Your SlideShare is downloading. ×
2010-6-22 WDT Building Program Overview
2010-6-22 WDT Building Program Overview
2010-6-22 WDT Building Program Overview
2010-6-22 WDT Building Program Overview
2010-6-22 WDT Building Program Overview
2010-6-22 WDT Building Program Overview
2010-6-22 WDT Building Program Overview
2010-6-22 WDT Building Program Overview
2010-6-22 WDT Building Program Overview
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

2010-6-22 WDT Building Program Overview

329

Published on

2010-6-22 WDT Building Program Overview

2010-6-22 WDT Building Program Overview

Published in: Technology, Business
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
329
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Western Dakota Tech Building Programming Overview
  • 2. Goals and Objectives
    • GOALS AND OBJECTIVES
    • Develop a branch library
      • Provide a resource for the community and students
    • Develop a One-Stop Shop
      • Provide a new primary, easily identifiable entry
      • Consolidate student support functions
    •   Consolidate existing Rushmore Building to New Campus
    • Create a highly efficient learning environment
    • Develop an environmentally sustainable place to work and learn
    • Open building by Fall 2010
  • 3. Campus Master Planning Meetings MEETING SCHEDULE 6 April 2010 @ 9 am Introduction 6 April 2010 @ 10 am Physical Plant, Maintenance 6 April 2010 @ 1 pm Marketing, Admissions, IT, Dorms,   7 April 2010 @ 8 am General overview 7 April 2010 @ 10 am Library 7 April 2010 @ 1 pm Executive session   20 April 2010 @ 1 pm General Ed/BMM Dept 20 April 2010 @ 3 pm Health/Human Service Dept   21 April 2010 @ 8 am IT 21 April 2010 @ 10 am Data 21 April 2010 @ 1 pm Marketing 22 April 2010 @ 8 am Corporate Education 22 April 2010 @ 10 am One-Stop Shop 22 April 2010 @ 1 pm Food Service 22 April 2010 @ 3 pm Online Delivery   23 April 2010 @ 7 am Technology Dept 23 April 2010 @ 10 am Student Services 23 April 2010 @ 1 pm Executive Summary
  • 4. Expansion Overview CIP 1 - NEW BUILDING Phase 1 Phase 2
      • Campus Entry / One-Stop Shop
    8,000 SF
      • Learning Commons / Library
    10,538 SF
      • Move of tech program from Rushmore
        • Auto Tech Shop
    4,189 SF
        • Diesel Shop
    4,661 SF
        • Diesel Shop
    9,480 SF
        • Welding Shop
    2,436 SF
        • Carpentry Shop
    3,108 SF
        • Carpentry Shop
    1,624 SF
      • Environmental Lab
    2,790 SF
      • Environmental Lab
    682 SF
      • EMT
    975 SF
      • CPR
    2,028 SF
      • Dental Lab
    728 SF ACTUAL SQUARE FOOTAGE 36,868 SF 14,371 SF GROSS SQUARE FOOTAGE (130%) 47, 928 SF 18,682 SF 66,611 SF $175 / SF $175 / SF SUBTOTAL FOR NEW CONSTRUCTION 8,387,470 SF 3,269,403 SF 11,656,873 SF
  • 5. Expansion Overview CIP 1 - REMODEL BLDG SPACE Phase 1 Phase 2
      • Classroom& Offices
    5,890 SF
        • Classroom
    1,167 SF
        • Classroom
    1,173 SF
        • Classroom
    1,181 SF
        • Office
    1,181 SF
        • Office
    1,188 SF
        • Office
    851 SF
        • Office
    3,022 SF
      • Study Space (Library)
    2,098 SF
      • Student Services
    3,022 SF ACTUAL SQUARE FOOTAGE 20,773 SF GROSS SQUARE FOOTAGE (130%) 27,005 SF $ 60 / SF REMODELED SUBTOTAL 1,620,294 SF NEW REMODEL TOTAL TOTAL FOR CIP 1 11,656,873 SF 1,620,294 SF 13,277,167 SF
  • 6. Expansion Overview CIP 2 Phase 1 Phase 2
      • Biology Library
    1,400 SF
      • A&P Laboratory
    1,400 SF
      • Chemistry Lab
    1,400 SF
      • Pharmacy Tech
    1,200 SF
      • Phlebotomy
    1,200 SF
      • HS Tech
    1,200 SF
      • Practical Nursing
    1,800 SF
      • Surgical Tech
    1,200 SF
      • Physical Plant
    9,200 SF
      • Special Use
    5,562SF
      • General Use
    13,102 SF
      • Office
    939 SF
      • Office
    980 SF
      • Office
    939 SF
      • Office
    980 SF
      • Office
    981 SF ACTUAL SQUARE FOOTAGE 36,864 SF 4,819 SF GROSS SQUARE FOOTAGE (133%) 51,423 SF 6,409 SF 57,832 SF $175 / SF $175 / SF SUBTOTAL FOR NEW CONSTRUCTION 8,999,046 SF 1,121,622 SF 10,120,668 SF
  • 7. Expansion Overview CIP 3
      • Phase 1 Student Housing
    100 32,000 SF $150 / SF $ 4,800,000
      • Phase 2 Student Housing
    100 32,000 SF $150?SF $ 4,800,000
      • Phase 3 Student Housing
    100 32,000 SF $150/SF $ 4,800,000
  • 8. SUSTAINABLE DESIGN CONCEPT Economic Educational Site
      • Public Transportation Access
    X
      • Bicycle Storage
      • Encourage high efficient – low-emitting vehicles
      • Protect or restore the natural habitat
      • Storm water design
      • Reduce heat absorption
      • Reduce light pollution
    Water Efficiency
      • Reduce water usage
    X
      • Water efficient landscape
    X Energy& Atmosphere
      • On-site renewable energy
    X
      • Optimize energy performance
    X X
  • 9. SUSTAINABLE DESIGN CONCEPT Economic Educational Materials & Resources
      • Storage and collection of recyclables
      • Building reuse – reuse ext walls, floors + roof
    X
      • Construction waste management
      • Recycle content
      • Regional materials
      • Rapidly renewable materials
    Indoor Environmental Quality
      • Environmental tobacco smoke control
    X
      • Increased ventilation
    X
      • Indoor air quality management plan
      • Low-emitting materials, paints, coatings, floor coverings, adhesives and sealants
      • Controllability of lighting
    X X
      • Controllability of lighting
    X X
      • Daylighting
    X X
      • Exterior views
    X
      • Thermal comfort verification
    X

×