• Save
Rec framework in india
Upcoming SlideShare
Loading in...5
×
 

Rec framework in india

on

  • 1,282 views

 

Statistics

Views

Total Views
1,282
Views on SlideShare
1,282
Embed Views
0

Actions

Likes
2
Downloads
0
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

    Rec framework in india Rec framework in india Presentation Transcript

    • REC Framework in India Ranjeet Singh Research Associate, Regulatory Affairs WISE, Pune
    • The Presentation follows………..
      • Basics of REC
      • Need for effective implementation of REC
      • REC framework in India
      • Procedure for Implementation of REC.
      • Benefits
    • Basics of REC (1/3) RE Power Generation Environmental Attribute Power Generation REC REC= 1MWH RE Generation feed to grid
    • Basics of REC (2/3) Environmental Attribute REC Solar REC Non-Solar REC
    • Basics of REC (3/3) RE Power Generation Environmental Attribute Power Generation Sale at Market determined price Sale at Av. Pooled price of power procurement
    • Need for Effective implementation of REC
      • Veracious RE resource assessment Study.
      • RE generation (solar/non-solar) to meet the national level RPS .
      • Stringent regulation for penalising obliged entity for non compliance of RPO.
      • Training for operators for efficient commercialisation of REC framework.
    • REC Framework
    • Eligible Entity Central Agency Power Exchange SLDC Distribution Utility State Agency App. for Accreditation App. For Registration App. For Issuance Intimation of Registration Intimation of Issuance Intimation of Accreditation Intimation of Joint Meter Reading Joint Meter Reading Joint Meter Reading Offer for Sale Bid for Purchase Trade intimation
    • Procedure for Implementation of REC
      • Accreditation of REC by State Agency
      • Registration of REC by Central Agency
      • Issuance of REC by Central agency
      • Redemption of REC by Central Agency
    • Accreditation of REC by State Agency Eligible Entity SLDC Central Agency State Agency App. for Accreditation Intimation of Accreditation Intimation of Accreditation Intimation of Accreditation Distribution Utility
    • Steps for Accreditation of REC
      • Application by Eligible Entity to host State Agency. Separate application required by the applicant in case of multiple RE generation project.
      • A unique acknowledgement number shall be assigned by the state agency for each application for accreditation.
      • A preliminary scrutiny by state agency after receipt of application to ensure the completeness of the application in all respect. (Within 2 days)
      • Written intimation to applicant for further information if required by the state agency (the applicant have to furnish requisite details within 7 days).
      • In case of rejection of application, a written intimation is given to applicant within 2 working days from date of receipt of the application by State Agency.
      • Verification of information during consideration of application for accreditation
      • Grant of ‘certificate of accreditation’ after inspecting /verification of required information for accreditation .
    • Pre- accreditation check –by SA (1/2)
      • Confirmation of ‘Availability of Land’ in possession for setting up
      • generating station
      • Power Evacuation Arrangement permission letter from the host State
      • Transmission Utility or the concerned Distribution Licensee, as the
      • case may be
      • Confirmation of Metering Arrangement and Metering Location
      • Date of Commissioning of RE project for existing eligible RE Project or
      • proposed date of commissioning for new RE for accreditation
      • Copy of Off-take/Power Purchase Agreement or Undertaking
      • Proposed Model and Make for critical equipment (say, WTG, STG, PV
      • Module) for the RE Project. Confirmation of compliance of critical
      • equipment with relevant applicable IEC or CEA Standards
      • Undertaking for compliance with the usage of fossil fuel criteria as
      • specified by MNRE
      • Details of application processing fees/accreditation charges
      Pre- accreditation check –by SA (2/2)
    • Registration of REC by Central agency Eligible Entity Central Agency State Agency SLDC Power Exchange App. for Registration Intimation of Registration Intimation of Registration Intimation of Registration
    • Steps for Registration of REC
      • Application by Eligible Entity to Central Agency . Separate application required by the applicant in case of multiple RE generation project.
      • A unique acknowledgement number shall be assigned by the Central agency for each application for registration.
      • A preliminary scrutiny by Central agency after receipt of application to ensure the completeness of the application in all respect. ( Within 2 days )
      • Written intimation to applicant for further information if required by the Central agency ( the applicant have to furnish requisite details within 7 days ).
      • In case of rejection of application, a written intimation is given to applicant within 2 working days from date of receipt of the application by Central Agency.
      • Verification of information during consideration of application for Registration
      • Grant of ‘certificate of registration’ after inspecting /verification of required information for registration.
    • Pre- Registration check –by CA
      • A Valid Certification of Accreditation by State Agency
      • Date of Commissioning or Commissioning Schedule for new
      • projects.
      • Undertaking that it has not entered into any Power Purchase
      • Agreement at preferential tariff as may be determined by the Appropriate Commission
      • Details of payment of registration fees/charges
    • Issuance of REC by Central agency Eligible Entity Central Agency State Agency SLDC Distribution Utility App. for Issuance Intimation of Issuance Intimation of Issuance Intimation of Issuance Injection report Injection report Joint meter reading Joint meter reading
    • Steps for Issuance of REC
      • Application by Eligible Entity to Central Agency. Entity have to mention their unique registration code assigned by central agency at the time of registration.
      • Central Agency assign an acknowledgement number after referring the registration code.
      • A preliminary scrutiny by Central agency after receipt of application to ensure the completeness of the application in all respect. ( Within 2 days )
      • Written intimation to applicant for further information if required by the Central agency. ( the applicant have to furnish requisite details within 5 days ).
      • In case of rejection of application, a written intimation is given to applicant within 2 working days from date of receipt of the application by Central Agency
      • Verification of information during consideration of application for Issuance
      • Grant of ‘Renewable Energy Certificate’ after confirming the claim by Eligible Entity and injection report by SLDC.
    • Pre- Issuance check –by CA
      • Verification of the time period for which the Central Agency may have already issued Renewable Energy Certificates to the concerned Eligible Entity.
      • Verification of Renewable Energy Certificates claimed by the Eligible
      • Entity from the Energy Injection Reports submitted by the concerned
      • State Load Despatch Centre in respect of concerned Eligible Entity.
      • Details of fee & charges made for issuance of certificates.
      • Confirmation of Compliance Auditor report, if any .
    • Redemption of REC by Central agency Eligible Entity Power Exchange Obliged Entity Central Agency Bid for sale of REC Bid for purchase of REC 13.00-15.00 hrs . 13.00-15.00 hrs . Trade intimation 15.30 hrs . REC Confirmation 16.00 hrs . MCP and MCV 16.00-17.00 hrs .
    • Sample REC
    • Pricing of REC REC Non-Solar Solar Floor Price Rs12.28/kWh Forbearance price Rs17.23/kWh Floor Price Rs1.45/kWh Forbearance Price Rs3.78/kWh
    • Benefits of REC
      • Promote RE generation.
      • Help RE potential deficit state for compliance of their RPS.
      • Enable states to fix RPS in line with NAPCC .
      • Promote RE market .
      • To equally distribute RE purchase impact across the country.
      • Overcome geographical constraints like inter-state trading of Renewable power .
    •