Your SlideShare is downloading. ×
0
Slausen Presentation
Slausen Presentation
Slausen Presentation
Slausen Presentation
Slausen Presentation
Slausen Presentation
Slausen Presentation
Slausen Presentation
Slausen Presentation
Slausen Presentation
Slausen Presentation
Slausen Presentation
Upcoming SlideShare
Loading in...5
×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Slausen Presentation

403

Published on

Renovation project I planned, implimented and finished ontime and within budget.

Renovation project I planned, implimented and finished ontime and within budget.

0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
403
On Slideshare
0
From Embeds
0
Number of Embeds
1
Actions
Shares
0
Downloads
0
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. Slauson Renovation Project Mary Renee Pirrello Project Management November 15th - December 21st 2010 Instructor: Paul Hawbaker, MsPM, PMP MBA 716
  • 2. Project ScopeFunctional KitchenLiving spaces ready to move inFunctional Bathroom
  • 3. Kitchen “The Plan”•Fix Pipes in ceiling•Install Insulation•Install Dry wall•Plaster, Sand andPaint walls•Install Sub-floor•Install Vinyl Flooring•Install Cabinets /Countertops•Install appliances•Frame and installinternal window
  • 4. Living Room “The Plan” •Install Insulation •Install Dry wall •Plaster, Sand and Paint walls •Remove Carpeting •Sand and Refinish wood floor •Repair Window Mechanisms
  • 5. Dining Room “The Plan” •Install Insulation •Install Dry wall •Plaster, Sand and Paint walls and ceilings •Remove Carpeting •Sand and Refinish wood floor •Repair Window mechanisms
  • 6. Kitchen Current
  • 7. Living Room Current
  • 8. Dining Room Current
  • 9. 2 nd Floor Hallway / Bedrooms •Patch and Paint bedroom walls •Drywall and paint Hallway walls and ceiling •Remove Carpet •Sand and finish all floors
  • 10. 2nd Floor Bathroom •Replace toilet •Install sink •Repair shower plumbing •Drywall and Paint North Wall
  • 11. Risks• Unable to complete renovation in time for tenants to move into the house as of Christmas. • Loss of rental income• Material / Supplies unavailable in time frame required• Scheduling of project workers.
  • 12. Slauson House Renovation Cost EstimatesWBS Name Labor Cost Materials Cost Combined Cost 1 Complete 2nd floor $630.00 $1,055.96 $1,685.96 2 Complete Dining Room $545.00 $345.90 $890.90 3 Complete Living Room $370.00 $542.93 $912.93 4 Kitchen and Rear Entry $883.00 $1,686.80 $2,569.80 $2,428.00 $3,631.59 $6,059.59

×