  1. 1. Sustainable and improved water governance in the Brahmaputra basin: Issues and concerns Country level dialogueIndia Water, Climate & Hazard Programme Transnational policy Partha J Das Water, Climate improved dialogue forand Hazard Programme Aaranyak Guwahati-781028 AARANYAK water governance in Guwahati-781 028, Brahmaputra river Assam Email: partha@aaranyak.org 10 September, 2013 www.aaranyak.org Partha J Das
  2. 2. Brahmaputra-Meghna Basin(China, Bhutan, India, Bangladesh)
  3. 3. Physiography
  4. 4. Water governance issues in India • Decision making is top down sans community participation • Project implementation is non participative, often technically flawed • Lack of appropriate policies: policy gaps • No state level water policy in Assam till date • No specific integrated flood & erosion management policy in the basin states in India • Institutions in general lack transparency, accountability, efficiency, coordination and flexibility
  5. 5. Water governance issues in India • Inadequately empowered PRIs, DDC/DACs • No strong public activism against inappropriate water management at state and national levels • No attention to the problem of land degradation due to sand casting as well as land reclamation • Flood and sand adapted agriculture is a neglected area
  6. 6. Policy Gaps • Lack of an integrated flood and erosion management policy • Land acquisition policy for embankments(state and central) not pro-people • No locally acceptable R&R policy • No bilateral arrangement for exchange of information about river status and hydrological data for monitoring and forecasting and warning of flash floods
  7. 7. Transboundary Governance • India-Bangladesh: Advantage India • India-China: Advantage China • India-Bhutan: Strategically more feasible and manageable to deal with downstream hazards • Civil society participation in track II/III diplomacy • Sharing of knowledge among basin sharing countries
  8. 8. Governance :Inter-state issues • No common platform for regional panning of the basin • Clash of interest and priorities among states • NEWRA didn’t materialise • Difference in opinion on hydropower development(e.g. Arunachal Pradesh and Assam) • Upstream-downstream linkages in hydrogeomorphology not recognised in policy and practices
  9. 9. Need of AP-Assam collaboration • Flood and erosion hazards cannot be adequately mitigated in Assam without interventions in upstream in AP • Joint action of AP and Assam a must to prevent deforestation, boulder extraction, hill slope stabilisation and reduction of landslide potential and silt and water retention(e.g. in small structures) • No bilateral arrangement for exchange of information about river status and hydrological data for monitoring and forecasting and warning of flash floods
  10. 10. T+ PT+ T+ PT+ P- T+ P- T+ PT+ PT+ P+ T+ P+ T+ PT+ P+ T+ T+ P+ T+ P+ T+ P+ discharge station WMO station
  11. 11. (Dash et al., 2007) (Das, 2004) Das, 2004 Summer monsoon rainfall has significantly decreased over the NMMT meteorological subdivision @10 mm/decade; Annual rainfall show no trend.
  12. 12. South Asia Region Extreme(heavy) rainfall events have increased in magnitude and frequency in eastern Himalayan region Eastern Himalaya Region Increasing trend in the contribution of very wet days to the total precipitation amount indicates the rise in extreme rainfall events Dash et al(2007)
  13. 13. Trends in discharge in BPRB • Brahmaputra is most susceptible to reductions of flow, threatening the food security of an estimated 26 million people(Immerzeel et al, 2010) • Melting of glaciers leads to increased dry season runoff in the short term, in the longterm there could be a decline of dry season river runoff from glaciers, turning perennial rivers like the Brahmaputra into seasonal river systems(Cruz et al, 2007)
  14. 14. Trends in discharge in BPRB • There will be an initial increase in increase in mean rainfall over the upstream of Brahmaputra basin by about 25 %, till 2040s • Flow in the Brahmaputra basin will increase due to accelerated glacial melt till about the fourth decade of this century • But the overall summer and late spring discharges are eventually expected to be reduced consistently and considerably, at least by 19.6% on an average during the years 2046 to 2065(Immerzeel et al, 2010) • A very strong increase in peak flows is projected during 1961-2100(Gain et al, 2011)
  15. 15. CC and water availability of BPB • CC may alter both intensity and reliability of the monsoon, and thus affect both high and low flows leading to increased flooding but possibly also to increased variability of available water, both in space and time (Postel et al., 1996). • It may not be possible to utilise the high flows during floods and wet seasons to augment flow in the river in the dry season unless large storage systems are in place (Oki and Kanae, 2006).
  16. 16. Mean Discharge in Upper Brahmaputra Basin Annual discharge [m³/s] 1971-2000 Change [%] 2011-2040 2051-2080 2011-2040 2051-2080 COM 15501 14807 -22 -25 A1B 16815 14212 -15 -28 A2 17218 15081 -13 -24 B1 16909 15336 -15 -23 19823 Source: Brahmatwinn Project
  17. 17. ILMS: CC scenario assessment for IWRM Source: Brahmatwinn Project Mean discharge in the UBRB Past ERA B1 A2 A1B COM 30250 Mean discharge [mm] 25250 20250 15250 10250 5250 1970 1980 1990 2000 2010 Source: Brahmatwinn Project 2020 2030 2040 2050 2060 2070 2080
  18. 18. The Yigong Flash Flood, 2000 • A huge complex landslide occurred in the valley of the Zhamulongba stream • About 300 million cubic meters of displaced debris, soil and ice dammed the Yigongzangbu river - a large tributary of the Yarlungzangbo river (the upper stream of the Brahmaputra), in the east of Tibet. • The dam failed on June 10, 2000 and caused havoc of flash flood in the river Siang with an estimated property losses of not less than a billion rupees, 30 deaths, more than 100 people missing, and more than 50,000 homeless in five districts of Arunanchal Pradesh, India. The Jonai area of Dhemaji district of Assam was also heavily affected • Chinese scientists predicted the flash flood on the basis of rising of water level in the Yigongzangbu river in April 2000. • Indian authorities ignored the warning • Source: Li et al. 2001; GBPIHED, 2001
  19. 19. Climate change and sedimentation • The increase in the sediment yield in the Himalayan region is up to 25%, which can be detrimental for the existing water resources projects and has the potential to cause considerable damage to the environment. • Sediment yield will also increase in the NorthEastern region up to 25%. Source: 4X4 assessment, MoEF, GoI, 2010
  20. 20. Potentially Dangerous Glacial Lakes in Bhutan
  21. 21. Sandscape of Samarajan, Dhemaji, Assam
  22. 22. The menace of sand casting in Dhemaji district
  23. 23. Jamtola, India Drought in Assam in 2006 Photo: AP Photo/ Anupam Nath
  24. 24. Drought like situations & water crisis Moderate and intense drought like situations in Assam in 2005 and 2006 respectively Mentioned by the IPCC’s Fourth Assessment report of 2007 2006: 15 districts of Assam had below normal (nearly 40%) rainfall in the region More than 75% of the 26 million people associated with livelihoods related to agriculture were affected State suffered a loss of more than 100 crores due to crop failure and other peripheral affects.
  25. 25. Drought like situations & water crisis • Other states of the region also received rainfall 30 – 40 % below their normal rainfall except Mizoram. • Dry spell from October 2009 to March 2010 in Nepal, NEI, Orissa
  26. 26. Drought like situations & tea production • Early onset of winter in NEI in 2011 resulted in loss of 15 million KG of tea • Rainfall deficit for West Bengal at around 31% to 42% during the period January-March 2012 compared to the same period in 2011. • Upper Assam estates in the South Bank of the Brahmaputra are also experiencing severe drought conditions • Net estimated loss of tea production is 60% of normal (about 26 million KGs)
  27. 27. Scarcity of drinking water Kekuri village, in lean season: Lakhimpur & Dhemaji Dhemaji Tekjuri Barman, Dhemaji Kekuri village, Dhemaji Mingmang-Lakhimpur
  28. 28. Hydropower Projects, Large river dams and Climate change • Storage reservoirs of large hydro dams emit significant amount of green house gases(Methane, CO2) • Hydropower being a green energy source is a myth • Climate change impacts are not factored in designing the dams(e.g. DPR, EIA) • CC effects on hydrological regime of rivers may make many of the dams inefficient
  29. 29. Collapse of the coffer dam of the Lower Subansiri HEP on June 13, 2008 (Courtesy : PMSBV)
  30. 30. Burial of a School under sand: the All Assam Miri Higher Secondary School at Khamon Birina village, Matmora in 2009
  31. 31. FEWS System in the village Kesakathani in Dhemaji on 02.09.13
  32. 32. The FEWS site buried in silt upto about 6 feet on 08.09.13 after the floods during 5-6 September
  33. 33. The flood gauge placed in the river Jiadhal at village Dihiri
  34. 34. Transmitter unit of the FEWS
  35. 35. Receiving unit of the FEWS
  36. 36. Governance of food mitigation infrastructure Institutional mechanism of decision making WATER RESOURCE DEPARTMENT EXECUTIVE ENGINEER (Circle) Junior Engineer / Asst. Engineer / Asst. Executive Engineer SUPERINTENDING ENGINEER (Sub-Division) ADDITIONAL CHIEF ENGINEER (Division) Re view CHIEF ENGINEER (Division) Re view Role of local governance agencies District Administration Panchayats Autonomous Councils TECHNICAL ADVISORY COMMITTEE (<Rs. 75 million) Re view CENTRAL WATER COMMISSION (> Rs. 75 million) Re view PLANNING COMMISSION OF INDIA COMMUNITIES LOCAL GOVERNANCE AGENCIES Civil Society Organisation
  37. 37. Changes in area of sand deposition and sandy soil (1973-2010) Jiadhal River catchment, Dhemaji 171.03 180 Area in Square Kilometer 160 140 121.29 120 106.13 100 80 60 40 20 0 1973 1990 Year 2010
  38. 38. Changes in area of Rabi Crops(1973-2010) Jiadhal River Catchment, Dhemaji 120 110.34 100 Area in Square Kilometer 87.9 80 58.67 60 40 20 0 1973 1990 Year 2010
  39. 39. Changes in area of Kharif crop(1973-2010) Jiadhal River Catchment, Dhemaji Area in Square Kilometer 250 233.56 189.17 200 166.19 150 100 50 0 1973 1990 Year 2010
  40. 40. THANK YOU FOR YOUR ATTENTION Acknowledgement ICIMOD, Brahmatwinn Project, Original authors of papers cited, A>K> Mitra, all sources of other information , communities of our study sites

×