• Like
  • Save
Rankin
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

Rankin

  • 202 views
Published

 

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
202
On SlideShare
0
From Embeds
0
Number of Embeds
1

Actions

Shares
Downloads
0
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. Tim Rankin 4038 Salt Spring Dr Ferndale, WA 98248 360-305-1444 rankinta@comcast.net A position that will utilize my previous experience and challenge me to continually improve Objective and develop. Profile 6 years experience as engineering manager. P 3 years experience as lead engineer. 6 10 years experience as a contract design engineer. 3 Goal-oriented individual with strong leadership capabilities. 1 Organized, highly motivated problem solver. G Proven ability to work within a team in several roles. O Extensive knowledge of aircraft and the requirements within the industry. P
  • 2. Employment Engineering Manager, Heath Tecna Jan. 2003 - Present Managed a group of 35-150 individuals ranging from entry level drafters to lead engineers. J Ensured both non-recurring and recurring budgets were met. M Provided hours estimates for the various jobs being worked by sales. E Developed and executed manpower plans to coincide with the potential sales. P Performed performance reviews for direct employees as well as reviewing the performance of D contract employees and taking appropriate action depending on the results. (Raise – EOA) Developed skills of direct staff under my supervision. c Hosted design reviews for all projects within my group ranging from partitions to full-up aircraft D reconfigurations. Hosted group meetings to ensure all members of my group were informed on company events r and group activities. Purchased a new CAD and Data Management system to be primarily used for furniture design. a (Closets, partitions, VCC’s etc….) Oversaw the implementation of the new CAD (Solidworks) and Data Management (PDMWorks) ( system. Improved efficiency within the engineering department by utilizing tools to develop new or s improve existing processes. Lead Engineer, Heath Tecna Dec. 1999 – Dec. 2002 D Head of various programs ranging from closet designs to cockpit interior design. H Responsible for running a group ranging from 6-15 engineers and drafters. R Responsible for developing a design to meet customer expectations. R Gave presentations of designs to customers at ITCM, PDR, and CDR. (Design Reviews) G Met regularly with DBT (Design Build Team) to ensure follow on groups needs were met. M Conducted group meetings to make sure expectations were clear to my group and all members had an understanding of the program. Contract Engineer, Heath Tecna Sept. 1998 - Dec. 1999 Responsible for developing designs within tight time constraints to meet both internal and external customer requirements and specifications. e Design efforts included components for bins, ceilings, sidewalls as well as support structure for these items and others. Contract Engineer, Raytheon Nov. 1997 - Aug. 1998 N Worked interior design of the cockpit for the Hawker Horizon. Responsible for the design of the window reveals, headliner and sun visor rails. w Work consisted of surfacing and solid modeling of these components. Contract Engineer, Boeing April 1997 - Nov. 1997 A Responsible for the design of support structure for an entertainment rack. The design included intercostals, stanchions, and clips. s Worked on floor panels and support structure for galleys and lavatories in section 41. Canadair, Montreal, Quebec Jan. 1997 - March 1997 J Worked preliminary design of the floor structure for the new RJX aircraft giving special attention to corrosion protection, working to eliminate corrosion problems encountered on previous aircraft. a Responsible for layout of longitudinal and transverse floor beams, seat rails, and posts. Boeing, Wichita, Kansas March 1996 - Jan. 1997 Worked on both the forward and aft bulkheads for the PW Inlet and Fan Cowl. W Work included solid modeling and detailing of support fittings, stiffeners, and support structure for a pressure/temperature probe installation. Flight Structures Inc., Arlington, Washington Jan. 1995 - March 1996 J Worked primarily on floor structure in sections 41 and 42 for a 747 Combi to freighter conversion.
  • 3. Additional Skills CATIA V5 – Basic Training SolidWorks – 1000 Hours CATIA V4 – 16000 Hours MS Office - Word, Excel, PowerPoint and Project