• Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
SUSI - Energy Learnings from Energy Savings by Patrick Fankhauser at GIB Summit
 

SUSI - Energy Learnings from Energy Savings by Patrick Fankhauser at GIB Summit

on

  • 434 views

Presented at the 4th Global Infrastructure Basel Summit 21 & 22 May 2014. ...

Presented at the 4th Global Infrastructure Basel Summit 21 & 22 May 2014.
Read more about the world leading platform for Sustainable Infrastructure Finance at www.gib-foundation.org.
Next Summit: 27 & 28 May 2015 in Switzerland

Statistics

Views

Total Views
434
Views on SlideShare
135
Embed Views
299

Actions

Likes
0
Downloads
9
Comments
0

3 Embeds 299

http://www.gib-foundation.org 291
http://www.slideee.com 7
http://www.google.com 1

Accessibility

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment
  • To best explain how to use Criteria for Measuring and Monitoring Impact we choosen a project with the Government of Monaco. <br /> <br /> XXXX
  • Monaco had a clear goal for their Tender: <br /> They wanted to save energy costs and the wanted to reduce their carbon footprint to meet Monacos Kioto targets. <br /> <br /> -> Tender on total cost of Ownership e.g. total net energy savings for Monaco and tender including all costs. This means besides costs to upgrade equipment also all project management costs, maintenance costs and financing costs are included in project <br /> <br /> -> The payments to Johnson Controls and SUSI Partners depend entirely on realized savings. Minimum savings are guaranteed by Johnson Controls <br /> <br /> -> Tender hat a very clear evaluation criteria, e.g. biders competed on total financial savings over entire life of equipment plus on Carbon Savings they guarantee. <br /> <br /> -> Essential to exactly define how savings are measured e.g. <br /> - Clear baseline <br /> - Clear measurement of savings <br /> - Clearly defined parameters how to operate the buildings <br /> <br /> We clearly see, that with such an approach, siginficantly higher and guaranteed savings can be achieved, compared to a normal equipment upgrade tender.
  • 4

SUSI - Energy Learnings from Energy Savings by Patrick Fankhauser at GIB Summit SUSI - Energy Learnings from Energy Savings by Patrick Fankhauser at GIB Summit Presentation Transcript

  • SUSI Energy Efficiency Fund Page 1GIB Summit 2014 – Learnings from Energy-Efficiency Contracts for Buildings in Monaco Learnings from Energy Savings Contract for Buildings in Monaco Miguel Saenz, Director, SUSI Energy Efficiency Fund GIB Summit 2014, Workshop 5
  • SUSI Energy Efficiency Fund Page 2GIB Summit 2014 – Learnings from Energy-Efficiency Contracts for Buildings in Monaco Key Information  Project: Building retrofit of 5 buildings  Project Structure: Energy Savings Contract with guaranteed savings  Public Tender  Technology Partner: Johnson Controls  Building owner: Principality of Monaco  Project duration: 12 years  Investment volume: EUR 870k Successful Energy Savings Project with Monaco and Johnson Controls Energy consumption - 23% Energy Costs - 27% CO2 output - 35%
  • SUSI Energy Efficiency Fund Page 3GIB Summit 2014 – Learnings from Energy-Efficiency Contracts for Buildings in Monaco Right Contractual Set-up and Clear Objectives of Tender Essential  Energy cost savings guaranteed by Johnson Controls over 12 years contract duration  All costs included in tender (installation, financing, maintenance)  Clear definition on how savings are measured  Clear definition how buildings need to be operated  Clear definition of evaluation criteria e.g. financial benefit versus carbon reduction Financing Investment EUR 870k Retrofit Guaranteed Savings Share of savings Share of savings Technology Partner Reduction to EUR 480k Total Savings EUR 177k Annual Energy Costs EUR 657k Property Owner
  • SUSI Energy Efficiency Fund Page 4GIB Summit 2014 – Learnings from Energy-Efficiency Contracts for Buildings in Monaco General Learnings from Energy Efficiency Projects Analyzed Measuring and Monitoring complex Key Issues seen in Measuring and Monitoring Impact Performance based contracts improve sustainability Clear objectives and evaluation criteria Fair allocation of risks There is no perfect measuring and monitoring Hard guarantees important
  • SUSI Energy Efficiency Fund Page 5GIB Summit 2014 – Learnings from Energy-Efficiency Contracts for Buildings in Monaco Your contact at SUSI Partners Miguel Sanz Director SUSI Energy Efficiency AG Feldeggstrasse 12 CH-8008 Zürich Tel: +41 44 386 98 00 Mob: +41 76 442 98 22 m.sanz@susi-partners.ch
  • SUSI Energy Efficiency Fund Page 6GIB Summit 2014 – Learnings from Energy-Efficiency Contracts for Buildings in Monaco Disclaimer The material provided herein is for informational purposes only. It does not constitute an offer to sell or a solicitation of an offer to buy any securities relating to any of the products referenced herein, notwithstanding that any such securities may currently be offered to others. Any such offering will be made only in accordance with the terms and conditions set forth in the Private Placement Memorandum pertaining to SUSI Energy Efficiency Fund (the “Fund”). Investments in the Fund will be subject to substantial investment restrictions and will be illiquid. Prior to investing, investors are strongly urged to carefully review the Private Placement Memorandum of the Fund (including the risk factors described therein), the Subscription Agreement to ask such additional questions of the investment manager of the Fund as they deem appropriate, and to discuss any prospective investment in the Fund with their legal and tax advisers in order to make an independent determination of the suitability and consequences of an investment. Investment in the Fund is suitable only for sophisticated investors for whom an investment in such a Fund does not constitute a complete investment program and who fully understand, and are willing to assume, the risks involved in the Fund. The role of any particular advisory board member may not be construed as his/her endorsement of any or all of SUSI Partner AG's representatives, activities, products, plans or strategies. This presentation is confidential and may not be reproduced or transferred, in whole or in part, to any other party without the express written consent of SUSI Partners AG. © Copyright 2014 SUSI Partners AG. All rights reserved.
  • SUSI Energy Efficiency Fund Page 7GIB Summit 2014 – Learnings from Energy-Efficiency Contracts for Buildings in Monaco