K E V I N S L O A N S T U D I ORepresentative Projects:The AT&T Center for the Performing ArtsSABRE World HeadquartersSpri...
Downtown CarrolltonParking Plan
Belt Line RoadCarroll StMainStEXISTINGPARKING-SEPT.2010Carroll Street81 Spaces“In” Square46 SpacesOn Street: 201Off Street...
PUBLICPARKINGTODAYVandergriff43 Off Street39 On StreetSpacesUnion At CarrolltonSquare 314 Apts.Phase 2 Opens 2/2014Public ...
Reference:
IH-35E and Belt Line RoadLooking South
IH-35EandBeltLineRoad
Square VandergriffDriveDARTStationRetentionPondHike andBike TrailMain StreetPioneer ParkGreenParkingLotCrosby Rec.Site
City of Carrollton’sInfrastructure Investment Costs 2008-2013:Item CostCatalyst Development Infrastructure $8,229,296Crosb...
Square update presentation
Square update presentation
Square update presentation
Square update presentation
Square update presentation
Upcoming SlideShare
Loading in …5
×

Square update presentation

128 views
96 views

Published on

Published in: Education
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
128
On SlideShare
0
From Embeds
0
Number of Embeds
0
Actions
Shares
0
Downloads
3
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

Square update presentation

  1. 1. K E V I N S L O A N S T U D I ORepresentative Projects:The AT&T Center for the Performing ArtsSABRE World HeadquartersSprint World HeadquartersVitruvian ParkGeorge W. Bush Presidential Library
  2. 2. Downtown CarrolltonParking Plan
  3. 3. Belt Line RoadCarroll StMainStEXISTINGPARKING-SEPT.2010Carroll Street81 Spaces“In” Square46 SpacesOn Street: 201Off Street: 191Gravely62 Spaces
  4. 4. PUBLICPARKINGTODAYVandergriff43 Off Street39 On StreetSpacesUnion At CarrolltonSquare 314 Apts.Phase 2 Opens 2/2014Public Garage125 SpacesMain St20 SpacesGravely10 Frost +52 SpacesOn Street84 Spaces“In” Square46 SpacesNEW On Street84 SpacesCity Lease18 SpacesNEW OnStreet84 Spaces75 On StreetSpacesOn Street: 335Off Street: 296 Net Gain Over 3 Years = 239 Spaces
  5. 5. Reference:
  6. 6. IH-35E and Belt Line RoadLooking South
  7. 7. IH-35EandBeltLineRoad
  8. 8. Square VandergriffDriveDARTStationRetentionPondHike andBike TrailMain StreetPioneer ParkGreenParkingLotCrosby Rec.Site
  9. 9. City of Carrollton’sInfrastructure Investment Costs 2008-2013:Item CostCatalyst Development Infrastructure $8,229,296Crosby Recreational Center Reconstruction $2,800,000Green Parking Lot $477,807South Main Street and Pioneer Park $1,200,000Retention Pond $950,000Hike and Bike Trail (Phase 1) $867,775Vandergriff Drive (Funded by NCTCOG Grant) $1,840,800Total $16,365,678

×