601 Final Boards
Upcoming SlideShare
Loading in...5
×
 

601 Final Boards

on

  • 505 views

Fallingwater and Wescott Final boards

Fallingwater and Wescott Final boards
ARC601 Miami University

Statistics

Views

Total Views
505
Views on SlideShare
504
Embed Views
1

Actions

Likes
0
Downloads
7
Comments
0

1 Embed 1

http://www.slideshare.net 1

Accessibility

Upload Details

Uploaded via as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

601 Final Boards 601 Final Boards Presentation Transcript

  • Section Maintenance Campus Scale: 1/8” = 1’-0” Crossection Maintenance Campus Scale: 1/8” = 1’-0” Framing Axons Maintenance Campus Scale: N.T.S.
  • Diffuse: verb such ideas were diffused widely in the 1970s: spread, spread around, send out, disseminate, scatter, disperse, distribute, put about, circulate, communicate, purvey, propagate, transmit, broadcast, promulgate. adjective 1 a diffuse community centered on the church: spread out, scattered, dispersed, diasporic. 2 a diffuse narrative: verbose, wordy, prolix, long-winded, long-drawn-out, discursive, rambling, wandering, meandering, maundering, digressive, circuitous, roundabout, circumlocutory, periphrastic.
  • South Elevation Maintenance Campus Scale: 1/8” = 1’-0” East Elevation Maintenance Campus Scale: 1/8” = 1’-0”
  • Reacting to the site, the site plan uses the existing forests and site opening to determine the placement of the mainte- nance campus. The existing water treatment plant is one of the maintenance team’s responsibilities, and was the primary reason to place the maintenance campus right next to it. However, I did not want to create an industrial corridor along Tissue Lane, so I kept the service drive behind the water treatment plant and all other elements hidden be- hind natural elements. Keeping Tissue Lane pristine for the hiker’s experience, is another main goal of the project; I used trees and low profile dry fit stone walls to create this effect. Legend: work terrace warp lines parking/access drive existing building/topo lines maintenance shops woof lines admin proposed path material bays dry fit stone work Site Plan Maintenance Campus Scale: 1/32” = 1’-0” phase(2) research garden terraces/greenhouse trees tree/forest line
  • Fallingwater Maintenance Campus Plan- 2nd Floor Maintenance Campus Scale: 1/8” = 1’-0” Plan- 1st Floor Maintenance Campus Crossection Maintenance Campus Scale: 1/8” = 1’-0” Scale: 1/4” = 1’-0”
  • WESTCOTT HOUSE MASTERPLAN IN THIS MASTERPLAN SCHEME, THE DESIGN INTENTION CENTERED AROUND THE IDEA OF CREATING SOMEWHAT OF A SMALL CIVIC COMPLEX OF SORTS WITH THE NEW CONSTRUCTION AND THEN POSED ALONGSIDE THE EXISTING BUILDINGS ON SITE. THE EXISTING BUILDINGS RECEIVE FACELIFTS AND AR- CHITECTURAL INSERTIONS TO HELP CREATE A UNIFIED ARTS COMMUNITY. THE NEW CONSTRUCTION IS ON A PLINTH OF SORTS THAT CASCADE DOWN TO A COURTYARD THAT IS CREATED BY A RETAINING WALL THAT IS BASED ON LINES OF WARP AND WOOF OFF THE EXISTING AND NEW BUILDINGS. THE KISHO KUROKAWA TEA PAVILION IS THEN PULLED AWAY FROM THE CIVIC COM- PLEX, BUT CONNECTED BY A RAISED BRIDGED LEADING TO THE SIMPLE BUILDING. THE MECHANICS HOUSES, I AM PROPOSING TO BE CHANGED THE MOST. TAKING ALL INTERIOR PARTI- TIONS OUT OF THE SPACE TO CREATE A FREE FLOWING CLASSROOM/STUDIO ENVIRONMENT THAT GETS MUCH DAYLIGHTING FROM THE CLERESTORY AND LARGE WINDOWS/FRENCH DOORS AT THE EAST AND WEST WALLS. THE GROUND FLOOR WOULD FUNCTION MORE AS THE CLASSROOM SPACE, AND THE FIRST FLOOR WOULD BE THE STUDIO/WORKSPACE. THE PLAN OF THE AUDITORIUM/CONFERENCE SPACE IS NOT DESIGNED, BUT JUST AN IDEA OF HOW AN ARCHITECTURAL SOLUTION COULD FIT INTO THE IDEA OF THE TERRACES/PLINTH. THE GARAGE OF THE I-HOUSE BECOMES A FLAT ROOF WITH A PERGOLA ON TOP WITH RETRACTABLE FABRIC ROOFING. THIS IDEA IS ALSO USED IN THE DESIGN OF THE TEMPORARY PAVILION. THE FABRIC CIRCLES AROUND THE GROUNDPLAN WESCOTT MASTERPLAN EXTERIOR AND OPENS THE VIEW BACK OVER THE GARAGE UP TO THE WESTCOTT HOUSE, AND IS ALSO SCALE: 1/16” = 1’-0” PROVIDED PRIVACY BY THE FABRIC AND THEN THE AUDITORIUM/CONFERENCE SPACE AS WELL. NICHOLAS PETTIT . MIAMI UNIVERISTY . 2009 CROSSECTION WESCOTT MASTERPLAN SECTION WESCOTT MASTERPLAN SCALE: 1/16” = 1’-0” SCALE: 1/16” = 1’-0”
  • 1 2/3 4 12 8 5 9 10 7 11 11 6 13 LEGEND: 1 - TEMPORARY PAVILION 2 - CONFERENCE SPACE 3 - AUDITORIUM 4 - CAFE 5 - BOOKSTORE 6 - VISITORS’ CENTER/ADMINISTRATION 7 - STUDENT HOUSING 8 - KISHO KUROKAWA TEA PAVILION 9 - PARKING 10 - SCHOLAR HOUSING (PHASED) 11 - STUDIO/CLASSROOM SPACE 12 - DINING TERRACE 13 - WESTCOTT HOUSE
  • EAST SECTION MECHANICS’ HOUSES WEST SECTION MECHANICS’ HOUSES SCALE: 1/8” = 1’-0” SCALE: 1/8” = 1’-0” GROUND FLOORPLAN MECHANICS’ HOUSES SCALE: 1/8” = 1’-0” EAST ELEVATION MECHANICS’ HOUSES WEST ELEVATION MECHANICS’ HOUSES FIRST FLOORPLAN MECHANICS’ HOUSES SCALE: 1/8” = 1’-0” SCALE: 1/8” = 1’-0” SCALE: 1/8” = 1’-0”
  • NORTH ELEVATION TEMPORARY PAVILION SCALE: 1/8” = 1’-0” CROSSECTION WESTCOTT MASTERPLAN SECTION WESTCOTT MASTERPLAN SCALE: 1/16” = 1’-0” SCALE: 1/16” = 1’-0” SOUTH ELEVATION TEMPORARY PAVILION SCALE: 1/8” = 1’-0” SECTION TEMPORARY PAVILION SCALE: 1/8” = 1’-0” CROSSECTION TEMPORARY PAVILION PLAN TEMPORARY PAVILION SCALE: 1/8” = 1’-0” SCALE: 1/8” = 1’-0”
  • Woven: verb 1 flowers were woven into their hair: entwine, lace, twist, knit, intertwine, braid, plait, loop. 2 he weaves colorful plots: invent, make up, fabricate, construct, create, contrive, spin; tell, recount, relate. 3 he had to weave his way through the crowds: thread, wind, wend; dodge, zigzag.