Your SlideShare is downloading. ×

Thanks for flagging this SlideShare!

Oops! An error has occurred.

×
Saving this for later? Get the SlideShare app to save on your phone or tablet. Read anywhere, anytime – even offline.
Text the download link to your phone
Standard text messaging rates apply

Petrobras´ Business Plan - Investment Opportunities | CEO José Sergio Gabrielli de Azevedo - CCBJ

2,015

Published on

Published in: Business, News & Politics
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total Views
2,015
On Slideshare
0
From Embeds
0
Number of Embeds
2
Actions
Shares
0
Downloads
64
Comments
0
Likes
0
Embeds 0
No embeds

Report content
Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
No notes for slide

Transcript

  • 1. PETROBRAS’ BUSINESS PLAN:INVESTMENT OPPORTUNITIES José Sergio Gabrielli de Azevedo CEO November, 7th 2011 CCBJ 1
  • 2. Petrobras forecasts a sizeable rise in its exports ... 26 636 8 155 2 1 1655 2 200 (th boed) 227 196 834 478 497 387 2009 2010 2011 2015 2020 Crude Oil Oil products Ethanol 2
  • 3. ... which will happen, on the one hand, thanks to the expansion of its refining capacity ... PREMIUM I (2nd train) 300 kbpd (2019) COMPERJ (2nd train) 165 kbpd (2018) PREMIUM II 300 kbpd COMPERJ (2017) (1st train) 165 kbpd PREMIUM I (2013) (1st train) 300 kbpd 3.327 (2016) ABREU E LIMA 230 kbpd 3.095 (2012) 2.643 2.536 4.910 3.070 3.217(thousand bpd) 2.147 2.100 2.208 2.205 2.004 1.798 1.811 1.393 1.036 181 1980 2010 2011 2015 2020 Oil and NGL production - Brazil Throughput - Brazil Oil products demand (2 scenarios) 3
  • 4. … and, on the other, to the remarkable rises of its oil and gasproduction 6,418 142 246 1.120 3,993 + 35 Systems 125 180 2,772 618 2,516 2,575 2,386 96 96 93 99 141 +10 Post-Salt Projects 132 144 435 4,910 111 317 334 +8 Pre-Salt Projects 321 +1 Transfer of Rights 3,070 845’000 boe/day Transfer of Rights 1.855 1.971 2.004 2.100 Added Capacity Oil: 2,300,000 bpd 13 Pre-Salt 1,148 543 2008 2009 2010 2011 2015 2020 Oil Production - Brazil Natural Gas Production - Brazil Oil Production - International Natural Gas Production - International 4
  • 5. This growth will demand critical resources … Delivery Plan (to be contracted) Current Situation Accumulated Value Critical Resources (Dec/10) By 2013 By 2015 By 2020 Drilling Rigs Water Depth Above 2.000 m 15 39 37 (1) 65 (2) Supply and Special Vessel 287 423 479 568 Production Platforms (SS and FPSO) 44 54 61 94 Others (Jacket and TLWP) 78 80 81 83 Supply Vessel Drilling Rig FPSO DRILLING RIGS UNDER CONTRACT Water Depth 2006 2008 2010 2011 2012 2013 Up to 1,000 meters 6 11 11 1,000 to 2,000 meters 19 19 21 +2 +1 +1 Over 2,000 meters 2 3 15 +10 +13 +1(1) The contracts for two rigs reallocated from international operations expire in 2015(2) Long-term demand will be adjusted according to new assessments 5
  • 6. … that will be increasingly built in brazil …US$ billion 60 75,40% 75,60% 75,60% 74,60% 76,10% 80% 74,30% 70,00% 70% 50 72,80% 62,20% 67,20% 68,50% 57,00% 66,00% 60% 63,10% 64,00% 59,70% 59,90% 40 57,30% 50% 30 40% 30% 20 20% 10 10% 0 0% 2003 2004 2005 2006 2007 2008 2009 2010 2011 Investments in Brazil Total Investments Local Content (target) Local Content (actual) 6
  • 7. ... as already happens with platforms at the new shipyards Under Construction: P-55: Estaleiro Atlântico Sul – PE (hull) /QUIP- RS (modules) Recently built platform: P-57: BrasFels – RJ  Capacity: 180 thous. boe/day  Value: US$ 1.2 billion  Delivered two months ahead of schedule P-56: Brasfels (RJ) Under Construction: P-61: Brasfels (RJ) P-62: Jurong (ES) FPSO Cidade de Paraty: Brasfels (RJ) - modules and integration FPSO Cidade de São Paulo: Brasfels (RJ) - modules and integration Under Construction: P-63: QUIP (RS) 8 FPSOs (Pre-salt - P-66; P-67; P-68; P-69; P-70; P-71; P-72; P-73 ): Ecovix – Rio Grande (RS) P-58: Estaleiro Rio Grande –RS , UTC Engenharia S/A – RJ e EBE – RJ.  2 Jack-ups under construction (P-59 and P-60) in São Roque (BA)  Inclusion of 900 new suppliers per year in Petrobras Corporate Vendor List  13 new shipyards currently under construction, raising the total number to 50**Source: Sinaval 7
  • 8. Petrobras will implement cutting-edge technologies ... OIL/WATER SUBSEA RAW WATER SEPARATION INJECTION - Resolves limitations from growing - Increases production in existing water production systems - Separates water and oil under the - 3 subsea systems for pumping raw sea, reinjecting water and relieving water (with little treatment) to the size of the surface equipment pressurize the reservoir, increasing on the platform recovery factor without increasing - Field: Marlim (Nov/2011) surface systems. Pioneer in the world in such water depth - Field: Albacora (Dec/2011) 8
  • 9. … and through partnerships and integration with suppliers, researchcenters and other oil companies … International Research Centers Other operators Suppliers Brazilian Universities and Research Centers Expenditures (investments and funding): US$1.3 billion / year 9
  • 10. ... will continue to invest in R&D as a major source of competitive advantages % of revenuesUS$ millionSource: EvaluateEnergy 10
  • 11. 11 11

×