02.history.pm paula d.annettev.camileb.angelal

1,399 views
1,339 views

Published on

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
1,399
On SlideShare
0
From Embeds
0
Number of Embeds
1,132
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

02.history.pm paula d.annettev.camileb.angelal

  1. 1. NYC COLLEGEOF TECHNOLOGYBrooklyn Study DowntownSite Planning ARCH 1250 FALL 2012 Prof.Paul.King
  2. 2. NYC COLLEGE OF TECHNOLOGYMY TEAM ANGELA LOPEZ Email: Adraft@yahoo.comMY TEAM TOPIC Number:MY TEAM MAPPHOTOS & VIDEO ANNETTE VELIZINVENTORY Email: Annette.veliz@mail.citytech.cuny.edu Number: 9145654573ASSETSLIABILITIES CAMILE BROWNDESIGN STRATEGIES Email: Bcamile33@yahoo.com Number:9082059827CIRCULATIONSTRATEGYCLIMATE STRATEGY PAULA DAMASCENO Email: Pauladamasceno09@yahoo.comOUR NEXT STEP … Number:2034173100 Site Planning ARCH 1250 FALL 2012 Prof.Paul.King
  3. 3. NYC COLLEGE OF TECHNOLOGY  PAST EFFECT THE CURRENT AND FUTURE  During the 1900’s the water was off limits to everyone, due to theMY TEAM high level of pollution created by the warehouses. Today theMY TEAM TOPIC water at certain areas is open to the public. The Overall conditions of the water have improved.MY TEAM MAP  Today is a sustainable park with a great process of collecting rainPHOTOS & VIDEO water and plants that are self-dependent.  ARTIFACTS AND REUSESINVENTORY  Reuse in many materials. These materials are called salvaged materials which aids in the sustainability of the park.ASSETS RECYCLED WOOD- Park benches, cladding for new park structures, site furnishings, and wooden decking areLIABILITIES constructed from old growth Longleaf Yellow Pine that has been salvaged from Cold Storage Buildings on the uplands ofDESIGN STRATEGIES Pier 1. SALVAGED GRANITE- The “Granite Prospect” on Pier 1 has made of over 300 pieces of granite salvaged from theCIRCULATION reconstructed Roose900 linear Rosevelt Island Bridge.STRATEGY JANEs CAROUSEL- is a completely restored historic Carousel made by the Philadelphia Toboggan Company (1922).CLIMATE STRATEGY RAIL TRACKS- Right in the interception of Old Fulton St. and Water St. are the remaining of tracks from the late 1800’s. The rail roads were used to transport weight into to theOUR NEXT STEP … boats, to make the boat stable against high water currents.  LONG TERM IMPACTS AND FUTURE DEVEL. PLANS  The future plans of the Brooklyn Bridge Park are making it a 1.3 miles Site Planning long park that is sustainable, and self-dependent. ARCH 1250 FALL 2012 Prof.Paul.King
  4. 4. NYC COLLEGEOF TECHNOLOGYSite Planning ARCH 1250 FALL 2012Prof.Paul.King
  5. 5. NYC COLLEGE OF TECHNOLOGYMY TEAMMY TEAM TOPICMY TEAM MAPPHOTOS & VIDEOINVENTORYASSETSLIABILITIESDESIGN STRATEGIES The Fulton Ferry LandingCIRCULATION Water St.STRATEGY Old Fulton St. Jane’s CarouselCLIMATE STRATEGY Furman St. BQEOUR NEXT STEP … Brooklyn Bridge Manhattan Bridge Site Planning Piers. ARCH 1250 FALL 2012 Prof.Paul.King
  6. 6. NYC COLLEGE OF TECHNOLOGY Rail TrackMY TEAMMY TEAM TOPICMY TEAM MAPPHOTOS & VIDEO Robert Fulton WarehousesINVENTORYASSETS Inventor of theLIABILITIES FirstDESIGN STRATEGIES Steam powered FerryCIRCULATIONSTRATEGYCLIMATE STRATEGYOUR NEXT STEP … Site Planning ARCH 1250 FALL 2012 Prof.Paul.King Fulton Ferry Landing The Horse Trot
  7. 7. NYC COLLEGE OF TECHNOLOGYMY TEAMMY TEAM TOPICMY TEAM MAPPHOTOS & VIDEOINVENTORYASSETS Structures Material Reuse PlaygroundLIABILITIES GrassDESIGN STRATEGIESCIRCULATIONSTRATEGYCLIMATE STRATEGYOUR NEXT STEP … Site Planning ARCH 1250 Carousel FALL 2012 Prof.Paul.King
  8. 8. NYC COLLEGE OF TECHNOLOGY Plant SpeciesMY TEAM We observed during the field trip, That there were many beautiful self-dependentMY TEAM TOPIC Plants. This plants do not require any trims orMY TEAM MAP Special care, and thanks to the water collecting System the park has incorporated, they do not evenPHOTOS & VIDEO Require watering.INVENTORYASSETSLIABILITIESDESIGN STRATEGIESCIRCULATIONSTRATEGYCLIMATE STRATEGYOUR NEXT STEP … What an amazing view? I think tourist are mostly amazed by the wonderful view Site Planning that only the Brooklyn Bridge Park offers, NYC, and ARCH 1250 FALL 2012 of two of the most love bridges in New York City; The Brooklyn Bridge and The Manhattan Bridge. Prof.Paul.King
  9. 9. NYC COLLEGE OF TECHNOLOGYMY TEAMMY TEAM TOPICMY TEAM MAPPHOTOS & VIDEOINVENTORYASSETS UnappealingLIABILITIES Old BuildingsDESIGN STRATEGIES Old structure that need To be renovate or demolish.CIRCULATIONSTRATEGY During our visits we saw Many forgotten structures.CLIMATE STRATEGY Manhattan BridgeOUR NEXT STEP … Old Cracked Street Site Planning This Streets are hard to walk/ uncomfortable ARCH 1250 FALL 2012 To walk on, and I imagine hard to drive a car, Prof.Paul.King Through specially is you car is an expensive one.
  10. 10. NYC COLLEGE OF TECHNOLOGY • The Brooklyn Bridge park was the main port and ferry landing ofMY TEAM Brooklyn during the 1800’s to late 1900’s. We as a group believeMY TEAM TOPICMY TEAM MAP the park should Incorporate antique Ferries open to the public.PHOTOS & VIDEOINVENTORYASSETS • The ferry should be created in an identical way as those in theLIABILITIES past.DESIGN STRATEGIESCIRCULATIONSTRATEGYCLIMATE STRATEGY • Add more historical artifacts such as the railroads used toOUR NEXT STEP … transport materials, and include stands with specific description of Site Planning ARCH 1250 their use. FALL 2012 Prof.Paul.King
  11. 11. NYC COLLEGE OF TECHNOLOGYMY TEAM • Adding more bike lanes and maybe create a lane for strollers.MY TEAM TOPICMY TEAM MAPPHOTOS & VIDEOINVENTORYASSETS • Bringing history back.LIABILITIES  By adding small tracks along the water front. As they existed in the past.DESIGN STRATEGIES • Creating more sitting areas in high elevations to keep people enjoying the viewCIRCULATIONSTRATEGY away from circulations routes.CLIMATE STRATEGY • Creating suitable a waiting area for people taking the ferry.OUR NEXT STEP … • On weekends closing a few street and installing seats to attract tourist to come and Site Planning seat, as well as keeping them away from routes walking. ARCH 1250 FALL 2012 Prof.Paul.King
  12. 12. NYC COLLEGE OF TECHNOLOGY • One way to fix this microclimates is by planting trees with a light canopy. To let the adequateMY TEAM amount of sunlight throughMY TEAM TOPIC • This trees are also great during the winter because they loose all their leafs and let allMY TEAM MAP available sun light through.PHOTOS & VIDEO • Sun Shelters can help duringINVENTORY Summer, as well as duringASSETS the winter due to the greenLIABILITIES house effect.DESIGN STRATEGIESCIRCULATIONSTRATEGYCLIMATE STRATEGYOUR NEXT STEP … Site Planning ARCH 1250 FALL 2012 Prof.Paul.King Ideal Canopy
  13. 13. NYC COLLEGEOF TECHNOLOGYBrooklyn Study DowntownSite Planning ARCH 1250 FALL 2012 Prof.Paul.King

×