• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
Utah’s Premier Revised
 

Utah’s Premier Revised

on

  • 775 views

Utah’s Premier Revised

Utah’s Premier Revised

Statistics

Views

Total Views
775
Views on SlideShare
674
Embed Views
101

Actions

Likes
0
Downloads
0
Comments
0

3 Embeds 101

http://www.intermountainplantings.com 69
http://intermountainplantings.com 24
http://02d0598.netsolhost.com 8

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment
  • -17 Years of experience Kyle and Erik founders ESOP 2008 Utah’s largest landscape contractor Small enhancements to multi-million dollar projects

Utah’s Premier Revised Utah’s Premier Revised Presentation Transcript

  • Presented by: Mike Sowby – General Manager Jason Harr – Project Manager Jason Denham – Site Manager
    • Major Projects
    • LEED® (Green) Certified Projects
    • Rooftop Gardens (Vegetated Roof Surfaces)
    • Sub- Surface Drip Irrigation
    • Intermountain Health Care Hospital - Murray
    • 1,100 Trees 67,000 Shrubs
    • Contract Amount: $2.5 Million
    • Project under $50,000
    • LEED® (Green) Certified Project
    • Sub Surface Drip Irrigation
    • Close to 40 acres of sub-surface drip irrigation
    • Contract Amount: $4.5 Million
    • Rooftop Gardens using Utelite e-soil
    • LEED® (Green) Certified Project
  • I-215 and Redwood Pleasant Grove Exit Legacy Parkway
    • 12 Acres of Landscaping
    • To be completed mid-year 2009
    • Sample of Current Properties
    • Warranty
    • Owner Relationships
  •  
  •  
  •  
  •  
  •  
    • Accurate Bids
    • Value Engineering
    • Design / Build
    • Budget Numbers
    • Value Engineering
    • Design – Build
    • Budget Numbers
    • AP – 300 3” Bronze Ball Valve
      • $234.48
    • BV – 300 3” Bronze Ball Valve
      • $80.57
    • Hard Hats on every job
    • Bright Safety Vest with Logo
    • Safety Glasses
  •  
    • We have over 250 years of landscape industry experience
    • within our management team.
  •