×
  • Share
  • Email
  • Embed
  • Like
  • Save
  • Private Content
 

Perficient Bcbsf 2009 Portal Conference Presentaitonppt

by on Oct 30, 2009

  • 1,982 views

This is the presentation delivered at the 2009 IBM Portal Excellence Conference. The topic is Zero to Production in 6 Months: A Blue Cross Blue Shield Case Study.

This is the presentation delivered at the 2009 IBM Portal Excellence Conference. The topic is Zero to Production in 6 Months: A Blue Cross Blue Shield Case Study.

Statistics

Views

Total Views
1,982
Views on SlideShare
1,879
Embed Views
103

Actions

Likes
1
Downloads
26
Comments
0

4 Embeds 103

http://blogs.perficient.com 95
http://www.slideshare.net 5
http://fyi-training.uwcoopextension.org 2
resource://brief-content 1

Accessibility

Upload Details

Uploaded via SlideShare as Adobe PDF

Usage Rights

© All Rights Reserved

Report content

Flagged as inappropriate Flag as inappropriate
Flag as inappropriate

Select your reason for flagging this presentation as inappropriate.

Cancel
Post Comment
Edit your comment

Perficient Bcbsf 2009 Portal Conference Presentaitonppt Perficient Bcbsf 2009 Portal Conference Presentaitonppt Presentation Transcript