Installation pictures from Quick Build Modular Construction.

Installation pictures from Quick Build Modular Construction.
Tiwi Islands 2009

Statistics

Views

Total Views
516
Views on SlideShare
511
Embed Views
5

Actions

Likes
0
Downloads
1
Comments
0

2 Embeds 5

http://www.linkedin.com 4
http://www.lmodules.com 1

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment
  • Tiwi Islands Construction
  • Setting out the Modular Floor Frames
  • Modular Floor Frame Installation 2 days-4 Men
  • Onsite Installation of the qbModCon Patented Structural Extrusions ,External walls and Windows
  • In a fenced lot a few doors down, the concrete footings and floor frame has been laid that will form the basis of local school principal Leah Kerinauia's new home, which will be the first house in Nguiu to be privately owned

qbModCon Leah Nguiu Tiwi Islands 2009 qbModCon Leah Nguiu Tiwi Islands 2009 Presentation Transcript

  • qbModCon
    Tiwi Islands Construction Crew
    Tiwi Islands 2009 qbModCon Modular House
  • Tiwi Islands
    Day One Site Preparation for footings
  • Floor Frame Complete
    Modular Floor Frame Set Out
    The Concrete Footings
    Day two Floor Frame Completed with Concrete Footings
  • Installing The Flooring and Structural Extrusions
    Day 3 Install Viva Board Flooring and qbModCon Structural Extrusions
  • The Exterior Walls and Windows
    Day 4 Set-out External Walls with qbModCon Structural Extrusions
  • The Local Fella’s Working Hard
  • Installing the Ring Beam & Trusses
    Day 5 Complete External Walls and Tighten Down Ring Beam for Truss Installation
  • Installing the Trusses , Ridge and Hip beams
    Day 6 Continue Truss Installation -with Ridge and Hip Beam Extrusions
    Hip Beam Installation
    Installing Internal Walls prior to roof panels
  • Up Go the Roof Panels
    Day Seven-With the Truss Sections and qbModCon Ridge Beams in Place Install the Roof Panels
  • Internal Walls
    Day 8 Finishing of Internal Walls
    • Trim-Deck Roof Sheets
    • Available in Various colours
    • Powder coated Aluminium rails
    • Composite Decking
    • Heat Insulated Walls
    • R-Value 3.78
    • Cool in Summer
    • Warm in Winter
    • Eco Friendly
    • Cyclone Proof
    • Virtually Maintenance free
    Day Nine Install the Roof Sheets and all Flashings.
    Continue with the finishing touches on the exterior
  • The Internal Fit Out
    The Internal Fit Out
    • Acrylic rendered walls
    • Tiled Floors
    • Melamine Kitchen
    • Combination Upright stove
    • Double Stainless Sink
    • Cathedral Ceilings
    • Large Open plan
    • Kitchen Lounge and Dinning
  • 110 sqm 3 Bedroom Modular House
  • Sustainable Housing By qbModCon
    Exposed Trusses
    Cool and Spacious
  • The Finished Product
    Tiled Bathroom
    Full Kitchen
  • The Local Construction Crew
    Tiwi Islands
    Local Construction Crew
    • Guiseppe Tipiloura
    • Russell Yunupingu
    • Stephen O Keeffe
    • Ben Bokkerink
    • Zachary Bloor
    • Rodney Coleman
    • Malcolm Blair
    qbModCon3 Bedroom 110 sqm House with 18 sqm deck
    Nguiu 2009
  • Tiwi Islands 2009
    We would like to personally thank Leah Kerinauia all of the Friendly local Indigenous workers from Nguiu and Melville Island the locals at Tiwi Barge ,Brian Clancy from Tiwi Island Land Council, Bernard & Lynette(TLO) ,The Tiwi Collage ,The Licensed Contractors from MiBT and all the people who made this project successful
    Regards
    David Holmes