The Yas Island
Upcoming SlideShare
Loading in...5
×

Like this? Share it with your network

Share

The Yas Island

  • 1,699 views
Uploaded on

The valuation of yas island, abu dhabi & the ferrari theme park

The valuation of yas island, abu dhabi & the ferrari theme park

  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
    Be the first to like this
No Downloads

Views

Total Views
1,699
On Slideshare
1,696
From Embeds
3
Number of Embeds
3

Actions

Shares
Downloads
26
Comments
0
Likes
0

Embeds 3

http://www.mefeedia.com 1
http://www.slideshare.net 1
http://www.slashdocs.com 1

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. The Ferrari Theme Park
    The Yas Island
    Project Finance
  • 2. Yas Island occupies a total land area of 2,500 hectares
    1,700 hectares is claimed for development
    Island will feature attractions such as a world-class motor sports racetrack, signature hotels, the Ferrari theme park, Water Park, and the Abu Dhabi destination retail development of 300,000 sq m retail area
    Unique International tourist destination expected to complete by 2014
    The Yas Island
  • 3. Work on Yas Marina Circuit began in February 2007, and has included:
    Employing a workforce of 14,000
    Investing 35 million man hours
    Shifting 1.6 million cubic meters of earthwork
    Laying 720,000 square meters of asphalt
    Pouring 225,000 cubic meters of concrete
    Installing 30 kilometres of special electronic ducts
    Installing 25 kilometres of electrical cabling
    Installing 17 kilometres of drainage
    Installing 22 kilometres of irrigation piping
    Landscaping 430,000 square meters of ground
    Planting 5,000 trees
    Setting 40 kilometres of curb-stones
    Yas-Marina Circuit
  • 4. Outlook
  • 5. Project Valued at USD 100+ billion
    Categorized sector: Real Estate | Leisure & Entertainment
    Financing Sources: Abu Dhabi Ministry of Presidential affairs, Abu Dhabi Investment Authority, BNP Paribas, Mashreq Bank, and HSBC are the project financiers.
    Value & Financing
  • 6. A project of records
    The largest indoor theme park and housing the fastest roller coaster in the world it is also the largest standing seam metal roof in the world
    The roof only is over 200.000 m2 whereas the total project volume including aluminum façade covering is approximately 300.000 m2. The equivalent of 50 football pitches!
    The Ferrari Theme Park
  • 7. Outlook
  • 8. Project Valued at USD 40 billion
    Categorized sector: Leisure & Entertainment
    Financing Sources: BNP Paribas, Mashreq Bank, and HSBC are the project financiers.
    Value & Financing
  • 9. Investment Break-up
  • 10. Started in 2006 the project called in for a AED 1,452.3 million
    Net asset value moved by 99% to AED 1,566.6 million in a 12-months period of time
    Developments under construction increased in value by 175.3 percent to AED 22,934.3 million from AED 8,332.0 million at end 2007
    Finance structure
  • 11. Post MoU of NIB & Aldar and Sorouh real estate in 2008, 90% of financing to YAS was done by NIB
    By mid-2009, the ferrari theme park was up & running
    The value of developments under construction increased by 119.2% to AED 18,260.1 million (2008: AED 8,332 million)
    Finance Structure
  • 12. Thank You