Case Study Bridge Relocation Project: Van Wert-Wall Street Bridge

476 views
437 views

Published on

Tom Barrett, Ohio Department of Transportation

Published in: Technology
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
476
On SlideShare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide
  • For more information on bridges that were built in Ohio during the 1950’s and the development of Ohio’s Interstate Highway System please visit the Ohio Department of Transportation Planning Division’s Website were The Third Ohio Historic Bridge Inventory Evaluation and Management Plan is available as a PDF document in its entirety.
  • Case Study Bridge Relocation Project: Van Wert-Wall Street Bridge

    1. 1. Case Study Bridge Relocation ProjectVan Wert-Wall Street Bridge Thomas P. Barrett: Environmental Specialist Office of Environmental Services
    2. 2. 1890
    3. 3. 1890 detail
    4. 4. 1901
    5. 5. Project IOC
    6. 6. EC within IOC
    7. 7. Relocated at County Historical Society Grounds
    8. 8. -“Pre-NEPA”/Early Planning of Section 106 (CULTURAL RESOURCE MANGAGEMENT)-Outreach and coordination with local parks and other potential users of historic bridges-Environmental Commitments for No Adverse Effect-4(f) does not apply to No Adverse Effect Historic Bridge Rehabilitation/Preservation-Increased benefit to the local stakeholders and economy
    9. 9. Thomas P. Barrett: Environmental SpecialistOffice of Environmental Services614-466-3932tom.barrett@dot.state.oh.us

    ×