Square update presentation
Upcoming SlideShare
Loading in...5
×
 

Square update presentation

on

  • 113 views

 

Statistics

Views

Total Views
113
Views on SlideShare
113
Embed Views
0

Actions

Likes
0
Downloads
2
Comments
0

0 Embeds 0

No embeds

Accessibility

Categories

Upload Details

Uploaded via as Microsoft PowerPoint

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
  • Full Name Full Name Comment goes here.
    Are you sure you want to
    Your message goes here
    Processing…
Post Comment
Edit your comment

Square update presentation Presentation Transcript

  • 1. K E V I N S L O A N S T U D I ORepresentative Projects:The AT&T Center for the Performing ArtsSABRE World HeadquartersSprint World HeadquartersVitruvian ParkGeorge W. Bush Presidential Library
  • 2. Downtown CarrolltonParking Plan
  • 3. Belt Line RoadCarroll StMainStEXISTINGPARKING-SEPT.2010Carroll Street81 Spaces“In” Square46 SpacesOn Street: 201Off Street: 191Gravely62 Spaces
  • 4. PUBLICPARKINGTODAYVandergriff43 Off Street39 On StreetSpacesUnion At CarrolltonSquare 314 Apts.Phase 2 Opens 2/2014Public Garage125 SpacesMain St20 SpacesGravely10 Frost +52 SpacesOn Street84 Spaces“In” Square46 SpacesNEW On Street84 SpacesCity Lease18 SpacesNEW OnStreet84 Spaces75 On StreetSpacesOn Street: 335Off Street: 296 Net Gain Over 3 Years = 239 Spaces
  • 5. Reference:
  • 6. IH-35E and Belt Line RoadLooking South
  • 7. IH-35EandBeltLineRoad
  • 8. Square VandergriffDriveDARTStationRetentionPondHike andBike TrailMain StreetPioneer ParkGreenParkingLotCrosby Rec.Site
  • 9. City of Carrollton’sInfrastructure Investment Costs 2008-2013:Item CostCatalyst Development Infrastructure $8,229,296Crosby Recreational Center Reconstruction $2,800,000Green Parking Lot $477,807South Main Street and Pioneer Park $1,200,000Retention Pond $950,000Hike and Bike Trail (Phase 1) $867,775Vandergriff Drive (Funded by NCTCOG Grant) $1,840,800Total $16,365,678