Avoiding Construction Claims through Guaranteed Maximum Contracts
Guaranteed Maximum Contracts or G-Max are becoming more popular as a corporate vehicle to
minimize risk, avoid claims and integrate the diverse interests of a complex project. Not to be
confused with cost plus, the G-Max contract is bid exactly the same as lump sum. The contractor
assumes the same risk, with a big stipulation: he's willing to share in the savings on the basis of
the owner's guarantee of fee and prompt payment of net cost.

There's no difference in cost or risk between Lump Sum and Guaranteed Max, but a big
difference in results, particularly on the owner's side of the fence. Don't let anyone tell you that G-
Max cost more. They don't! In fact, Lump Sum contracts are sometimes converted to G-Max for
the same price or less.

How do they work? In the following example, the best bid price received from a qualified general
contractor for a major renovation is $2.5 million. The owner's budget is $2.2 million, but
modifications and changes are anticipated for an additional $500,000 estimated construction
costs. Time is of the essence. The project must start immediately. The owner wishes to cut
$300,000 from the base contract without changing the scope of work and at the same time control
cost of the additions without giving away the $500,000. The contractor already dropped his price
on the first round of negotiations and won't budge off his $2.5 million. This project is an ideal
candidate for G-Max conversion.

The Owner who awards the contract should ask the contractor: "How much fee (or profit) do you
want in this project?" (Assume 6 percent). When the contractor states "$150,000," the owner
says: "Then what you are saying is that this project's actual cost is $2.35 million. We'll guarantee
your fee of $150,000, but we believe you can bring this project in for under $2 million by working
with some of our people who know construction. Do you see that as a realistic possibility? " If the
contractor answers "Yes," then the owner asks: "Would you then accept a Guaranteed Max
contract with the understanding that all costs saved below the $2.35 million will be returned to the
owner? " If the answer is "Yes," then you can establish the method of administration. If the
answer is "No," then you negotiate a 75-25 or 50-50 split in the savings and ask: "If we
guaranteed $500,000 of additional work to the base contract, will you agree to reduce your fee on
extras for the first $250,000 of additional work?"

"This is just the beginning, there are many possibilities. The yield at the end of the project often
exceeds the original objective (in this case $300,000) because the atmosphere has changed from
adversarial to partner. With proper controls, and by working with contractors as a team member, it
is possible to obtain greater yields on the bottom line than by any other contracting method.

G-Max contracts best achieve the owner's objective because a partnership is formed between
owner and contractor wherein the owner agrees to reimburse the contractor for actual cost as it
occurs, not from a schedule of values. This eliminates the distrust between parties. It also
eliminates the contractor's negligence to pay his suppliers and subcontractors because he gets
audited monthly. In today's market, this one issue alone will solve a lot of problems and insure
both savings and a smoothly running project.

The owner plays an active role throughout the entire process. The whole issue of cost is
manageable when the savings are shared, rather than negotiated from an adversarial position.
When the administration is properly set-up and organized, the benefits are truly amazing.
Because every purchase order and invoice received from the contractor is submitted to the owner
as backup, and because the owner agrees to cut the time for processing and pay promptly, a
positive and successful relationship is assured. Front end loading disappears, so does the
haggling with price.

There is another reason for using the G-Max contract system: It is the best vehicle for recovering
cost when pricing on extras becomes unreasonable. The fact that owners have tremendous
leverage on extras is not often mentioned among users, perhaps because it is a business
advantage. Consider once again the outrageous cost for a new door. Assume that the contractor
wants $1,500 to cut the hole and install a new door, plus another $50,000 to relocate the 4-inch
gas pipe that nobody knew existed. Assume also that the true cost of the piping relocation is only
$10,000, but the contractor will not back off his estimate. The work must start and he demands
approval. Under lump sum contracts owner's haven't got much choice, but under the G Max
system, even if you agree to the $50,000, all you've given away is the difference in fees, or
$2,400 instead of $40,000. Once the work is complete and true cost is known, even this can be
adjusted. There's a strong incentive here to be honest. Nothing like it exists with any other format.
Cost plus contracts claim to be the same, but in reality they do not have any incentive for shared
savings or efficiencies.

Still another advantage of G-Max occurs when work must start ahead of final drawings. There are
often issues that delay completion of the drawings and therefore start of construction. The G-Max
format allows owners to minimize risk when proceeding with work ahead of final drawings. It has
been my experience to start work on 30 percent completed drawings while obtaining a G-Max
price for the entire project based on preliminary drawings and outline specifications. That's an
extreme example, but it does happen.

The downside also needs stating. G-Max contracts require more work on the owner's part to
administer. The main effort involves defining what is cost. And if you are not interested in
collecting discounts, obtaining credits for small tools, establishing realistic labor rates, monitoring
rentals, and are not really prepared to act as a partner with your contractor in the project, then
this program is not for you. Don't try this if you don't have a strong administrator experienced in
general contracting. Contractors resent inexperienced owners questioning their decisions, and
they certainly aren't eager to have their books audited by anyone they don't trust. Properly set-up
and administered however, G-Max contracts are a win-win situation."

More Related Content

Similar to Avoiding Claims with G-Max Contracts

early morning retirement center
early morning retirement centerearly morning retirement center
early morning retirement centerSAIFULLAH MAHMUD
 
What is a Guaranteed Maximum Price Construction Contract in Arizona?
What is a Guaranteed Maximum Price Construction Contract in Arizona?What is a Guaranteed Maximum Price Construction Contract in Arizona?
What is a Guaranteed Maximum Price Construction Contract in Arizona?Charles Lotzar
 
types of contracts
 types of contracts types of contracts
types of contractsKEVINMISTRY8
 
Steel Street Powerpoint
Steel Street PowerpointSteel Street Powerpoint
Steel Street Powerpointacheerla
 
Home Renovation: 3 Rules for Hiring Contractors
Home Renovation: 3 Rules for Hiring ContractorsHome Renovation: 3 Rules for Hiring Contractors
Home Renovation: 3 Rules for Hiring Contractorsmaddeningwareho91
 
Solar Tax Equity Due Diligence Tips
Solar Tax Equity Due Diligence TipsSolar Tax Equity Due Diligence Tips
Solar Tax Equity Due Diligence TipsGreenzu Solar
 
5 Risks Construction Owners Face
5 Risks Construction Owners Face5 Risks Construction Owners Face
5 Risks Construction Owners FaceMark McCarthy
 
How to Build Successful Projects: A Guide for Owners and Developers
How to Build Successful Projects: A Guide for Owners and DevelopersHow to Build Successful Projects: A Guide for Owners and Developers
How to Build Successful Projects: A Guide for Owners and DevelopersKegler Brown Hill + Ritter
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract formskohwenqi
 
M5 - NEC3 Compensation Events:agreeing contractual change promptly, amicable ...
M5 - NEC3 Compensation Events:agreeing contractual change promptly, amicable ...M5 - NEC3 Compensation Events:agreeing contractual change promptly, amicable ...
M5 - NEC3 Compensation Events:agreeing contractual change promptly, amicable ...Project Controls Expo
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESPundlik Rathod
 

Similar to Avoiding Claims with G-Max Contracts (20)

early morning retirement center
early morning retirement centerearly morning retirement center
early morning retirement center
 
Negotiating Retainage
Negotiating Retainage Negotiating Retainage
Negotiating Retainage
 
Project contracting
Project contracting Project contracting
Project contracting
 
Lump Sum Contract
Lump Sum ContractLump Sum Contract
Lump Sum Contract
 
What is a Guaranteed Maximum Price Construction Contract in Arizona?
What is a Guaranteed Maximum Price Construction Contract in Arizona?What is a Guaranteed Maximum Price Construction Contract in Arizona?
What is a Guaranteed Maximum Price Construction Contract in Arizona?
 
Booming City Seminar.pdf
Booming City Seminar.pdfBooming City Seminar.pdf
Booming City Seminar.pdf
 
types of contracts
 types of contracts types of contracts
types of contracts
 
Steel Street Powerpoint
Steel Street PowerpointSteel Street Powerpoint
Steel Street Powerpoint
 
Home Renovation: 3 Rules for Hiring Contractors
Home Renovation: 3 Rules for Hiring ContractorsHome Renovation: 3 Rules for Hiring Contractors
Home Renovation: 3 Rules for Hiring Contractors
 
Solar Tax Equity Due Diligence Tips
Solar Tax Equity Due Diligence TipsSolar Tax Equity Due Diligence Tips
Solar Tax Equity Due Diligence Tips
 
5 Risks Construction Owners Face
5 Risks Construction Owners Face5 Risks Construction Owners Face
5 Risks Construction Owners Face
 
Tenant beware 2
Tenant beware 2Tenant beware 2
Tenant beware 2
 
How to Build Successful Projects: A Guide for Owners and Developers
How to Build Successful Projects: A Guide for Owners and DevelopersHow to Build Successful Projects: A Guide for Owners and Developers
How to Build Successful Projects: A Guide for Owners and Developers
 
Active re
Active reActive re
Active re
 
Lecture 4 - selection of contract forms
Lecture 4 - selection of contract formsLecture 4 - selection of contract forms
Lecture 4 - selection of contract forms
 
Contingency_Paper
Contingency_PaperContingency_Paper
Contingency_Paper
 
M5 - NEC3 Compensation Events:agreeing contractual change promptly, amicable ...
M5 - NEC3 Compensation Events:agreeing contractual change promptly, amicable ...M5 - NEC3 Compensation Events:agreeing contractual change promptly, amicable ...
M5 - NEC3 Compensation Events:agreeing contractual change promptly, amicable ...
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
Contracts 2
Contracts 2Contracts 2
Contracts 2
 
Ideal Contract for Multi Storey Building Construction
Ideal Contract for Multi Storey Building ConstructionIdeal Contract for Multi Storey Building Construction
Ideal Contract for Multi Storey Building Construction
 

Recently uploaded

Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
Pitch deck sample detail for New Business Proposal
Pitch deck sample detail for New Business ProposalPitch deck sample detail for New Business Proposal
Pitch deck sample detail for New Business ProposalEvelina300651
 

Recently uploaded (20)

Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
Pitch deck sample detail for New Business Proposal
Pitch deck sample detail for New Business ProposalPitch deck sample detail for New Business Proposal
Pitch deck sample detail for New Business Proposal
 

Avoiding Claims with G-Max Contracts

  • 1. Avoiding Construction Claims through Guaranteed Maximum Contracts Guaranteed Maximum Contracts or G-Max are becoming more popular as a corporate vehicle to minimize risk, avoid claims and integrate the diverse interests of a complex project. Not to be confused with cost plus, the G-Max contract is bid exactly the same as lump sum. The contractor assumes the same risk, with a big stipulation: he's willing to share in the savings on the basis of the owner's guarantee of fee and prompt payment of net cost. There's no difference in cost or risk between Lump Sum and Guaranteed Max, but a big difference in results, particularly on the owner's side of the fence. Don't let anyone tell you that G- Max cost more. They don't! In fact, Lump Sum contracts are sometimes converted to G-Max for the same price or less. How do they work? In the following example, the best bid price received from a qualified general contractor for a major renovation is $2.5 million. The owner's budget is $2.2 million, but modifications and changes are anticipated for an additional $500,000 estimated construction costs. Time is of the essence. The project must start immediately. The owner wishes to cut $300,000 from the base contract without changing the scope of work and at the same time control cost of the additions without giving away the $500,000. The contractor already dropped his price on the first round of negotiations and won't budge off his $2.5 million. This project is an ideal candidate for G-Max conversion. The Owner who awards the contract should ask the contractor: "How much fee (or profit) do you want in this project?" (Assume 6 percent). When the contractor states "$150,000," the owner says: "Then what you are saying is that this project's actual cost is $2.35 million. We'll guarantee your fee of $150,000, but we believe you can bring this project in for under $2 million by working with some of our people who know construction. Do you see that as a realistic possibility? " If the contractor answers "Yes," then the owner asks: "Would you then accept a Guaranteed Max contract with the understanding that all costs saved below the $2.35 million will be returned to the owner? " If the answer is "Yes," then you can establish the method of administration. If the answer is "No," then you negotiate a 75-25 or 50-50 split in the savings and ask: "If we guaranteed $500,000 of additional work to the base contract, will you agree to reduce your fee on extras for the first $250,000 of additional work?" "This is just the beginning, there are many possibilities. The yield at the end of the project often exceeds the original objective (in this case $300,000) because the atmosphere has changed from adversarial to partner. With proper controls, and by working with contractors as a team member, it is possible to obtain greater yields on the bottom line than by any other contracting method. G-Max contracts best achieve the owner's objective because a partnership is formed between owner and contractor wherein the owner agrees to reimburse the contractor for actual cost as it occurs, not from a schedule of values. This eliminates the distrust between parties. It also eliminates the contractor's negligence to pay his suppliers and subcontractors because he gets audited monthly. In today's market, this one issue alone will solve a lot of problems and insure both savings and a smoothly running project. The owner plays an active role throughout the entire process. The whole issue of cost is manageable when the savings are shared, rather than negotiated from an adversarial position. When the administration is properly set-up and organized, the benefits are truly amazing. Because every purchase order and invoice received from the contractor is submitted to the owner as backup, and because the owner agrees to cut the time for processing and pay promptly, a positive and successful relationship is assured. Front end loading disappears, so does the haggling with price. There is another reason for using the G-Max contract system: It is the best vehicle for recovering cost when pricing on extras becomes unreasonable. The fact that owners have tremendous
  • 2. leverage on extras is not often mentioned among users, perhaps because it is a business advantage. Consider once again the outrageous cost for a new door. Assume that the contractor wants $1,500 to cut the hole and install a new door, plus another $50,000 to relocate the 4-inch gas pipe that nobody knew existed. Assume also that the true cost of the piping relocation is only $10,000, but the contractor will not back off his estimate. The work must start and he demands approval. Under lump sum contracts owner's haven't got much choice, but under the G Max system, even if you agree to the $50,000, all you've given away is the difference in fees, or $2,400 instead of $40,000. Once the work is complete and true cost is known, even this can be adjusted. There's a strong incentive here to be honest. Nothing like it exists with any other format. Cost plus contracts claim to be the same, but in reality they do not have any incentive for shared savings or efficiencies. Still another advantage of G-Max occurs when work must start ahead of final drawings. There are often issues that delay completion of the drawings and therefore start of construction. The G-Max format allows owners to minimize risk when proceeding with work ahead of final drawings. It has been my experience to start work on 30 percent completed drawings while obtaining a G-Max price for the entire project based on preliminary drawings and outline specifications. That's an extreme example, but it does happen. The downside also needs stating. G-Max contracts require more work on the owner's part to administer. The main effort involves defining what is cost. And if you are not interested in collecting discounts, obtaining credits for small tools, establishing realistic labor rates, monitoring rentals, and are not really prepared to act as a partner with your contractor in the project, then this program is not for you. Don't try this if you don't have a strong administrator experienced in general contracting. Contractors resent inexperienced owners questioning their decisions, and they certainly aren't eager to have their books audited by anyone they don't trust. Properly set-up and administered however, G-Max contracts are a win-win situation."