Primavera project planner
Upcoming SlideShare
Loading in...5
×

Like this? Share it with your network

Share

Primavera project planner

  • 313 views
Uploaded on

 

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
313
On Slideshare
313
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
1
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. ActivityIDActivityDescriptionOrigDurRemDurEarlyStartEarlyFinishPredecessors Resource BudgetedCost101 Site Cleaning 1 1 17DEC12 17DEC12 LABOUR 800.00111 Excavation 2 2 18DEC12 19DEC12 101* EXCAVATR 2,000.00121 PCC 2 2 20DEC12 21DEC12 111* CONCRETE 17,700.00131 Foundation 4 4 24DEC12 27DEC12 121* RCC 20,000.00141 Plinth Column 4 4 28DEC12 02JAN13 131* RCC 10,000.00151 Plinth Beam 5 5 03JAN13 09JAN13 141* RCC 28,000.00161 Filling 1 1 10JAN13 10JAN13 151* SAND 36,000.00171 GL Column 5 5 11JAN13 17JAN13 161* RCC 20,700.00181 GL Beam and GL Slab 5 5 18JAN13 24JAN13 171* RCC 82,000.00191 FL Column 6 6 25JAN13 01FEB13 181* RCC 20,700.00211 GL Brickwork 4 4 25JAN13 30JAN13 181* BRICK 98,502.00201 FL Beam and FL Slab 6 6 04FEB13 11FEB13 191* RCC 83,000.00261 Window Steel Mesh 10 10 04FEB13 15FEB13 191* STEEL 40,000.00221 FL Brickwork 4 4 12FEB13 15FEB13 201* BRICK 102,000.00251 Electricity Fitting 5 5 12FEB13 18FEB13 201* WIRE 68,000.00351 Plumbing 4 4 18FEB13 21FEB13 221* PIPE 68,220.00331 Compond Wall 5 5 18FEB13 22FEB13 221* BRICK 3,500.00281 External Plastering 9 9 22FEB13 06MAR13 351* CEMENT 25,800.00291 Tiles & Dadoo 14 14 25FEB13 14MAR13 331* TILES 56,020.00271 FL Internal Plastering 6 6 22FEB13 01MAR13 351* CEMENT 12,000.00341 GL Internal Plastering 5 5 14FEB13 20FEB13 351* CEMENT 10,000.00301 Kitchen Otta 3 3 25FEB13 27FEB13 331* MARBLE 25,800.00311 Doors and Window 6 6 07MAR13 14MAR13 281* WOOD 85,000.00321 Colouring 7 7 11MAR13 19MAR13 311* PAINT 89,500.002012 2013DEC JAN FEB MAR APR MAY17 24 31 7 14 21 28 4 11 18 25 4 11 18 25 1 8 15 22 29 6 13Site CleaningExcavationPCCFoundationPlinth ColumnPlinth BeamFillingGL ColumnGL Beam and GL SlabFL ColumnGL BrickworkFL Beam and FL SlabWindow Steel MeshFL BrickworkElectricity FittingPlumbingCompond WallExternal PlasteringTiles & DadooFL Internal PlasteringGL Internal PlasteringKitchen OttaDoors and WindowColouring© Primavera Systems, Inc.Start Date 17DEC12Finish Date 27MAR13Data Date 17DEC12Run Date 30APR13 15:46Early BarFloat BarProgress BarCritical ActivityABCDProject completerahu Kish Nikh Sank AshuClassic Schedule LayoutSheet 1 of 1Date Revision Checked Approved