Amberg Rail

Loading...

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

0 comments

Post a comment

    Post a comment
    Embed Video
    Edit your comment Cancel

    Favorites, Groups & Events

    Amberg Rail - Presentation Transcript

    1. Amberg Rail More Efficient. More Flexible. More Comprehensive.
    2. Partner: Amberg Rail For more than 25 years the Swiss global player Amberg Tech­ nologies has been one of the leading suppliers of applied system solutions for georeferenced data acquisition and processing in Your aim: infrastructure construction. Reliable and high-performance transport infrastructure, economically implemented and maintained Thanks to their indefatigable focus on railway surveying and the global implementation of their systems, the Rail division are Your demands: experts in railway construction and tunneling and enjoy many ■ Comprehensive infrastructure data years of cumulative experience. As a dependable partner of the management international railway industry, Amberg Rail provides project­ ■ Precise knowledge of the status of specific system solutions for the highest possible efficiency and your demands on the rail network ■ High cost-efficiency when building and flexibility in surveying for track construction, track maintenance and clearance profile surveying. maintaining track infrastructure ■ Reliable quality controls during the construction process Good to know Best technical design, comprehensive functionality, no-compromise reliability and quality stand for the high-quality engineering that allows Amberg Technologies to enjoy the recognition and trust of railway industry experts worldwide. With 60 employees, 2 sites and 31 distribution partners worldwide, Amberg Technologies supports professional users in more than 40 countries. Amberg Technologies is a member of the Amberg Group with head offices in Regensdorf, Switzerland. 2 3
    3. Solution: Amberg Slab Track Identify and inspect track positions to millimetre tolerances – with the integrated surveying solution for the construction and maintenance of slab track. To the millimetre at more than 300 kph The demand for alternative travel options for short-and mid-range routes has increased dramatically. This has led to the worldwide development of an Adapting to your needs Installation and inspection Economical advantages increasing number of high-speed rail The Amberg Slab Track solution is precision ■ No interruption/delay in processes: links. Speed, travel comfort and safety a flexible system to suit your entire ■ Track positions can be determined Surveying can be integrated into «just- are at the forefront. project. The hardware and software to 1 millimetre tolerance during in-time» production employed allow the best possible adap- installation ■ Process-oriented working procedures tation to your individual user require- ■ Deviations from the target position lead to minimisation of possible oper- Speeds of more than 300 kph coupled ments. In addition, Amberg GRP Fidelity are displayed in real time, facilitating ating errors, thanks to guided survey- with smooth running and high travel enables you to independently inspect considerably faster track installation ing processes comfort are just some of the advantages and adjust the system on-site. ■ Automatic evaluation and logging ■ Less repeat measurements thanks to of the «slab track» construction method. guarantee error-free and complete guaranteed accuracy To-the-millimetre accuracy is vital dur- documentation ■ Large time gain thanks to immediately ing track installation. Clients, supervisors available track geometry logs and operators of high-speed rail links ■ High surveying reliability, high avail- naturally count on reliable surveying ability, minimised system maintenance technologies with a guarantee of preci- costs thanks to integrated system of sion during the construction process. calibration management 4 5
    4. Solution: Amberg Tamping Amberg Technologies’ mobile surveying solution iden­ tifies track position errors as basis for installation and maintenance of track ballast. Independent of time and space, precise and efficient, the survey data are subsequently utilised in the tamping machine. Innovative preliminary surveying solution wanted Railway operators require well, main- tained track geometry in order to eco- nomically utilise their networks. Railway track construction and maintenance Fault-free preliminary surveying Data is completely integrated Economical advantages represent substantial cost items in infra- thanks to maximum mobility with direct communication to the ■ Reduction in logistics costs because structure management. Powerful means The Amberg Tamping solution is a tamping machine Amberg Tamping is not a tracked of production combined with flexible mobile surveying solution, «portable» in ■ Choice of sensors (GPS or TPS) and system and therefore no network procedures help to reduce these costs. the strictest sense of the word, which surveying mode (static or kinematic), user fees accrue allows the measurements made in depending on demands on accuracy ■ More time for actual track main- Railway network operators, track con- the run up to the actual maintenance and performance tenance work thanks to powerful work to be integrated into normal ■ Improved quality assurance and user preliminary surveying struction and track design companies therefore examine innovative prelimi- operations. Maintenance of Permanent guidance, for example by visual warn- ■ Optimum data quality thanks to error nary surveying solution options, which Way using tamping machines can be ing, if tolerances are not adhered to free survey data can lead to a reduc- accelerate the surveying process for effortlessly performed without waiting tion in tamping runs time. Up to 1,200 m of track per hour ■ Uniform track quality for the identifying track position errors and provide high-quality correction data for can be surveyed thanks to the use of tamping process maintenance and tamping machines. kinematic surveying methods. 6 7
    5. Solution: Amberg Clearance Exploit the comprehensive Amberg Clearance system solution to cover all your specific information require­ ments. From the identification of encroaching objects in real time to complete documentation of structures and clearance analyses including automatic clearance profile mapping. Unrestricted performance for rail routes Besides knowledge of track geometry, complete knowledge of the utilisable clearance in the rail network is abso- lutely essential for reasons of safety and Extensive clearance profile analysis Multifunctional with real time Economical advantages 3D data visualisation provided by the economy. From efficient surveying to comprehen- results ■ Faster surveying methods and system Amberg Clearance solution makes scan- sive documentation, Amberg Clearance ■ Recognition of problem zones during mobility reduce track possession times ner data analysis easy to understand. For Railway operators expect state-of- provides a proven and scalable surveying surveying allows immediate action and increase route availability for nor- example, objects encroaching on the solution. ■ Environment surveying and complete mal operations clearance envelope can be made visible the-art, flexible surveying, analysis and documentation solutions. These solu- track surveying can be completed in ■ Automatic evaluations accelerate by coloured markings in a virtual track tions need to be simple to use, impair ■ Modular trolley concept one pass result availability with reduced evalua- inspection. existing operations as little as possible ■ Homogeneous data and operating ■ Comprehensive profile data form the tion effort and reliably record all encroachments model basis for clearance envelope simula- ■ Once-only data acquisition for multiple ■ Single-point measurements for clear- tions for a number of track variations data utilisation reduces surveying and and proximate items. ance envelope and track surveying for ■ Faster and simpler result availability logistics costs Rolling stock manufacturers expect the highest demands on accuracy thanks to fully automatic evaluation ■ Liability minimisation thanks to proof ■ Mobile scanner solutions with the of standard-conform clearance enve- comprehensive data on structures and objects restricting their customer’s highest image quality for condition lope status clearance. documentation ■ Analysis and clearance envelope map- ping with clear result presentation and visualisation of all encroachments 8 9
    6. Hardware: Amberg GRP System FX GRP 5000 Amberg Laser Scanner Amberg GRP System FX is the proven, Profiler 5002: universal system solution for acquir­ ■ 100 Hz rotation frequency Georeferencing ing precise track geometry and track ■ Up to 20’000 measuring points environment data. Thanks to the modular per revolution Leica GPS: Leica TPS: ■ Range 1 m to 79 m For general surveying with lower For track surveys at the highest design the surveying system can be ■ ■ (GPS) accuracy demands precision optimally adapted to suit individual GRP 3000 ■ GRP System FX is compatible with ■ GRP System FX is compatible requirements. The system is easy to Leica GPS systems GPS1200 and Profiler 110 FX: with Leica total stations TPS1100 / transport, allowing surveying to be eas­ GPS500 TPS1200 / TPS2000 Motorised, reflectorless ily integrated in railway construction ■ ■ GPS integration kit including (ATR required) laser distance meter processes. antenna pole, installation and ■ Range 0.3 m to 30 m accessories ■ Range measurement Lightweight design: accuracy +/- 1.5 mm ■ Light, high-precision frame design ■ Easy to dismantle GRP 1000 for transport GPC 100 prism column: ■Prism carrier for raised prism position to reduce refraction effects Gauge sensor: ■ Accuracy +/- 0.3 mm ■ Measuring range -25 mm to + 65 mm relative to nominal gauge User ergonomics: ■ For track surveys at the ■ Measurement reference 14 mm below top of rail (TOR) – other highest precision ■ Fully adjustable push handle references available on request ■ Balanced device for safe «one-man» operation ■ Dead-man’s brake to pre- Precision wheels: vent unintentional trolley ■ High specification synthetic (PET) movement wheels for completely isolated Variable gauges: operation ■ GRP System FX operation ■ Stainless steel wheels with on common gauges isolated core – precise and between 1000 mm and robust – with non-electric con- 1676 mm tact from left to right rail ■ Additional gauges on request Isolated system: Odometer: Cant sensor: ■ Electrically isolated frame ■ Measurement of relative ■ Superelevation GRP Fidelity: track stationing measurement ■ Adjustment kit for regular ■ Accuracy < 0.5% ■ Accuracy +/- 0.5 mm system tolerance checks for 1,435 mm nominal gauge 10 11
    7. Software: Amberg Rail 2.0 Amberg Rail 2.0 is a com­ prehensive solution for all georeferenced, trackspecific surveying tasks. Amberg Amberg Amberg Slab Track Plus Tamping Plus Clearance Basic Software suite Software suite for und Plus for new slab track new track construc- Software suites for design tion/maintenance clearance surveying for tracks on ballast Railway line and track condition Customised user guidance Planning, analysis and evaluation management In Amberg Rail 2.0, surveying pro- Project-specific, field-tested and simple Logical and efficient management of cedures are controlled by defined to use, the Amberg Rail 2.0 software survey data in a project is a central issue processes with the aim of eliminating application is designed to facilitate in the Amberg Rail 2.0 solution. Among surveying errors. They are adapted optimum data flow between project other things, this is achieved via the to the various applications using simple management, survey data acquisition, management of various track conditions. and clear masks on the touchscreen. evaluation, export and reporting. The Survey data is allocated directly to the software can be configured by the ■ Control of track surveying Track ■ Recording track position ■ Profile point measurements corresponding tracks. user to suit individual requirements. adjustment in real time ■ Automatic computation of ■ Fully automatic scanning of National standards can be integrated ■ Analysis and documentation of correction values clearance envelope in the solution. geometric track quality ■ Direct data export to the ■ Evaluation and result tamping machine documentation 12 13
    8. Support: Amberg Rail Support Amberg GRP Fidelity Only a correctly adjusted surveying system provides reliable survey data. With Amberg GRP Fidelity you can be sure your system is 100% reliable at all times. ■ Examination and adjustment of all critical geometry and surveying elements ■ Safeguarding system accuracy in the framework of a quality assurance system, with test certificate on request ■ GRP Fidelity quality assurance programmes are offered locally by Amberg Service Centres Amberg OptiPlan™ Even the best application hides optimisation potential. Use Amberg Technologies’ servicing and support agreements for: Service and support in-house Global support from the Amberg ■ More economic efficiency Amberg’s distribution partners are Support Team ■ Unrestricted readiness carefully selected, regionally rooted Optimum support for the Amberg ■ Guaranteed high quality survey results organisations, whose employees under- distribution partners is the core task of ■ Risk minimisation for unanticipated repairs stand your particular issues and wishes, the Amberg Support Team. Alongside day ■ Minimum downtimes during surveying operations expertly and dedicatedly advise you to day back-up valuable information is and ensure that Amberg Rail products gathered and recorded to help Amberg and services provide a significant con- Rail solutions to constantly improve and tribution to the safety and efficiency of develop to match market and customer your transport infrastructure. requirements. 14 15
    9. Amberg Rail More Efficient. More Flexible. More Comprehensive. Identify and check track positions to the millimetre when installing slab tracks. Determine track position errors in track construction and maintenance for direct use in tamping machines. Exploit the compre- hensive Amberg Clearance solution – from examination of encroach- ing objects in real time to automatic clearance envelope analyses. Amberg Technologies has developed specialised system solutions for Profiler 110 FX – the infrastructure industry for more than 25 years.The unique combina- distance meter (RL, standard range): tion of systems development experience and industry know-how results Laser Class II compliant to FDA 21CFR Ch. §1040 10941 / en / 04.2009 / © 2009 Amberg Technologies AG in measuring systems characterised by precision instruments, practical Laser Class II compliant to IEC 60825-1 and EN 60825-1 system design and powerful software. Last but not least, Amberg Tech- nologies’ products have gained the trust and recognition of tunnelling GRP 5000: and railway industry experts thanks to a worldwide service and support Profiler 5002 / Profiler 5003 Scanner: network. Laser Class 3R compliant to EN 60825-1 Amberg Technologies AG Trockenloostrasse 21 CH-8105 Regensdorf Switzerland Phone +41 44 870 92 22 Fax +41 44 870 06 18 info@amberg.ch www.amberg.ch
    SlideShare Zeitgeist 2009

    + proudafriqueproudafrique Nominate

    custom

    78 views, 0 favs, 1 embeds more stats

    More info about this document

    © All Rights Reserved

    Go to text version

    • Total Views 78
      • 77 on SlideShare
      • 1 from embeds
    • Comments 0
    • Favorites 0
    • Downloads 0
    Most viewed embeds
    • 1 views on http://www.slideshare.net

    more

    All embeds
    • 1 views on http://www.slideshare.net

    less

    Flagged as inappropriate Flag as inappropriate
    Flag as inappropriate

    Select your reason for flagging this presentation as inappropriate. If needed, use the feedback form to let us know more details.

    Cancel
    File a copyright complaint
    Having problems? Go to our helpdesk?

    Categories