Primavera project planner

62

Published on

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
62
On Slideshare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
2
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. ActivityIDActivityDescriptionOrigDurRemDurEarlyStartEarlyFinishPredecessors Resource BudgetedCost101 Site Cleaning 1 1 17DEC12 17DEC12 LABOUR 800.00111 Excavation 2 2 18DEC12 19DEC12 101* EXCAVATR 2,000.00121 PCC 2 2 20DEC12 21DEC12 111* CONCRETE 17,700.00131 Foundation 4 4 24DEC12 27DEC12 121* RCC 20,000.00141 Plinth Column 4 4 28DEC12 02JAN13 131* RCC 10,000.00151 Plinth Beam 5 5 03JAN13 09JAN13 141* RCC 28,000.00161 Filling 1 1 10JAN13 10JAN13 151* SAND 36,000.00171 GL Column 5 5 11JAN13 17JAN13 161* RCC 20,700.00181 GL Beam and GL Slab 5 5 18JAN13 24JAN13 171* RCC 82,000.00191 FL Column 6 6 25JAN13 01FEB13 181* RCC 20,700.00211 GL Brickwork 4 4 25JAN13 30JAN13 181* BRICK 98,502.00201 FL Beam and FL Slab 6 6 04FEB13 11FEB13 191* RCC 83,000.00261 Window Steel Mesh 10 10 04FEB13 15FEB13 191* STEEL 40,000.00221 FL Brickwork 4 4 12FEB13 15FEB13 201* BRICK 102,000.00251 Electricity Fitting 5 5 12FEB13 18FEB13 201* WIRE 68,000.00351 Plumbing 4 4 18FEB13 21FEB13 221* PIPE 68,220.00331 Compond Wall 5 5 18FEB13 22FEB13 221* BRICK 3,500.00281 External Plastering 9 9 22FEB13 06MAR13 351* CEMENT 25,800.00291 Tiles & Dadoo 14 14 25FEB13 14MAR13 331* TILES 56,020.00271 FL Internal Plastering 6 6 22FEB13 01MAR13 351* CEMENT 12,000.00341 GL Internal Plastering 5 5 14FEB13 20FEB13 351* CEMENT 10,000.00301 Kitchen Otta 3 3 25FEB13 27FEB13 331* MARBLE 25,800.00311 Doors and Window 6 6 07MAR13 14MAR13 281* WOOD 85,000.00321 Colouring 7 7 11MAR13 19MAR13 311* PAINT 89,500.002012 2013DEC JAN FEB MAR APR MAY17 24 31 7 14 21 28 4 11 18 25 4 11 18 25 1 8 15 22 29 6 13Site CleaningExcavationPCCFoundationPlinth ColumnPlinth BeamFillingGL ColumnGL Beam and GL SlabFL ColumnGL BrickworkFL Beam and FL SlabWindow Steel MeshFL BrickworkElectricity FittingPlumbingCompond WallExternal PlasteringTiles & DadooFL Internal PlasteringGL Internal PlasteringKitchen OttaDoors and WindowColouring© Primavera Systems, Inc.Start Date 17DEC12Finish Date 27MAR13Data Date 17DEC12Run Date 30APR13 15:46Early BarFloat BarProgress BarCritical ActivityABCDProject completerahu Kish Nikh Sank AshuClassic Schedule LayoutSheet 1 of 1Date Revision Checked Approved

×