AL SHIFA HOSPITAL PVT.LTD.
STANDARD OPERATING PROCEDURE
ASH/PRCHSE/SOP-11
INDEX
SL. NO.
1
2
3
4

PARTICULARS
PURPOSE
SCOPE
RESPONSIBILITY
PROCEDURES
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
ix.
x.
xi.
xii.
xiii.
xiv.
xv.
xvi.
xvii.
xviii.
xix.
xx.
xxi.
xxii.

5
6

PAGE NO.
2
2
2
3-11

Reasons for purchase
Collection of quotation
Replacement of existing Item
New Purchase
Purchase committee
Purchase order preparation
Evaluation of suppliers
Approval of purchase order
Ordering the material
Local purchase
Receiving and accepting goods
GRN entry
Documents verification
Storage of goods
Tracking of goods
Stock updating
Stock verification
Stock maintenance
Expiry checking
Material issue
Returning of materials
Disposal of damaged or expired items

PROCEDURE FOR CONTROL OF RECORDS
ANNEXURES
1. ORGANIZATION CHART - Organization chart
(ASH/ADM/HRD-09) Revision no.:01, revised on
01/01/2012has attached as annexure-1
2. ACTIVITY FLOW CHART-1
(ASH/PRCHSE/FCHRT-10)
3. ACTIVITY FLOWCHART-2
(ASH/PRCHSE/FCHRT-11)
4. APPROVED LIST OF SUPPLIERS
(ASH/ADM/STR-03)
5. SUPPLIER EVALUATION
REPORT(ASH/ADM/STR-05)

12

REVISION NO

DATE

PAGE NO

00

01.06.2011

Page 1 of 12

Safety through quality, service with commitment
AL SHIFA HOSPITAL PVT.LTD.
STANDARD OPERATING PROCEDURE
ASH/PRCHSE/SOP-11

1.

PURPOSE

To lay down a procedure for purchasing and to evaluate suppliers, rate and develop
them so as to select suppliers on the basis of their ability to meet the quality requirements.

2.

SCOPE

This procedure covers,
a) Purchase of items such as Equipments, Instruments, Furniture, Office Stationary, Spares,
and Consumables.
b) Registration of Potential suppliers
c) Evaluation and development of existing suppliers.

3.

RESPONSIBILITIES
Collection of quotation – Purchase Assistant
Preparation of purchase order – Purchase Manager
Approval of purchase order – Managing Director / Finance Director
Evaluation of suppliers – Purchase Manager
Storage of items – Store Incharge

REVISION NO

DATE

PAGE NO

00

01.06.2011

Page 2 of 12

Safety through quality, service with commitment
AL SHIFA HOSPITAL PVT.LTD.
STANDARD OPERATING PROCEDURE
ASH/PRCHSE/SOP-11

4.

PROCEDURES
1. Reasons for purchase
An item purchase request is raised with different intentions such as :
 A new item to replace an existing obsolete /damaged item.
 An item which is already in use but additional ones are needed to meet the
complete requirement.
 A new item to facilitate a function that was done manually/ not done till date.
2. Collection of quotation
a) A user/user department raises a request for an item, which shall be furnished with the
proposed use, users, functional specifications, safety specifications if required, as well
as the brands available in certain cases.
b) The purchase manager scrutinizes the requirement in terms of cost, criticality of the
requirement, quality of product, service and spares availability, vendor/supplier
status, and initiates the communication with the vendors. Where the cost comes
within his authorization for initiating purchase orders, he initiates the process. Where
the cost exceeds his authority to decide, he puts it up to the purchase committee and
finance department to decide.
3. Replacement of an existing item:
If the intention of purchase is replacement of an item which was in use, the
condemnation note is verified. If the condemnation note is not submitted, it is
prepared.

REVISION NO

DATE

PAGE NO

00

01.06.2011

Page 3 of 12

Safety through quality, service with commitment
AL SHIFA HOSPITAL PVT.LTD.
STANDARD OPERATING PROCEDURE
ASH/PRCHSE/SOP-11
The condemnation note is submitted to the condemnation committee. If the
committee approves, and gives it in writing, then the purchase manager proceeds with
the purchase order. If the committee rejects condemnation, then the user is informed
the same, in writing explaining this as the ground of denial in purchasing the
requested item.
4. New purchase:
Where the item is a new purchase, the specification report is put for approval from the
purchase committee. The committee considers the requirement for discussion in the
meeting thereafter convened, scrutinizes the requirement against set parameters and
accepted practices, and if found necessary, approves the requirement. The purchase
manager subsequently prepares the purchase order. If the committee rejects the
requirement then the user is informed the same, in writing explaining this as the
ground of denial in purchasing the requested item.
5. Purchase committee
The purchase committee Members are,
1) Medical Equipments and Machineries
1) Managing Director / Finance Director
2) Purchase Manager
3) Store Incharge
4) Biomedical Engineer
5) End user / Indenter

2) Maintenance & Electrical Equipment and Machineries
1) Managing Director / Finance Director
2) Purchase Manager
3) Store Incharge
4) Maintenance Engineer
REVISION NO

DATE

PAGE NO

00

01.06.2011

Page 4 of 12

Safety through quality, service with commitment
AL SHIFA HOSPITAL PVT.LTD.
STANDARD OPERATING PROCEDURE
ASH/PRCHSE/SOP-11
5) End user / Indenter
6. Purchase order preparation
a) Purchase Manager prepares the purchase order.
b) Purchase order is placed only for suppliers from the approved list.
c) Purchase order contains the following information


Clear description of goods/services to be procured



Quantity rate and value



Requirement of test certificates, if any



Delivery schedule



Mode of dispatch and payment terms



Inspection clauses

d) Purchase order is verified and reviewed for its completeness by Finance Director if the
cost exceeds Rs 10,000 and then approved by CMD.
e) Copies of purchase order are distributed to Stores and Accounts Departments.

7. Evaluation of suppliers
a) The Store Incharge makes a note about the quality of the product and delivery
performance of the vendor for Vendor rating.
b) The supplier is evaluated once in six months with reference to the Vendor Evaluation
Rating Criteria.
Existing suppliers are evaluated based on their past performance generally according to
the following parameters
Quality Rating (QR) =

Quantity / No. Accepted
80 = 80 Max.

REVISION NO

DATE

PAGE NO

00

01.06.2011

Page 5 of 12

Safety through quality, service with commitment
AL SHIFA HOSPITAL PVT.LTD.
STANDARD OPERATING PROCEDURE
ASH/PRCHSE/SOP-11
Quantity / No. Supplied
Delivery Rating (DR) =

10/15/20 = 20 Max.

20 = Supply total quantity of materials on or before the agreed date.
15 = Supply total quantity/number of materials within 7 days from the expiry of agreed
date.


Those who score (QR+DR) equal to or greater than 70 will find a place in the
approved list.



Those who score less than 70 require action for improvement.



Purchase Manager gives guidance to the suppliers to improve their performance.



After taking corrective measures these suppliers are evaluated again.



If the score is below 70, the names of such suppliers are removed from the
approved list.

c) If the supplier is found acceptable, then the supplier is included in the Approved Vendor
List.
d) If the supplier is not acceptable, the same is informed to the supplier through a letter.
e) Stores Incharge maintains the details of the delivery performance of the vendor such as
quality supplied, actual date of delivery and quantity accepted through Delivery challan.
f) The details are recorded in the Vendor Rating Form.
g) The acceptance rate is calculated as explained in the Vendor Rating Form.
h) Based on the Vendor Rating, the decision regarding the acceptance or removal of the
supplier from the Approved Vendor List is made by the Store Incharge, with the approval
of Managing Director.
i) The Store Incharge prepares the approved vendor list after vendor rating.
j) The list of approved suppliers is updated once in six months.
REVISION NO

DATE

PAGE NO

00

01.06.2011

Page 6 of 12

Safety through quality, service with commitment
AL SHIFA HOSPITAL PVT.LTD.
STANDARD OPERATING PROCEDURE
ASH/PRCHSE/SOP-11
k) The vendor rating is also communicated to the supplier by the Stores Incharge.

1)

Approval of purchase order

a) After preparing the purchase order it shall be submitted to FD for verification.
b) After verification that will be transferred to CMD for the approval.
c) Where purchasing cost is less than Rs 10,000/-, the purchase order will be approved by
the Purchase Manager himself.
d) Approved purchase order will be sent to the supplier or manufacturer.

2)

Ordering the material
a) Materials are ordered by the Purchase Manager.
b) Orders are placed through the phone/mail/direct/courier.
c) In case of costly items order shall be given directly to the vendor/supplier.

3)

Local purchase
a) Local purchases are done for less value and less quantity items.
b) In case of emergency also local purchases are done.
c) A fixed amount shall be kept in hand as cash by the Purchase Manager.
d) Local purchases are done from that cash and the bills are submitted to the Accounts
Department.
e) The expense amount is reimbursed from the accounts department.
f) The amount is by the Purchase Manager.

REVISION NO

DATE

PAGE NO

00

01.06.2011

Page 7 of 12

Safety through quality, service with commitment
AL SHIFA HOSPITAL PVT.LTD.
STANDARD OPERATING PROCEDURE
ASH/PRCHSE/SOP-11
4) Receiving and accepting goods

a) At the time of receiving materials, all the documents like Challan, Invoice, Purchase
order, Tax receipt of check posts (if applicable) etc. are checked in order to ensure the
same are tallied with all the terms and conditions of Purchase Order, Quantity, Quality,
Bill Amount, Warranty/Guarantee Certificate etc.
b) Necessary Test Reports are received for the materials, which require such test reports are
checked by the Purchase Assistant.
c) The quality of all received items including Equipments, pre printed stationary etc. are
checked and makes sure that they are up to the standard.
d) In case of chemicals, expiry date & condition of package are checked.
e) After verification, the items received are taken into the stock and computer stock is
updated.
f) The items are placed on its proper places and issues having expiry on first in first out
basis (FIFO).
g) In case of furniture & fixtures the quality of the items like gauge of the sheets used, types
of wooden materials used, painting quality, lock and key etc. are checked.

5) GRN entry
a) Once the material is accepted Goods Received Note (GRN) is entered based on the type
of material.
b) There is separate provision in software for GRN entry.
c) Purchase assistant ensures whether the material is an asset item or consumable item.
d) Entry is made based on that.
REVISION NO

DATE

PAGE NO

00

01.06.2011

Page 8 of 12

Safety through quality, service with commitment
AL SHIFA HOSPITAL PVT.LTD.
STANDARD OPERATING PROCEDURE
ASH/PRCHSE/SOP-11
e) Following columns are filled by the Purchase Assistant.
(i) Serial number
(ii) Product name

6)

Documents verification

a) Goods receipt note is attached to the in warded documents and the bill send for
verification to the Purchase Manager / Assistant HOD.
b) Assistant HOD, after verifying the documents posts the items to stock.
c) After the verification the Assistant HOD / Assistant Purchase Manager sends the bills to
the Purchase Manager for passing the bill for payment to Accounts Department.

7)

Storage of goods
a) Store Incharge is responsible for the storage of goods.
b) Accepted materials are taken into the stock and to be placed in proper location.
c) Temperature controlled items are stored at the specified temperature.
d) Chemical shall be stored in separate place.

8)

Tracking of goods
a) Storage place is labeled for each item.
b) Goods items list is hanged on every rack.
c) Goods are arranged in alphabetical order in each shelf.

REVISION NO

DATE

PAGE NO

00

01.06.2011

Page 9 of 12

Safety through quality, service with commitment
AL SHIFA HOSPITAL PVT.LTD.
STANDARD OPERATING PROCEDURE
ASH/PRCHSE/SOP-11
9)

Stock updating
a) Stock updating is done by the Store Incharge.
b) Only verified stock is entered in to the stock.
c) Inward stock shall be kept in ‘under inspection’ area.
d) Store Incharge verifies and signs the inspected items documents and that shall be
forwarded to the Purchase Manager for further verification and submission to Finance
Department for payment.

10) Stock verification
a) All received goods are kept under inspection.
b) Store keeper verifies all the items.
c) Any damaged or mismatching items are rejected.
d) Rejected items are transferred to the ‘rejected items’ area.

11) Stock maintenance
a) Store Incharge is maintains the stock level.
b) Store Incharge takes necessary stock reports periodically and counter verifies the physical
stock with system stock.
c) He monitors the re-order level and gives proper intimation to purchase in charges for
material to be procured on daily basis.
d) The items, which are very urgent in nature, are intimated to the Purchase Manager
immediately on getting the request from the indenter.
e) Minimum stock level shall be maintained for the short period stable materials.
f) Physical verification of stock is carried out and the periodicity of the verification is in
accordance with the classification of the items.
REVISION NO

DATE

PAGE NO

00

01.06.2011

Page 10 of 12

Safety through quality, service with commitment
AL SHIFA HOSPITAL PVT.LTD.
STANDARD OPERATING PROCEDURE
ASH/PRCHSE/SOP-11
i. Item A- High value items- every month
ii. Item B- Moderate value items- once in 2 months
iii. Item C- Low costs items- Once in 3 months

12) Expiry checking
a) Store Incharge assigns the staff for expiry checking.
b) Expiry of items is checked at the end of month.
c) Entire items are checked for out of date.
d) Before opening new kit/reagent, expiry is checked.
e) Near expiry items are send back to the supplier.
f) The period of near expiry shall be defined and prefixed.

13) Material issue
a) Ready stock items are issued to the indenters based on their indents within the time limit.
b) Materials are issued on FIFO basis.
c) Old stock/useless items are removed from the storage place.
d) Materials are issued based on the consumption of the end user.
e) Consumption patterns are monitored periodically and proper alerting measures to be
taken on that department, to avoid improper utilization.
f) Reports which are essential to monitor the consumption pattern are taken periodically.

14) Returning of materials to stores
1. If any material is returned to stores by departments, the materials received are visually
inspected, received and the Stock Register is up dated.
2. The reason for return of material is specified in Stock Register.
REVISION NO

DATE

PAGE NO

00

01.06.2011

Page 11 of 12

Safety through quality, service with commitment
AL SHIFA HOSPITAL PVT.LTD.
STANDARD OPERATING PROCEDURE
ASH/PRCHSE/SOP-11

15) Disposal of damaged or expired items
a) Damaged and expired items are disposed in time.
b) Disposal is done with the permission of Managing Director.
c) Near expiry items are replaced from the supplier if possible.

1. PROCEDURE FOR CONTROL OF RECORDS

SL NO.

RECORDS

NO.

1

Purchase Indent

ASH/ADM/STR-01

2

Local Purchase Order(Large) Comparative Statement

ASH/ADM/STR-02L

3

Local Purchase Order(Small)

ASH/ADM/STR-02S

4

Approved List of Suppliers GRN

ASH/ADM/STR-03

5

Supplier Capability Report

ASH/ADM/STR-04

6

Supplier Evaluation Report

ASH/ADM/STR-05

7

Comparative Statement

ASH/ADM/STR-06

9

Electronic Media Records are maintained for GRN and Stock Register.

REVISION NO

DATE

PAGE NO

00

01.06.2011

Page 12 of 12

Safety through quality, service with commitment

More Related Content

What's hot

Purchase & Materials Management ppt.
Purchase & Materials Management ppt.Purchase & Materials Management ppt.
Purchase & Materials Management ppt.tanaisha
 
MATERIAL PURCHASING PROCEDURES
MATERIAL PURCHASING PROCEDURESMATERIAL PURCHASING PROCEDURES
MATERIAL PURCHASING PROCEDURESParas Joshi
 
Purchasing and procurement in Material management
 Purchasing and procurement in Material management Purchasing and procurement in Material management
Purchasing and procurement in Material managementKaustubh Vartak
 
Inventory management
Inventory managementInventory management
Inventory managementsanjaypapu
 
Vendor selection
Vendor selectionVendor selection
Vendor selectionaqsa fatima
 
Warehousing & Material management
Warehousing & Material managementWarehousing & Material management
Warehousing & Material managementTeny Thomas
 
Purchase Presentation 1
Purchase Presentation 1Purchase Presentation 1
Purchase Presentation 1prateekbubai
 
purchasing process
purchasing processpurchasing process
purchasing processonearbaein
 
Inventory management rqm, eoq, im
Inventory management rqm, eoq, imInventory management rqm, eoq, im
Inventory management rqm, eoq, imchiranjibi68
 
Complaints in Quality Management System
Complaints in Quality Management SystemComplaints in Quality Management System
Complaints in Quality Management SystemMayuriMore15
 
Handling of waste and Scrap disposal
Handling of waste and Scrap disposalHandling of waste and Scrap disposal
Handling of waste and Scrap disposalganpat420
 
STORE MANAGEMENT TRAINING
STORE MANAGEMENT TRAININGSTORE MANAGEMENT TRAINING
STORE MANAGEMENT TRAININGCollins Nweke
 

What's hot (20)

Store Inventory
Store InventoryStore Inventory
Store Inventory
 
Purchase & Materials Management ppt.
Purchase & Materials Management ppt.Purchase & Materials Management ppt.
Purchase & Materials Management ppt.
 
Gmp checklist
Gmp checklistGmp checklist
Gmp checklist
 
warehousing[1]
 warehousing[1] warehousing[1]
warehousing[1]
 
MATERIAL PURCHASING PROCEDURES
MATERIAL PURCHASING PROCEDURESMATERIAL PURCHASING PROCEDURES
MATERIAL PURCHASING PROCEDURES
 
Purchasing and procurement in Material management
 Purchasing and procurement in Material management Purchasing and procurement in Material management
Purchasing and procurement in Material management
 
Inventory management
Inventory managementInventory management
Inventory management
 
Vendor selection
Vendor selectionVendor selection
Vendor selection
 
Warehousing & Material management
Warehousing & Material managementWarehousing & Material management
Warehousing & Material management
 
Purchase order
Purchase orderPurchase order
Purchase order
 
Purchase Presentation 1
Purchase Presentation 1Purchase Presentation 1
Purchase Presentation 1
 
purchasing process
purchasing processpurchasing process
purchasing process
 
Bin card
Bin cardBin card
Bin card
 
Good warehouse practice
Good warehouse practiceGood warehouse practice
Good warehouse practice
 
Inventory management rqm, eoq, im
Inventory management rqm, eoq, imInventory management rqm, eoq, im
Inventory management rqm, eoq, im
 
Complaints in Quality Management System
Complaints in Quality Management SystemComplaints in Quality Management System
Complaints in Quality Management System
 
Purchase management
Purchase managementPurchase management
Purchase management
 
Handling of waste and Scrap disposal
Handling of waste and Scrap disposalHandling of waste and Scrap disposal
Handling of waste and Scrap disposal
 
Inventory control techniques
Inventory control techniquesInventory control techniques
Inventory control techniques
 
STORE MANAGEMENT TRAINING
STORE MANAGEMENT TRAININGSTORE MANAGEMENT TRAINING
STORE MANAGEMENT TRAINING
 

Similar to Purchase sop

Procurement of supplies and equipment's
Procurement of supplies and equipment'sProcurement of supplies and equipment's
Procurement of supplies and equipment'sAnkitaKadam20
 
20200723211644D3064_NEW Ses1112 Chap13 The Expenditure Cycle - Purchasing to ...
20200723211644D3064_NEW Ses1112 Chap13 The Expenditure Cycle - Purchasing to ...20200723211644D3064_NEW Ses1112 Chap13 The Expenditure Cycle - Purchasing to ...
20200723211644D3064_NEW Ses1112 Chap13 The Expenditure Cycle - Purchasing to ...koranberita11
 
AMITHYA HOTELS & RESORTS POLICIES & PROCEDURES STANDARD OPERATING PROCEDURE
AMITHYA HOTELS & RESORTS POLICIES & PROCEDURES STANDARD OPERATING PROCEDUREAMITHYA HOTELS & RESORTS POLICIES & PROCEDURES STANDARD OPERATING PROCEDURE
AMITHYA HOTELS & RESORTS POLICIES & PROCEDURES STANDARD OPERATING PROCEDUREDulini2
 
Procedure for purchasing, purchasing orders, and selection of suppliers
Procedure for purchasing, purchasing orders, and selection of suppliersProcedure for purchasing, purchasing orders, and selection of suppliers
Procedure for purchasing, purchasing orders, and selection of suppliersQusi Alqarqaz
 
Working capital management 3
Working capital management 3Working capital management 3
Working capital management 3RS P
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualificationDeekshitha HS
 
Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production departmentPRANJAY PATIL
 
Si quality manual
Si quality manualSi quality manual
Si quality manualrusyare
 
Materials management purchasing
Materials management purchasingMaterials management purchasing
Materials management purchasingPritesh Gharat
 
Audit of Purchases
Audit of PurchasesAudit of Purchases
Audit of PurchasesAdmin SBS
 
RDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni RanjanRDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni RanjanRajni Ranjan
 
Rdso vendor registration guideline
Rdso vendor registration guidelineRdso vendor registration guideline
Rdso vendor registration guidelineSamsher Singh
 
Control of Records Procedure for Legal Practices
Control of Records Procedure for Legal PracticesControl of Records Procedure for Legal Practices
Control of Records Procedure for Legal PracticesVal Antoff
 

Similar to Purchase sop (20)

Purchase process
Purchase   processPurchase   process
Purchase process
 
Procurement of supplies and equipment's
Procurement of supplies and equipment'sProcurement of supplies and equipment's
Procurement of supplies and equipment's
 
20200723211644D3064_NEW Ses1112 Chap13 The Expenditure Cycle - Purchasing to ...
20200723211644D3064_NEW Ses1112 Chap13 The Expenditure Cycle - Purchasing to ...20200723211644D3064_NEW Ses1112 Chap13 The Expenditure Cycle - Purchasing to ...
20200723211644D3064_NEW Ses1112 Chap13 The Expenditure Cycle - Purchasing to ...
 
AMITHYA HOTELS & RESORTS POLICIES & PROCEDURES STANDARD OPERATING PROCEDURE
AMITHYA HOTELS & RESORTS POLICIES & PROCEDURES STANDARD OPERATING PROCEDUREAMITHYA HOTELS & RESORTS POLICIES & PROCEDURES STANDARD OPERATING PROCEDURE
AMITHYA HOTELS & RESORTS POLICIES & PROCEDURES STANDARD OPERATING PROCEDURE
 
Sngpl
SngplSngpl
Sngpl
 
Procedure for purchasing, purchasing orders, and selection of suppliers
Procedure for purchasing, purchasing orders, and selection of suppliersProcedure for purchasing, purchasing orders, and selection of suppliers
Procedure for purchasing, purchasing orders, and selection of suppliers
 
Material Cost.pptx
Material Cost.pptxMaterial Cost.pptx
Material Cost.pptx
 
Working capital management 3
Working capital management 3Working capital management 3
Working capital management 3
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualification
 
PROCUREMENT
PROCUREMENTPROCUREMENT
PROCUREMENT
 
Project
ProjectProject
Project
 
Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production department
 
Control of Receipts
Control of ReceiptsControl of Receipts
Control of Receipts
 
Si quality manual
Si quality manualSi quality manual
Si quality manual
 
Module-10.pptx
Module-10.pptxModule-10.pptx
Module-10.pptx
 
Materials management purchasing
Materials management purchasingMaterials management purchasing
Materials management purchasing
 
Audit of Purchases
Audit of PurchasesAudit of Purchases
Audit of Purchases
 
RDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni RanjanRDSO Guidelines for new Vendors- Rajni Ranjan
RDSO Guidelines for new Vendors- Rajni Ranjan
 
Rdso vendor registration guideline
Rdso vendor registration guidelineRdso vendor registration guideline
Rdso vendor registration guideline
 
Control of Records Procedure for Legal Practices
Control of Records Procedure for Legal PracticesControl of Records Procedure for Legal Practices
Control of Records Procedure for Legal Practices
 

Purchase sop

  • 1. AL SHIFA HOSPITAL PVT.LTD. STANDARD OPERATING PROCEDURE ASH/PRCHSE/SOP-11 INDEX SL. NO. 1 2 3 4 PARTICULARS PURPOSE SCOPE RESPONSIBILITY PROCEDURES i. ii. iii. iv. v. vi. vii. viii. ix. x. xi. xii. xiii. xiv. xv. xvi. xvii. xviii. xix. xx. xxi. xxii. 5 6 PAGE NO. 2 2 2 3-11 Reasons for purchase Collection of quotation Replacement of existing Item New Purchase Purchase committee Purchase order preparation Evaluation of suppliers Approval of purchase order Ordering the material Local purchase Receiving and accepting goods GRN entry Documents verification Storage of goods Tracking of goods Stock updating Stock verification Stock maintenance Expiry checking Material issue Returning of materials Disposal of damaged or expired items PROCEDURE FOR CONTROL OF RECORDS ANNEXURES 1. ORGANIZATION CHART - Organization chart (ASH/ADM/HRD-09) Revision no.:01, revised on 01/01/2012has attached as annexure-1 2. ACTIVITY FLOW CHART-1 (ASH/PRCHSE/FCHRT-10) 3. ACTIVITY FLOWCHART-2 (ASH/PRCHSE/FCHRT-11) 4. APPROVED LIST OF SUPPLIERS (ASH/ADM/STR-03) 5. SUPPLIER EVALUATION REPORT(ASH/ADM/STR-05) 12 REVISION NO DATE PAGE NO 00 01.06.2011 Page 1 of 12 Safety through quality, service with commitment
  • 2. AL SHIFA HOSPITAL PVT.LTD. STANDARD OPERATING PROCEDURE ASH/PRCHSE/SOP-11 1. PURPOSE To lay down a procedure for purchasing and to evaluate suppliers, rate and develop them so as to select suppliers on the basis of their ability to meet the quality requirements. 2. SCOPE This procedure covers, a) Purchase of items such as Equipments, Instruments, Furniture, Office Stationary, Spares, and Consumables. b) Registration of Potential suppliers c) Evaluation and development of existing suppliers. 3. RESPONSIBILITIES Collection of quotation – Purchase Assistant Preparation of purchase order – Purchase Manager Approval of purchase order – Managing Director / Finance Director Evaluation of suppliers – Purchase Manager Storage of items – Store Incharge REVISION NO DATE PAGE NO 00 01.06.2011 Page 2 of 12 Safety through quality, service with commitment
  • 3. AL SHIFA HOSPITAL PVT.LTD. STANDARD OPERATING PROCEDURE ASH/PRCHSE/SOP-11 4. PROCEDURES 1. Reasons for purchase An item purchase request is raised with different intentions such as :  A new item to replace an existing obsolete /damaged item.  An item which is already in use but additional ones are needed to meet the complete requirement.  A new item to facilitate a function that was done manually/ not done till date. 2. Collection of quotation a) A user/user department raises a request for an item, which shall be furnished with the proposed use, users, functional specifications, safety specifications if required, as well as the brands available in certain cases. b) The purchase manager scrutinizes the requirement in terms of cost, criticality of the requirement, quality of product, service and spares availability, vendor/supplier status, and initiates the communication with the vendors. Where the cost comes within his authorization for initiating purchase orders, he initiates the process. Where the cost exceeds his authority to decide, he puts it up to the purchase committee and finance department to decide. 3. Replacement of an existing item: If the intention of purchase is replacement of an item which was in use, the condemnation note is verified. If the condemnation note is not submitted, it is prepared. REVISION NO DATE PAGE NO 00 01.06.2011 Page 3 of 12 Safety through quality, service with commitment
  • 4. AL SHIFA HOSPITAL PVT.LTD. STANDARD OPERATING PROCEDURE ASH/PRCHSE/SOP-11 The condemnation note is submitted to the condemnation committee. If the committee approves, and gives it in writing, then the purchase manager proceeds with the purchase order. If the committee rejects condemnation, then the user is informed the same, in writing explaining this as the ground of denial in purchasing the requested item. 4. New purchase: Where the item is a new purchase, the specification report is put for approval from the purchase committee. The committee considers the requirement for discussion in the meeting thereafter convened, scrutinizes the requirement against set parameters and accepted practices, and if found necessary, approves the requirement. The purchase manager subsequently prepares the purchase order. If the committee rejects the requirement then the user is informed the same, in writing explaining this as the ground of denial in purchasing the requested item. 5. Purchase committee The purchase committee Members are, 1) Medical Equipments and Machineries 1) Managing Director / Finance Director 2) Purchase Manager 3) Store Incharge 4) Biomedical Engineer 5) End user / Indenter 2) Maintenance & Electrical Equipment and Machineries 1) Managing Director / Finance Director 2) Purchase Manager 3) Store Incharge 4) Maintenance Engineer REVISION NO DATE PAGE NO 00 01.06.2011 Page 4 of 12 Safety through quality, service with commitment
  • 5. AL SHIFA HOSPITAL PVT.LTD. STANDARD OPERATING PROCEDURE ASH/PRCHSE/SOP-11 5) End user / Indenter 6. Purchase order preparation a) Purchase Manager prepares the purchase order. b) Purchase order is placed only for suppliers from the approved list. c) Purchase order contains the following information  Clear description of goods/services to be procured  Quantity rate and value  Requirement of test certificates, if any  Delivery schedule  Mode of dispatch and payment terms  Inspection clauses d) Purchase order is verified and reviewed for its completeness by Finance Director if the cost exceeds Rs 10,000 and then approved by CMD. e) Copies of purchase order are distributed to Stores and Accounts Departments. 7. Evaluation of suppliers a) The Store Incharge makes a note about the quality of the product and delivery performance of the vendor for Vendor rating. b) The supplier is evaluated once in six months with reference to the Vendor Evaluation Rating Criteria. Existing suppliers are evaluated based on their past performance generally according to the following parameters Quality Rating (QR) = Quantity / No. Accepted 80 = 80 Max. REVISION NO DATE PAGE NO 00 01.06.2011 Page 5 of 12 Safety through quality, service with commitment
  • 6. AL SHIFA HOSPITAL PVT.LTD. STANDARD OPERATING PROCEDURE ASH/PRCHSE/SOP-11 Quantity / No. Supplied Delivery Rating (DR) = 10/15/20 = 20 Max. 20 = Supply total quantity of materials on or before the agreed date. 15 = Supply total quantity/number of materials within 7 days from the expiry of agreed date.  Those who score (QR+DR) equal to or greater than 70 will find a place in the approved list.  Those who score less than 70 require action for improvement.  Purchase Manager gives guidance to the suppliers to improve their performance.  After taking corrective measures these suppliers are evaluated again.  If the score is below 70, the names of such suppliers are removed from the approved list. c) If the supplier is found acceptable, then the supplier is included in the Approved Vendor List. d) If the supplier is not acceptable, the same is informed to the supplier through a letter. e) Stores Incharge maintains the details of the delivery performance of the vendor such as quality supplied, actual date of delivery and quantity accepted through Delivery challan. f) The details are recorded in the Vendor Rating Form. g) The acceptance rate is calculated as explained in the Vendor Rating Form. h) Based on the Vendor Rating, the decision regarding the acceptance or removal of the supplier from the Approved Vendor List is made by the Store Incharge, with the approval of Managing Director. i) The Store Incharge prepares the approved vendor list after vendor rating. j) The list of approved suppliers is updated once in six months. REVISION NO DATE PAGE NO 00 01.06.2011 Page 6 of 12 Safety through quality, service with commitment
  • 7. AL SHIFA HOSPITAL PVT.LTD. STANDARD OPERATING PROCEDURE ASH/PRCHSE/SOP-11 k) The vendor rating is also communicated to the supplier by the Stores Incharge. 1) Approval of purchase order a) After preparing the purchase order it shall be submitted to FD for verification. b) After verification that will be transferred to CMD for the approval. c) Where purchasing cost is less than Rs 10,000/-, the purchase order will be approved by the Purchase Manager himself. d) Approved purchase order will be sent to the supplier or manufacturer. 2) Ordering the material a) Materials are ordered by the Purchase Manager. b) Orders are placed through the phone/mail/direct/courier. c) In case of costly items order shall be given directly to the vendor/supplier. 3) Local purchase a) Local purchases are done for less value and less quantity items. b) In case of emergency also local purchases are done. c) A fixed amount shall be kept in hand as cash by the Purchase Manager. d) Local purchases are done from that cash and the bills are submitted to the Accounts Department. e) The expense amount is reimbursed from the accounts department. f) The amount is by the Purchase Manager. REVISION NO DATE PAGE NO 00 01.06.2011 Page 7 of 12 Safety through quality, service with commitment
  • 8. AL SHIFA HOSPITAL PVT.LTD. STANDARD OPERATING PROCEDURE ASH/PRCHSE/SOP-11 4) Receiving and accepting goods a) At the time of receiving materials, all the documents like Challan, Invoice, Purchase order, Tax receipt of check posts (if applicable) etc. are checked in order to ensure the same are tallied with all the terms and conditions of Purchase Order, Quantity, Quality, Bill Amount, Warranty/Guarantee Certificate etc. b) Necessary Test Reports are received for the materials, which require such test reports are checked by the Purchase Assistant. c) The quality of all received items including Equipments, pre printed stationary etc. are checked and makes sure that they are up to the standard. d) In case of chemicals, expiry date & condition of package are checked. e) After verification, the items received are taken into the stock and computer stock is updated. f) The items are placed on its proper places and issues having expiry on first in first out basis (FIFO). g) In case of furniture & fixtures the quality of the items like gauge of the sheets used, types of wooden materials used, painting quality, lock and key etc. are checked. 5) GRN entry a) Once the material is accepted Goods Received Note (GRN) is entered based on the type of material. b) There is separate provision in software for GRN entry. c) Purchase assistant ensures whether the material is an asset item or consumable item. d) Entry is made based on that. REVISION NO DATE PAGE NO 00 01.06.2011 Page 8 of 12 Safety through quality, service with commitment
  • 9. AL SHIFA HOSPITAL PVT.LTD. STANDARD OPERATING PROCEDURE ASH/PRCHSE/SOP-11 e) Following columns are filled by the Purchase Assistant. (i) Serial number (ii) Product name 6) Documents verification a) Goods receipt note is attached to the in warded documents and the bill send for verification to the Purchase Manager / Assistant HOD. b) Assistant HOD, after verifying the documents posts the items to stock. c) After the verification the Assistant HOD / Assistant Purchase Manager sends the bills to the Purchase Manager for passing the bill for payment to Accounts Department. 7) Storage of goods a) Store Incharge is responsible for the storage of goods. b) Accepted materials are taken into the stock and to be placed in proper location. c) Temperature controlled items are stored at the specified temperature. d) Chemical shall be stored in separate place. 8) Tracking of goods a) Storage place is labeled for each item. b) Goods items list is hanged on every rack. c) Goods are arranged in alphabetical order in each shelf. REVISION NO DATE PAGE NO 00 01.06.2011 Page 9 of 12 Safety through quality, service with commitment
  • 10. AL SHIFA HOSPITAL PVT.LTD. STANDARD OPERATING PROCEDURE ASH/PRCHSE/SOP-11 9) Stock updating a) Stock updating is done by the Store Incharge. b) Only verified stock is entered in to the stock. c) Inward stock shall be kept in ‘under inspection’ area. d) Store Incharge verifies and signs the inspected items documents and that shall be forwarded to the Purchase Manager for further verification and submission to Finance Department for payment. 10) Stock verification a) All received goods are kept under inspection. b) Store keeper verifies all the items. c) Any damaged or mismatching items are rejected. d) Rejected items are transferred to the ‘rejected items’ area. 11) Stock maintenance a) Store Incharge is maintains the stock level. b) Store Incharge takes necessary stock reports periodically and counter verifies the physical stock with system stock. c) He monitors the re-order level and gives proper intimation to purchase in charges for material to be procured on daily basis. d) The items, which are very urgent in nature, are intimated to the Purchase Manager immediately on getting the request from the indenter. e) Minimum stock level shall be maintained for the short period stable materials. f) Physical verification of stock is carried out and the periodicity of the verification is in accordance with the classification of the items. REVISION NO DATE PAGE NO 00 01.06.2011 Page 10 of 12 Safety through quality, service with commitment
  • 11. AL SHIFA HOSPITAL PVT.LTD. STANDARD OPERATING PROCEDURE ASH/PRCHSE/SOP-11 i. Item A- High value items- every month ii. Item B- Moderate value items- once in 2 months iii. Item C- Low costs items- Once in 3 months 12) Expiry checking a) Store Incharge assigns the staff for expiry checking. b) Expiry of items is checked at the end of month. c) Entire items are checked for out of date. d) Before opening new kit/reagent, expiry is checked. e) Near expiry items are send back to the supplier. f) The period of near expiry shall be defined and prefixed. 13) Material issue a) Ready stock items are issued to the indenters based on their indents within the time limit. b) Materials are issued on FIFO basis. c) Old stock/useless items are removed from the storage place. d) Materials are issued based on the consumption of the end user. e) Consumption patterns are monitored periodically and proper alerting measures to be taken on that department, to avoid improper utilization. f) Reports which are essential to monitor the consumption pattern are taken periodically. 14) Returning of materials to stores 1. If any material is returned to stores by departments, the materials received are visually inspected, received and the Stock Register is up dated. 2. The reason for return of material is specified in Stock Register. REVISION NO DATE PAGE NO 00 01.06.2011 Page 11 of 12 Safety through quality, service with commitment
  • 12. AL SHIFA HOSPITAL PVT.LTD. STANDARD OPERATING PROCEDURE ASH/PRCHSE/SOP-11 15) Disposal of damaged or expired items a) Damaged and expired items are disposed in time. b) Disposal is done with the permission of Managing Director. c) Near expiry items are replaced from the supplier if possible. 1. PROCEDURE FOR CONTROL OF RECORDS SL NO. RECORDS NO. 1 Purchase Indent ASH/ADM/STR-01 2 Local Purchase Order(Large) Comparative Statement ASH/ADM/STR-02L 3 Local Purchase Order(Small) ASH/ADM/STR-02S 4 Approved List of Suppliers GRN ASH/ADM/STR-03 5 Supplier Capability Report ASH/ADM/STR-04 6 Supplier Evaluation Report ASH/ADM/STR-05 7 Comparative Statement ASH/ADM/STR-06 9 Electronic Media Records are maintained for GRN and Stock Register. REVISION NO DATE PAGE NO 00 01.06.2011 Page 12 of 12 Safety through quality, service with commitment