Uploaded on

visit: www.globalinfrastructurebasel.com …

visit: www.globalinfrastructurebasel.com
like us: https://www.facebook.com/globalinfrastructurebasel

More in: Technology
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
324
On Slideshare
0
From Embeds
0
Number of Embeds
2

Actions

Shares
Downloads
3
Comments
0
Likes
0

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. GREEN LINEAn environmental linear park for sports, culture and recreation
  • 2. Aguascalientes is located in the Mexican semi-desert, we depend on oneof the most overexploited aquifers in the country and it is considered ahigh risk zone of climate change.The East side of the City is the most densely populated and overcrowdingis a big problem here as is the lack of public recreational spaces.There is a high rate of domestic violence and many of the young criminalsin the City come from these neighborhoods.Eight out of twelve polygons of poverty of Aguascalientes are here.This is why, this administraton created the Green Line Project. 2011-2013 CONCEPTS
  • 3. The Green Line is the name we gave tothe underused land covering the 12”duct that transports oil for PEMEX.It is 15 kilómeters in lenght andbetween 15 and 60 meters wide indifferent sections. A total area of 50hectars. Its construction will be divided inthree stages.In 2011, 6 kilometers were built,finishing the First Stage. CONCEPTS
  • 4. •With the Green Line the Municipal Governent: •Compensates the lack of public spaces for social gatherings that are urgently needed. •Triggers social development for our most vulnerable citizens.•With the Green Line PEMEX: •Generates a replicable and scaleable model for the security of its installations. •Shows evidence of its commitment to the environment and society. PEMEX- AGUASCALIENTES: SHARED VISION
  • 5. To execute the project, the workwas divided in the followinglayers. LAYERS
  • 6. Parallel to the Green Line, the Hydraulic Recovery Plan “Purple Line” isdeveloping for the benefit of the entire City, with the rehabilitation of watertreatment plants to curve down water depletion from the aquifer.To irrigate the new park, 3 existing water treatment plants plus a new onewith great capacity will be installed, covering 100% of the waterrequirements of the Green Line. WATER INFRASTRUCTURE
  • 7. Nowadays, the roads along the Green Line are heterogenic in quality; some paved segments, some unpaved and even vast amounts of non delineated streets. The Green Line will consolidate all roads and will complete the vial structure. In the most affluent street nodes, pedestrian, vehicle and bicycle bridges and underpasses will be built to preserve the park´s continuity.The project includes the installation ofcompletely new illuminationinfrastructure with more than 3,300 ROADS ANDenvironmentally friendly street lamps, PUBLIC LIGHTINGtheir source of energy will come from14 solar panels.
  • 8. Care for the environment is the base of thisproject. With the inclusion of large grass areasand the plantation of more than 5,000 trees ofconsiderable size and adaptable to local climate,and the carful preservation of more than 210existing trees, we will help slow downdesertification and metabolize CO2 into oxygen. GREEN INFRASTRUCTURE
  • 9. Bicycle and jogging tracks are the bonestructure of the Green Line.The tracks are built with permeableconcrete, allowing rainwater to be absorbedinto the ground.With the support of the FederalGovernment, a Sports Club with an Olympicsize pool is currently being built.Courts for different sports and open airgyms, bike stations and traditional gamingareas are designed. SPORTS INFRASTRUCTURE
  • 10. Playgrounds for children are placed allalong the Green Line.Handicapped people and the elderly arealso considered in the design andequipment of all installations.Plazas and resting areas will be fullyequipped for family and communityintegration and recreation. RECREATIONAL INFRASTRUCTURE
  • 11. The site´s new conditions will facilitate diverse cultural activities such asdance, theatre events, music, visual arts, etc.Open air forums, concert areas, and different urban elements to allowstreet art are also part of the design.The Green Line will foster a vast amount of community activities likereading, crafts, workshops, programs for children and free film exhibitions. CULTURAL INFRASTRUCTURE
  • 12. 56% of overall population of the City lives around the Green Line. They represent the following: Around the Green Line Aguascalientes MunicipalityAverage age 21 years 25 yearsLess than 14 years of age 40% 29.36%More than 60 years of age 4% 7.84%Head of household is a woman 21% 20%Lack of public medical coverage 25% 22%Education 8 years 10.1 yearsChildren between 6 and 14 years of age who 8.66% 1.14%don´t go to school SOCIAL INTEGRATION
  • 13. With the Green Line, theMunicipality pioneers anefficient and polyfacetic projectfor social rescue that alsobenefits the local environmentalconditions.This is a public policy ofconvivance and safety basedon the corresponsability ofgovernment and citizens. SOCIAL INTEGRATION
  • 14. The first stage of the Green Line, with a lenght of 6 kilometers will be concludedby March 31st, 2012, impacting 31 neighborhoods directly. FEDERACIÓN ESTADO MUNICIPIO CONAGUA 30.0 mdp 11.7 mdp SEMARNAT 17.8 mdp 1.3 mdp CONADE 35.5 mdp 6.6 mdp 26.6 mdp SEDESOL 9.14 mdp 9.14 mdp SOPMA 10.0 mdp TOTAL 92.44 mdp 6.6 mdp 58.74 mdp A total investment of 14 million US dollars for 2011. FINANCIAL COMPONENT First Stage
  • 15. CONCEPTO PROCEDENCIA AUDITORIO DE BOX Y CANCHA DE USOS MÚLTIPLES CONADE CENTRO DE DESARROLLO COMUNITARIO (CEDECO) SEDESOL CASA DE CULTURA CONACULTA ALUMBRADO PÚBLICO SEMARNAT PASOS A DESNIVEL SCT PAVIMENTACIÓN (VILLERÍAS A VILLA DE N. SEÑORA DE LA SCT ASUNCIÓN) PUENTE SOBRE ARROYO DON PASCUAL MUNICIPAL PUENTE SOBRE BORDO SANTA ELENA MUNICIPAL REFORESTACIÓN SEMARNAT For the second stage, there is already a securedinvestment of 3 million USD. FINANCIAL COMPONENT Second Stage
  • 16. For the completion of the third andlast stage, the Green Line needs tosecure funding of 18 million USD.This is why we reach to theinternational community. FINANCIAL COMPONENT Third Stage
  • 17. With this project, we are improvingthe life of almost 450 thousandpeople in Aguascalientes that need itthe most, as we also contribute todiminish our environmentalvulnerability. ……for our future in common, now that we still have time. CONCLUSION
  • 18. Thank You