAMIR AGIC --- DIPLOMATIC STATUS ------ DIPLOMATIC STATUS --- --- IMMUNITY ------ IMMUNITY --- GERMANYGERMANY „THANK YOU PROJECT LIEBELT !!!“„THANK YOU PROJECT LIEBELT !!!“ < 1% TO YOUR FAMILIES > | PAGE 16 OF 23 |
  • 18. MEMORANDUM THE MEETING WITH THE RUSSIANS 20.05.2011 ONE AMBASSADOR FROM RUSSIA COMES TO DAMIR AGIC AND ASK HIM : “What is Civil War ?” Damir Agic : ” left against right politican a society fallen into ruin !” “or, or ?” Damir Agic : “War, nation against nation !” “or, or ?” Damir Agic : “Work for every, work for every !” “What is fatherland?” Damir Agic : “The people, the children, the love !” • Than thay make a agreement about a green, new energy / technology deal between Russia and Germany in the future, up the time when the Russia natural gas go empty. • In the plan from 2050 is CHINA with energy and basic products of chemistry to deliver in the future, so that after the end of the mineral oil age in CHINAs country will be well taken care of so much inner peace, and hence the global to secure. | PAGE 17 OF 23 |
  • 19. MEMORANDUM THE MAIN- AIMS OF AGICs ORGANISATION & PARTNER 11.11.2012 / DAMIR AGIC •• The aim is the people, societies, cultures, religions and countriesThe aim is the people, societies, cultures, religions and countries to lead in international peace and harmonious living with theto lead in international peace and harmonious living with the nature.nature. •• The work is to get the knowledge about the BIOMIE and herThe work is to get the knowledge about the BIOMIE and her transformation in an environmental technology for a lastingtransformation in an environmental technology for a lasting industry.industry. •• From the mineral oil ( crude oil ) era to come in the green, socialFrom the mineral oil ( crude oil ) era to come in the green, social epoche is the solution for a peaceful world.epoche is the solution for a peaceful world. | PAGE 18 OF 23 |
  • 20. MEMORANDUM THE PROJECTMANAGER OF THE GREEN REVOLUTION !THE PROJECTMANAGER OF THE GREEN REVOLUTION ! •• TO BE THE PROJECTMANAGER OF THE 4. INDUSTRIAL REVOLUTION ( GREEN REVOLUTION ),TO BE THE PROJECTMANAGER OF THE 4. INDUSTRIAL REVOLUTION ( GREEN REVOLUTION ), THAT WAS A DREAM OF DAMIR AGIC. HE START TO CREAT GLOBAL MASTER PLANS TO SAFE THETHAT WAS A DREAM OF DAMIR AGIC. HE START TO CREAT GLOBAL MASTER PLANS TO SAFE THE NATURE WORLD AND CONCEPTS THAT THE PEOPLE CAN BE PEOPLE IN THE FUTURE WITHOUTNATURE WORLD AND CONCEPTS THAT THE PEOPLE CAN BE PEOPLE IN THE FUTURE WITHOUT MINERAL OIL, NATURAL GAS AND FOSSIL COAL.MINERAL OIL, NATURAL GAS AND FOSSIL COAL. | PAGE 19 OF 23 |
  • 21. MEMORANDUM PROJECT VISION and the 2012 PROPHECY/ VERSION 3.0 The 1st new energy biocoal producing plants works 3 x 2.500 h without any problems. This is released PROJECT PEACE IN PALESTINE. TEAM AIOP with workware make the journey to Jerusalem. In the case, agreements, contracts, drawings, information, photo and video equipment. The schedules are tight and fast. In Palestine will be military upgraded and Iran is building a nuclear bomb. TEAM AGDA have arrived in Jerusalem and settle down in hotel rooms. The Palestine Projectmanager of the AIOP creat the first strategic plans. The presidents and generals of the old world has create there plans too, and wait for the worst coming. It is a good idea to start 3rd world war in the future because the hungry and unemployed people will do many problems in own land. To send the hungry and unemployed in other land that ther kills each other and so reducing the people populated on earth will be the plan too of secrat societies. It is only a question of time. The risen is the mineral oil ( crude oil ) what goes more empty, and Iran has many of them. The mineral oil is the machine with framework of our society because it gives energy and materials. PROJECT PEACE IN PALESTINE is for THE AGDA MEMBERS not only work that has to be done or a command that you must perform it is a hallover mission for a international peace. It will come the time if will the word people development back to the stone age or development high in a social, green epoche. In the main command center in north Germany exist a quick and intelligent haven. There is no talk because everyone knows his job which will best do. The new President of the AGDA is waiting to release the project start. To get the approval, the Palestinians behind the wall and in proplem areas has to decide whether they want to have a secure job, a new apartment and a new life in peace, or want to stay in his old houses and areas and so be the center of the 3rd world war, wher nuclear bombs can exploded and tanks will used uran munition. To use uran munition means leaving radioactiv areas where childrean coming ill in a world without help and future. The aim of THE PROJECT PEACE IN ISRAEL is to create a peaceful, social and green Palestine so the people send news to the world, let us together peaceful life in the hallow land of the biggest world religions. An undercover informant of the AGDA have to give the information to the Pope with the 144.000 hectares new agricultural area in Palestine. In the Bible has the 144.000 a symbolic meaning. It means when the 144.000 comes than will start a new age with a peaceful society for the next long time periode. PROJECT PEACE IN PALESTINE is still "MISSION SECRET" at the first years. That means that the press should not report on the overall project, because thay are powerful companies how are planning to make a big business with war in the future. Despite this news blockade the people of our planet are waiting for the 2012 prophecy. For some it is the end of the world for others a new beginning for the world and for the rest a new revolution. Some even say, if not 2012 2012 comes it will 2015 comes. 06.09.2012 | PAGE 20 OF 23 |
  • 22. MEMORANDUM NOTICE • After a study in the USA and a global master calculation from AGICENERGY ( it was generated the some result ) only 500,000,000 people can live on the world in harmony with the natural world without mineral oil / natural gas / coal and biofuels and chemicals 2nd generation. This calculation need only standard green agricultural areas and biomass what is regular get a definition as food. • Bioenergy, biofuels and chemicals 3rd generation ( BIOMIE ) need green biomass ( sudangrass and algae ) what grow in dry and desert areas. That means that is very important to research and development a new study how many people can live on the world in harmony with the natural world without mineral oil / natural gas / coal. From the first linear interpolation view ( very rough calculation ) there can 10 bill. People survive. The question is what will that costs, how many investment is need to save bill. and bill. human life on the earth moreover the natural world. This is very important question for leader and presidents of the world, because this can be a reason to stop planning war in the future because there is a better solution. | PAGE 21 OF 23 |
  • 23. MEMORANDUM THE AGDA PLANTHE AGDA PLAN To work and life in dry and desert areas independent in the future without crude oil, natural gas and coal is possibel after the first rough study with bioenergy, biofuels and chemicals 3rd generation ( BIOMIE ). Moreover we have a good food solution with our new green hous concept. Everywhere will millitary upgraded because it is going for the last energy resources. Energy resources can not be recycled. The people of our world are insecure and worry about the future of our childrean. It's not only going about a global human being problem. It´s going about a climate, nature and animal problem what are depend on the human being problem. Are we at the best way to destroy the life what god has given us ? In the long run yes how has study the situation today and than loooking in the history to extracting what will out of the future comes. 21.01.201321.01.2013 | PAGE 22 OF 23 |
  • 24. MEMORANDUM ART_LYRICSART_LYRICS “God has fallen on me and allowed me to work with strategy with the devil together to save the people to be people and to save mother earth in the future , his creation. He gave me the master of the genie after a disabled IQ of 70, because I was non- saleable for the devil. The devil has robbed me the mind because I say no to him with his goods, money, gold and diamonds but I say yes to a friendship . Actually, I must for all good in my live thanks the devil, because I show God to be not for sale. My inner voice comes from outside, I hear the truth and not lie. My truth are the numbers and the image that I need therefore to to see and calculate and than to understand the future. My images in my head that I receive can only be from a universum of ideas, because thay are concrete and not fantastic. I am the visionary of the new social, green epoche. That is not promulgate from me such from people how can examine in detail. The devil has hold me peceful in his arms in my dream. I've seen him in Facebook with me together as a child. I wore a black and a white sock. Therefore I teach the devil to Love, what Christians most believe in. Love your neighbor as yourself. Thus learns the Devil from me and I not from the devil. I tear up with my clear mind reactions over long distances and bring people ideas, so thay think it would be their ideas and what good acting by their thoughts. The real people can understand and give her time for the future of the new generations and our nature planet, such for the life.” 18.11.2012 / Damir Agic18.11.2012 / Damir Agic | PAGE 23 OF 23 |
  • 25. GO_POINT 2024 GERMANGERMAN FUELS & CHEMICALS 3rd GENERATION 15.09.2011 GO_POINT 2024GO_POINT 2024 DATE 2024DATE 2024 bbl. ( U.S. ) 185,00 The market determine the prices. Subsidies, government subsiddies and renewable energy law will no longer used. The basis of this calculation is the linear increase in fuel prices in Germany up for a longer period of time, less of fossil petroleum, to become more expansive by drilling and handling and the increasing demand for petroleum products. Another basis of this calculation is the cost calculation for a 42 MW_HTC BioPower System. From these facts the GO_POINT 2024a is been calculated. The GO_POINT is the time where our new BIOPOWER ENERGY and CHEMICALS can compete with the old energy and chemicals in relation to the expectations of our BUSINESS and the FUEL TAXES. 250 Mrd. € per year250 Mrd. € per year 250.000 Mio. € per year250.000 Mio. € per year 250.000.000.000 € per year250.000.000.000 € per year THE MARKET VOLUME FOR HTC / HTK ORIGIN : MAX- PLANCK- GESELLSCHAFT GRAPHICS : THE PEAK OIL THEORY ENERGY PRICES ( FUELS) BARREL [PRICE] DATE(18.07.2011) / FUTURE 117 ,75 USD / 185,00 USD / +54% FUELS PRICES GAS STATION DATE(18.07.2011)/ FUTURE 1,6 €/L / 2,46 €/L / +54% BUSINESS RETURNS FOR TAXES 37,5 % / 150 Mrd. € pro Jahr RETURNS / NET PROFIT 18 % / 72 Mrd. € pro Jahr COST MANPOWER, MATERIALS AND AGRICULTURAL LAND AREA PERSONNEL REQUIREMENTS GB.5B 2.600.000_MAX / 192.000_MIN 42 MW_HTC (ca.) / 320.000 MW_HTC 8.000 BIOPOWER SYSTEMS INVESTMENT 400 Mrd. EURO / Anlagenlaufzeit 25 Jahre / BETRIEB 8.000 h / a TURNOVER BEFORE TAX 250 Mrd. € pro Jahr OUTGOINGS 100 Mrd. € pro Jahr PRODUCTION QUANTITY[BARREL] 7.940 x 12.800.000 Liter 77 Mio. Tonnen 639 Mio. Barrel pro Jahr→ → OUR SUPPLY / DEMAND WORLD 87 Mio. Barrel pro Tag x 365 Tage | 2 % / Das 1/50- Fache |→ AGRICULTURAL LAND AREA MIN. 400.000 km² – 800.000 km² ( Biomass 60 t – 30 t ( fresh ) / ha ) EQUIVALENCE CALCULATION STAND 18.07.2011 117,75 USD / 82,2 EURO EQUIVALENCE TO CRUDE OIL 3 : 1 / AUS MASSENBILANZ STANDARD BIOCOAL : BCtL ( BIO-CRUIDE-OIL) STANDARD BIOCOAL 3.000 kg TS 750 EURO / 1.125 EURO STANDARD BIOCOAL | SB TONNE Min/Max 250 EURO / 375 EURO | BCTL MANUFACTURING 830 EURO / 1.245 EURO á 1.300 Liter BCTL BARREL [159Liter] MANUFACTURING 100 EURO / 150 EURO BCTL BARREL [159Liter] TRADE 100 EURO / 150 EURO BCTL BARREL [159Liter] SALE 125 EURO bbl. ( U.S. ) 125,00 EURO / 181,25 USD TIME CRUIDE OIL PRICE INCREASE |2011-1,6 €/ L|2016-1,99 €/ L| 5 a / 24% | 10 a / 48% / 2,46 €/ L / 2024 - 12 | AGICENERGY
  • 26. PERSONAL DATA name Damir Agic birth / place of birth 16.07.76 / Lippstadt marital status unmarried nationality german / ( bosnien ) ADDRESS : | Ackersmannstraße 53 / 59558 Lippstadt / NRW.Germany | RÉSUMÉ / DAMIR AGIC PHOTO RÉSUMÉ : DAMIR AGIC 04/ 2010 12/ 2007 – today • INDEPENDENTLY / Duisburg, Paderborn, Lippstadt ( Germany ) • CAD DEVELOPMENT ENGINEER : BIOENERGY, CHEMICALS 3rd GENERATION ( INVENTOR ) • OWNER, CEO : AGIC ENERGY UG PROFESSIONAL EXPERIENCE & TRAINEESHIP DURING MY STUDY TIME • TRAINEESHIP : • ULRICH ROTHE ANLAGENBAU GmbH / 2 weeks • CP- ENGINEERING GmbH / 8 weeks • FESER ONE / 12 weeks • GRENOL GmbH / 12 weeks • NES GmbH / 6 months ( external ) • NASA ( USA ) / Qualification test for development engineer passed with very good • PORSCHE AG / 2 weeks ( external ) • HITACHIE POWER EUROPA GmbH / 4 weeks ( external ) • ./. AUTOMATION ENGINEERING / 2 weeks • 05/ 2007 – 08/ 2007 • RIMA SYSTEMS GmbH / Mönchengladbach ( Germany ) / as a student • CAD Draftsman • Machinery and equipment design to create custom 3D and technical documentation. • 04/ 2006 – 07/ 2006 • SWITCHCRAFT EUROPA GmbH / Duisburg ( Germany ) / as a student • CAD Draftsman • Switchgear, switchboards, caps and vacuum circuit breakers Medium voltage class, sheetmetal, plastic body cast and wind turbine with the SolidWorks CAD design, develop and construct. • 11/ 2005 – 03/ 2006 • G&S BMX / Herten ( Germany ) / as a student • CAD Draftsman • Frame, handlebar, stem and fork for BMX bikes & M and Fun bikes with AutoCad CAD design, develop and construct. • 08/ 2002 – 07/ 2004 • INSTITUTE OF MECHATRONICS / University Duisburg ( Germany ) / as a student • CAD Draftsman | 8. / PAGE 1 VON 2 |
  • 27. PERSONAL DATA name Damir Agic birth / place of birth 16.07.76 / Lippstadt marital status unmarried nationality german / ( bosnien ) ADDRESS : | Ackersmannstraße 53 / 59558 Lippstadt / NRW.Germany | RÉSUMÉ / DAMIR AGIC PHOTO RÉSUMÉ : DAMIR AGIC 04/ 2010 • 10/ 2001 – 10/ 2009 • STUDY: MACHINES AND EQUIPMENT / University of Duisburg ( Germany ) • BREAK • 08/ 1997 – 01/ 2000 • STUDY: ARCHITECTURE / University of Wuppertal ( Germany ) • undergraduate degree • 07/ 1996 – 08/ 1997 • VOCATIONAL EDUCATION: TECHNICAL ARTIST / DESIGNER (INDUSTRIAL DESIGNER) • Privat Design Institute in Rheda- Wiedenbrück ( Germany ) • 1993 - 1996 • HIGH SCHOOL • Gymnasium Schloss Overhagen in Overhagen / Lippstadt ( Germany ) • CERTIFICATE IEU ( 09/2009 ) ◦ Corporate Planning ◦ Accounting ◦ Calculation ◦ Profit- / Loss Account ◦ Funding ◦ Law and Contracts ◦ Advertising and Marketing | 8. / PAGE 2 VON 2 |