Jetta Reduces development lead-time by 30% with PTC Creo and PTC Windchill
Learn how Jetta reduces 90% of technical proble...
Jetta Reduces development lead-time by 30% with PTC
Creo and PTC Windchill

Jetta Company Limited

Jetta is an OEM manufac...
Jetta Reduces development lead-time by 30% with PTC
Creo and PTC Windchill

Jetta Company Limited

Jetta is an OEM manufac...
Jetta Reduces development lead-time by 30% with PTC Creo and
PTC Windchill

Read additional PTC Creo customers stories and...
Upcoming SlideShare
Loading in …5
×

Jetta reduces development lead-time by 30% with PTC Creo and PTC Windchill

849 views

Published on

Learn how Jetta reduces 90% of technical problems by using PTC Creo to tackle and solve issues in the design phrase.

Read additional PTC Creo customers stories and view video at http://ptc.co/skmT4 and on the PTC Creo blog => http://ptc.co/skn1f

Jetta is an OEM manufacturer which provide one-stop service from engineering design, tooling fabrication to production, quality and shipment management. They produce a wide variety of products from toy, consumer electronics to robots and aircraft components.


Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
849
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Jetta reduces development lead-time by 30% with PTC Creo and PTC Windchill

  1. 1. Jetta Reduces development lead-time by 30% with PTC Creo and PTC Windchill Learn how Jetta reduces 90% of technical problems by using PTC Creo to tackle and solve issues in the design phrase.
  2. 2. Jetta Reduces development lead-time by 30% with PTC Creo and PTC Windchill Jetta Company Limited Jetta is an OEM manufacturer which provide one-stop service from engineering design, tooling fabrication to production, quality and shipment management. They produce a wide variety of products from toy, consumer electronics to robots and aircraft components. “PTC Creo is the best platform to turn ideas into real products. It allows industrial, mechanical and electrical engineers to collaborate efficiently on designs, reducing development lead time.” Samson Yiu Asst. Engineering Director 2
  3. 3. Jetta Reduces development lead-time by 30% with PTC Creo and PTC Windchill Jetta Company Limited Jetta is an OEM manufacturer which provide one-stop service from engineering design, tooling fabrication to production, quality and shipment management. They produce a wide variety of products from toy, consumer electronics to robots and aircraft components. Initiatives Solution Results • Reduce lead time in product design and provide detailed 3D model to customer • PTC Creo allows Industrial, Mechanical and Electrical Engineers to work independently but collaborating their work which reduces back and forth communications • Development lead-time is reduced by at least 30% • Create prototype in short period of time for design verification • Reduce tooling lead-time • More than 90% of technical problems being tackled and solved in design phrase • Prototyping of model is easy and fast using rapid prototyping machine with the database created • Database can be used for tool design and fabrication which cuts the tooling cycles 3
  4. 4. Jetta Reduces development lead-time by 30% with PTC Creo and PTC Windchill Read additional PTC Creo customers stories and view video at http://ptc.co/skmT4 and on the PTC Creo blog at http://ptc.co/skn1f 4

×