Your SlideShare is downloading. ×
  • Like
  • Save

Loading…

Flash Player 9 (or above) is needed to view presentations.
We have detected that you do not have it on your computer. To install it, go here.

×

Now you can save presentations on your phone or tablet

Available for both IPhone and Android

Text the download link to your phone

Standard text messaging rates apply

Comprehensive Campus Master Plan Open Forum #2 Presentation

  • 744 views
Published

 

Published in Education
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Be the first to comment
No Downloads

Views

Total Views
744
On SlideShare
0
From Embeds
0
Number of Embeds
0

Actions

Shares
Downloads
0
Comments
0
Likes
1

Embeds 0

No embeds

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
    No notes for slide

Transcript

  • 1. 10.27.2010 COMPREHENSIVE CAMPUS MASTER PLAN PITTSBURG STATE UNIVERSITY GouldEvans
  • 2. GOALS for the MASTER PLAN 

  • 3. GOALS THE MASTER PLAN SHOULD: BE PROACTIVE IN PROVIDING A PLANNED AND PURPOSEFUL FUTURE • ENHANCE THE LEARNING/LIVING ENVIRONMENT • ALIGN FACILITIES WITH STRATEGIC NEEDS AND GROWTH • BRIDGE E-W CAMPUS • INSTITUTIONALIZE ENVIRONMENTAL SUSTAINABILITY • MAXIMIZE OPERATING EFFICIENCIES • BE SAFE AND SECURE • DEFINE & ENHANCE CAMPUS AESTHETICS • ENHANCE ENGAGEMENT WITH EXTERNAL STAKEHOLDERS
  • 4. 40% 13% 20% 19% 8% PARKING DISTRIBUTION +/-4,000 SPACES
  • 5. Crossing
Signal Exis6ng Reduce

Speed
Limit
 Curb
Bulb‐out Crossing
 Signal Traffic
Signal 

  • 6. GUIDING CONCLUSIONS • MASTER PLAN PROVIDES A PATTERN FOR LONG TERM DEVELOPMENT • OVERALL CAMPUS GROWTH IS PLANNED AT 1% TO 2% PER YEAR, FOR NEXT 10 YEARS • KTC GROWTH IS AT 5% TO 7% PER YEAR, FOR NEXT 10 YEARS • SOME GROWTH WILL BE VIRTUAL GROWTH • CAMPUS WIDE SMALL CLASSROOM STOCK NEEDS TO BE INCREASED • HARTMAN REPRESENTS A REASONABLE OPTION FOR ADDITIONAL CLASSROOM/LAB STOCK • EACH DEPARTMENT HAS UNIQUE FACILITY ISSUES THAT WILL BE ADDRESSED ON A BUILDING BY BUILDING BASIS • BUILDING BY BUILDING RENOVATION WILL ADDRESS SPECIFIC CLASSROOM, ACCESSIBILITY, STUDY/WORK/SOCIAL SPACE, CONFERENCE, FACULTY OFFICES NEEDS • A SMALL STOCK OF GENERAL CLASSROOMS WILL BE UTILIZED AS A RELIEF VALVE FOR SCHEDULING ISSUES • PARKING IS EXPANDED IN EVERY OPTION PROPORTIONAL TO SPACE EXPANSION • HOUSING IS EXPANDED • THE CURRENT TRANSIT SYSTEM COULD BE MODIFIED TO SERVE CAMPUS NEEDS BETTER
  • 7. FINI
  • 8. PROCESS • MASTER PLAN WINDOW • IMPLEMENTATION/TIMING • CULTURE OF OWNERSHIP/DEPARTMENTAL IDENTITY • HOUSING